Miscellaneous Details

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

KEY PLAN

60
‫تامفاح‬
‫فقوم‬

‫فقوم‬
‫تامفاح‬

150
300

‫فقوم‬
‫تامفاح‬
60 mm Asphaltic Concrete Wearing Course 50 mm Asphaltic Concrete Wearing Course
Prime coat Prime coat
150 mm Aggregate Base Course compacted to 100% M.D.D, CBR ≥80% 150 mm Aggregate Base Course compacted to NOTES
100% M.D.D, CBR ≥80%
Geogrid, Triaxial Type (for MSL) Geogrid, Triaxial Type (for MSL)
Geotextile Fabric as Specified Geotextile Fabric as Specified
300 mm Capillary Break Material 300 mm Capillary Break Material
Geotextile Fabric as Specified Geotextile Fabric as Specified
Subgrade Layer, Laid and Compacted as specified Subgrade Layer, Laid and Compacted as specified

ENTRY ROAD (LOW VOLUME ROAD): INTERNAL LOCAL ROAD (LOW VOLUME ROAD):
FLEXIBLE PAVEMENT (500,000m ESAL) WITH CAPILLARY BREAK LAYER FLEXUBLE PAVEMENT (200,000 ESAL) WITH CAPILLARY BREAK LAYER
LEGEND:
60
150

ROAD STRETCHES WITH CAPILLARY BREAK LAYER

Station (Km)
Road
60 mm Asphaltic Concrete Wearing Course 50 mm Asphaltic Concrete Wearing Course Name
From To
Prime coat Prime coat
150 mm Aggregate Base Course compacted to LR-30 0+600 1+550
150 mm Aggregate Base Course compacted to 100% M.D.D, CBR ≥80%
100% M.D.D, CBR ≥80%
Geogrid, Triaxial Type (for MSL) Geogrid, Triaxial Type (for MSL)
Geotextile Fabric as Specified ER-09 0+000 0+117
Geotextile Fabric as Specified
RAL-27 0+000 0+070
ENTRY ROAD (LOW VOLUME ROAD): INTERNAL LOCAL ROAD (LOW VOLUME ROAD):
FLEXIBLE PAVEMENT (500,000m ESAL) FLEXUBLE PAVEMENT (200,000 ESAL)
ASHPHALT BLOCK
ROAD 200 PAVING

TOP OF FINAL PAVEMENT

80
FLEXIBLE PAVEMENT CONCRETE BLOCK PAVEMENT

140
DRY PACK CEMENT
VAR.

200

400
TOP OF ASPHALT PAVEMENT FLUSH KERB SEE DETAIL A 200 MORTER
50 80

20

200
PRELIMINARY DESIGN

50 80
CONCRETE HOUCHING
VAR.

CONCRETE FOUNDATION APRIL-2024


400

200
200

VAR.

50
DETAIL A
FLUSH KERB

300
300

0 26/04/2024 APPROVED ISSUE D.R.


REV. DATE DESCRIPTION APPR'D
80 mm Thick Concrete Block Pavers, manufactured and laid as 1 Client
per Abu Dhabi Standard Construction Specifications 1
50 mm Sand Bedding Layer, laid as per Abu Dhabi 300 80 mm Thick Concrete Block Pavers, manufactured and laid as per
Standard Construction Specifications Asphaltic Concrete Wearing Course Abu Dhabi Standard Construction Specifications
200 mm Aggregate Base Course compacted to 100% M.D.D, CBR ≥80%** Tack Coat 50 mm Sand Bedding Layer, laid as per Abu Dhabi Standard Construction Specifications
Geogrid Layer, Biaxial Type Asphaltic Concrete Binder and/or Base Courses (As applicable) 200 mm Aggregate Base Course Consultant
Subgrade Layer, Laid and Compacted as specified Prime Coat Geotextile Fabric as Specified (As applicable)
Aggregate Base Course 300 mm Capillary Break Material (As applicable)
Geogrid, Triaxial Type (for MSL) Geogrid Layer, Biaxial Type

ON-STREET PARKING: INTERLOCKING CONCRETE BLOCK PAVEMENT (200,000 EASL) Geotextile Fabric as Specified (As applicable) Geotextile Fabric as Specified (As applicable) Project / Contract
300 mm Capillary Break Material (As applicable)
WITHOUT CAPILLARY BREAK LAYER Subgrade Layer, Laid and Compacted as specified
BLOOM LIVING – PHASE 4 CASARES
Geotextile Fabric as Specified (As applicable)
Subgrade Layer, Laid and Compacted as specified
ROADS AND INFRASTRUCTURE
DESIGN SERVICES
TYPICAL CONNECTION DETAIL BETWEEN FLEXIBLE PAVEMENT Drawing Title

AND CONCRETE BLOCK PAVEMENT


Typical Pavement & Kerb Details
(Sheet 2 of 2)
Subgrade shall be prepared as per clause 2.6.1. of TR-542-1 and as per below: JOB No: AD23071-0100D
DRAWN DESIGNED CHECKED APPROVED
• Subgrade in Fill: 300mm thick subgrade laid in two layers of 150 mm each with a minimum CBR of 30% at MDD of 95%.
R.S. P.P. D.P/K.S. D.R.
• Existing ground / Subgrade: Existing ground / Subgrade shall be scarified and re-compacted to achieve min. CBR of 10 % at 90% of MDD and
min. CBR of 30% at of 95% of MDD. DATE APRIL-2024 ACTUAL SIZE A1
• If the CBR of the existing material is less than 10, then the top 300 mm depth shall be removed and replaced with material having minimum CBR Drawing Scale. N.T.S
of 30% at MDD of 95%.
Drawing No.

AD23071-0101D-PD-TR- 301 0
KEY PLAN

01
02
‫تامفاح‬
‫فقوم‬

‫فقوم‬
‫تامفاح‬

‫تامفاح‬

‫فقوم‬
B NOTES
1. ALL DIMENSIONS & LEVELS ARE IN MILIMETERS UNLESS
OTHERWISE MENTIONED.

LEGEND:

ISOMETRIC VIEW-AT GRADE SIDEWALK RAMP

A A

PLAN OF RAISED CROSS WALK PAVING PATTERN DETAIL


BLOCK PAVING OPTION
PRELIMINARY DESIGN
MAY-2024

1 14/04/2024 ADM Comments Compliance D.R.


0 26/04/2024 APPROVED ISSUE D.R.
REV. DATE DESCRIPTION APPR'D
Client

Consultant

Project / Contract

BLOOM LIVING – PHASE 4 CASARES


ROADS AND INFRASTRUCTURE
DESIGN SERVICES
Drawing Title

MISCELLEANOUS DETAILS
(Sheet 2 of 3)
JOB No: AD23071-0100D
SECTION B-B DRAWN DESIGNED CHECKED APPROVED
BLOCK PAVING OPTION R.S. P.P. D.P./K.S. D.R.
SECTION A-A DATE MAY-2024 ACTUAL SIZE A1
BLOCK PAVING OPTION Drawing Scale. N.T.S.

Drawing No.

AD23071-0101D-PD-TR- 021 1
KEY PLAN

01
02
‫تامفاح‬
‫فقوم‬

‫فقوم‬
‫تامفاح‬

‫تامفاح‬

‫فقوم‬
Flexible Pavement Concrete Block Pavement
of the Roads

2%
NOTES
KERB
2% NATURAL EXISTING SOIL
TO BE BACK FILLED / AS DIRECTED
BY THE ENGINEER.

GRADING LEVEL

1:
1

1:1

LEGEND:
FORMATION LEVEL
300
LAP

APPROVED GEOTEXTILE FILTER FABRIC SUFFICIENT SLACK SHALL BE PROVIDED

DD
DURING INSTALLATION OF THE FABRIC TO AVOID TEARING WHEN PIPE BEDDING
AGGREGATE SURROUND AS SPECIFIED
PERFORATED PIPE (MIN. DIA 100)

100 (MIN.)
OD 100 (MIN.)

PRELIMINARY DESIGN
APRIL-2024

0 26/04/2024 APPROVED ISSUE D.R.


RAMPS AND SERVICE ROADS SINGLE CARRIAGEWAY REV. DATE DESCRIPTION APPR'D
Client

Consultant

SUPERELEVATION APPLICATION DETAILS Project / Contract

BLOOM LIVING – PHASE 4 CASARES


ROADS AND INFRASTRUCTURE
DESIGN SERVICES
DUAL CARRIAGEWAYS
Drawing Title

MISCELLEANOUS DETAILS
(Sheet 1 of 3)
JOB No: AD23071-0100D
DRAWN DESIGNED CHECKED APPROVED
R.S. P.P. D.P./K.S. D.R.

DATE APRIL-2024 ACTUAL SIZE A1


Drawing Scale. N.T.S.

Drawing No.

AD23071-0101D-PD-TR- 020 0
KEY PLAN

01
02
‫تامفاح‬
‫فقوم‬

‫فقوم‬
‫تامفاح‬

‫فقوم‬
‫تامفاح‬
NOTES
1. ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE MENTIONED.

ROAD LR-30
ROAD LR-30

ROAD RAL-27
ROAD LR-30

ROAD RAL-28
ROAD LR-30
ROAD LR-30

ROAD ER-09
LEGEND:

LR-33
ROAD LR-30
PROJECT BOUNDARY

ROAD
ROAD LR-30

23-RL DAOR
PHASE BOUNDARY

WCPM NETWORK

ROAD ER-09

ROAD LR-30
‫تامفاح‬
‫فقوم‬ BUS
STOP
SHARED PEDSTRIAN / CYCLIST NETWORK
MAIN RING ROAD
‫فقوم‬
CYCLE TRACK
‫تامفاح‬

‫تامفاح‬
STOP

STOP
‫فقوم‬
BUS

MAIN RING ROAD RO


BUS

AD
LR-
30 BUS STOP
‫تامفاح‬

STOP
‫فقوم‬

BUS

ROAD LR-26
PEDESTRIAN CROSSING
3 2
LR-

ROAD BR-02
AD
RO EDGE ZONE

-08
ROAD ER-10

ER
ROAD RAL-31

ROAD ER-10

AD
RO

-08
ER
ROAD LR-34

AD

ROA
RO
ROAD LR-34

D LR
-30
1
R-3
A DL
RO
ROAD LR-38
ROAD LR-34

ROAD ER-10

ROAD L
ROAD LR-39

R-30
ROAD LR-36 BUS
STO
P

‫ف‬
‫قوم‬
‫تا‬
‫مفاح‬

ROAD

40
LR-36 RO

LR-
AD
LR-

AD
35

RO

MAIN
ROAD LR-34

ROAD ER-10

RING
ROAD
30
LR-

RO
ROA

ROAD
D

LR-34

AD
D LR OA

ROAD
-36 R

RAL
ROAD LR-37

-29
‫فاح‬

LR-30
‫م‬
‫تا قوم‬
‫ف‬

PRELIMINARY DESIGN

40
ROAD

LR-
LR-37 STO
P
BUS

AD
APRIL-2024

RO
ROAD LR-34

PUMP STATION
0
SWPS2
R-1

41

ROAD
30

LR-
DE

AL-

AD
R
ROA

AD

RO

L
RO

R-34
ROAD LR-34 RO
L- 34 AD 0 26/04/2024 APPROVED ISSUE D.R.
LR-
RA

40
AD

REV. DATE DESCRIPTION APPR'D

-02
40
RO

LR-

AR
Client

AD
AD

RO
RO
0
R-1

RO
DE

AD
A

ROA
L
RO

R-3 RO
7

D
AD

LR-3
LR- R4-TH-272

40

4
R4-TH-271

R4-TH-270 Consultant

MA
R4-TH-269

IN
RIN
R4-TH-268

GR
OA
5

D
R4-TH-267

L-3
RA

42
AD

LR-
R4-TH-266

RO

AD
Project / Contract

RO

RO
AD
LR-
BLOOM LIVING – PHASE 4 CASARES

34
ROADS AND INFRASTRUCTURE
PUMP STATION
SWPS1 RO
AD
DESIGN SERVICES
RO RAL
AD -32

34
LR-

0
Drawing Title

L-1
LR-
34

-02

RA
AD
RO

AR

AD
RO
A

AD
DL

RO
R-3

RO
7

Pedestrian & Cycle Path

8
R-0
(Sheet 1 of 1)

A DL
RO
JOB No: AD23071-0100D
34

DRAWN DESIGNED CHECKED APPROVED


LR-
AD
RO

RO R.S. P.P. D.P./K.S. D.R.


AD
RO 20 LR-
AD LR- D 08 DATE APRIL-2024 ACTUAL SIZE A1
ER OA
-05 R
PUMP STATION Drawing Scale. 1/1500@A1
SWPS4 PUMP STATION
SWPS5
RO B
ST US
Drawing No.
AD OP

RA
R4-UT-10

L -3
3
R4-OS-22
‫م‬
‫فقو فاح‬
‫تام‬

AD23071-0101D-PD-TR- 104 0