OLLU CO
By Registered Post with Acknowledgement Due
(This document contains 06 (Six) Pages) PPCC
Air Consent to Operate is hereby renewed under Section 21 of the Air (Prevention and
Control of Pollution) Act, 1981, as amended (hereinafter referred to as The Act) and the Rules ad
Orders made there under for emission continuation of emission to B. Umamahesh, The Factory
Manager, M/s. Devi Innoventures LLP, 5th Main Road, PIPDIC Industrial Estate, Mettupalayam,
Oulgaret Municipality, Puducherry.
CATEGORY: ORANGE SIZE LARGE LOCATION: INDUSTRIALL
(hereinafter referred to as The Applicant) authorizing them to Operate the industry, @ 5th Main
Road, PIPDIC Industrial Estate, Mettupalayam, Oulgaret Municipality, Puducherry, subject to
following special and general conditions:
Validity of the Consent:
() This Air Consent (To Operate) Renewal order is valid for One (01) Years Only, upto 31.12.2022
(ii)The Project Proponent shall apply for obtaining Renewal of this Consent order, before Sixty (60)
filled in,
Days of the expiry of the same, as imposed in (i) above, via www.ponocmms.nic.in, duly
as
shall be entertained.
per prevailing orders. No other mode of application
AENCE
E
To,
B. Umamahesh, The Factory Manager, M/s. Devi Innoventüres LLP, (Formerly M/s. Mohan Breweries
5th Main Road, PIPDIC Industrial Estate, Mettupalayam, Oulgaret
& Distilleries Ltd.,),
Municipality, Puducherry 605 010.
Copy to:
1.The Functional Manager, District Industries Centre, Thattanchavady, Puducherry 605 009,
2.The Commissioner, Oulgaret Municipality, Jawahar Nagar, Boomiyanpet, Puducherry 605 009.
3. The Junior Scientific Assistant, Puducherry Pollution Control Committee, Puducherry - 605 005.
4. The Assistant Environmental Engineer (HW Section), Puducherry Pollution Control Committee,
Puduchery - 605 005.
1
SPECIAL CONDITIONS
1. Notwithstanding anything
contained in any other Act or Rules Notifications
or Notifications this clearance
thie
of control
4. The applicant shall install a comprehensive air pollution control system consisting
as to achieve thelevel of
equipment as detailed below and operate and maintain the same continuously so
pollutants to the following standards:
Relevant - parameters &
Chimney/ Stack Control Equipment
standard limits
Particulate Matter (PM) - 150
Stack No. 1 - End Port Recuperator and Stack of
mg/Nm3 ; Total Flourides - 5.0
Continuous Regenerative Height 40 m from GL
Furnace mg/Nm3
2
3
Diesel (in case of New DG
Set
installation only Subject to
-
0.76
6. The
obtaining CTE/NOC)
applicant shall provide ports in the chimney/stack and facilities
monitoring the air emissions and the same shall be open for 1adder, platform
requirements for such as
per ete.as
Board's staff. The inspection anduse Dy
Chimneys. Stacks of the unit shall be named as Stack No.1, Stack No. 2, etc., as
per Clause 3 & 4 of this Section, of this Consent
Order. The chimney/stacks attached to
Sources of various
emissions shall be painted/ displayed to facilitate identification. The unit shall comply
with the guidelines mentioned in Emission
Regulation, Part II, published by the CPCB.
7. The proponent shall take
measures to comply with the
provisions laid down under Noise pollution
(Regulation and Control) Amendment Rules, 2010 and control the noise to the prescribed levels.
8. The industry shall take
adequate measures for control of noise from its own sourceso as to comply
with the standards as
may be applicable. Noise Level should not exceed 75 dB (A) and 70 dB (A)
during daytime and night times respectively.
9. DG Sets shall meet the noise and air emission standards prescribed under The Environment
(Protection) Rules, 1986 and shall be provided with integral acoustic enclosure. The applicant shall
comply with order of Hon,ble National Green Tribunal dated 11.05.2015 in Appeal No. 12(Tsc) of
2013, Original Application No. 17(THC) of 2013 and Original Application No. 32ITHC) of 2013 and
implement all conditions in the CPCB Guidelines for DG Set. The DG set which are 15 years old or
completed 50,000 Hours of Operation shall not be used.
10.The unit shall provide minimum stack height (H) to the DG sets as per the formulaH =h + 0.2
sQRT (KVA) where KVA= total generation capacity and h= Height of the building where DG set is
installed.
1. The Industry shall take appropriate measures to ensure that the ground level concentration shall
comply with revised National Ambient Air Quality Standards dated 16.11.2009 notified by
MoEF&CC, GOL.
12. There shall not be any be perceptible odour outside the industry's premises.
3. Any change in the emission source / process / Air Pollution Control System / fuel shall be brought
to the notice of this Authority in writing and fresh consent has to be obtained, as required.
4. The unit shall submit the Environmental Statement in Form V before 30th September every year
as per the Rule No.14 of the E(P) Rules, 1986 & Amendments.
15. Specific Conditions
(a) This Air Consent Order (To Operate) Renewal is issued towards the unit's online Application,
submitted vide PPCC - Online Consent Management Portal - www.ponocmms.nic.in, vide No. 245563
dated 25.01.2022.
(b) The Name and Style of the unit, viz., "M/s. Mohan Breweries and Distilleries Ltd.," herewith
stands amended to "M/s. Devi Innoventures LLP.," henceforth.
(C) No other product, other than permitted, viz,, Glass Bottles (Soda Lime Glass) shall be
manufactured, in the unit and the production capacity shall not exceed, as permitted, viz., 240 TPD,
without obtaining prior consent from this Committee.
(d) For Raw Material Handling and Feed to End Port Continuous Regenerative
Furnace
i) The Raw Materials, such as, Sand, Soda Lime Glass Cullets, Soda Ash, Lime Stone, Sodium
Sulphate, Selenium and Carbon, shall be stored in separate and closed sheds, such that, there is no
wind action on the same to create
any fugitive emissions.
(ii) The Raw Materials shall be mixed, transported and loaded into the in wet condition only,
through mechanized Conveyors and Mixers, to avoid dust emissions. Furnacg,
3
(e) For End Port Continuous
Regenerative Furnace:
The Furnace operation and maintenance
shall be automated and the same shall
Ssatety installations, such as, Fire Hydrant Systems, Emergency Response Systems etc. be with necessasai
11) The Recuperator shall be cleaned periodically and the ash collected shall be stored and disposed off
appropriately.
(1) The unit shall provide proper PPEs to the emplovees and ensure operation of the unit, with utmost
satety.
h e Storage of Furnace Oil, Diesel and LPG shall be as per the prescribed safcty norms, such as
OISD 156, PES -Explosives Act, etc., as applicable.
(h) There shall be no any
spillage of any oil on the land in and around the premises.
The revised standards mentioned under the Special Conditions, shall be applicable for the whole
production capacity of the unit and shall be in force, in accordance with the Rules / Laws /Notifications,
issued under the Environment (Protection) Act, 19986 and its amendments till date.
G) Implementation Schedule for Strict Compliance
D The unit shall engage an NABL Accredited Laboratory, for collection and analysis of samples, for
Parameter of Ambient Air Quality, Emissions of the Furnace Stack, Stacks of DG Sets and Noise
Parameters, as imposed vide this Consent Order and the reports of the same, shall be submitted to this
Committee, once every Six (06) Months. This is for Strict Compliance.
T h e unit has obtained and submitted clearance from the PESO, for storage and deployment for use
of LPG, Furnace Oil and Diesel, inside the premises of the unit. However, the unit has not obtained and
submitted clearances from the District Administration, Puducherry, Inspector of Factories and Boilers,
Puducherry and the Fire Department, Puducherry for the same. The copies of the same shall be obtained
and submitted to this Committee, on or before 31.08.2022.
(in) The unit shall obtain clearance under the provisions of the Hazardous and Other Wastes
(Management and Transboundary Movement) Rules, as amended till date, for storage and disposal of
Waste Bags, Drums / Barrels of Sodium Sulphate and Selenium, respectively, Waste Oil, oil Soaked
Cotton Wastes, Waste Oil Filters, etc., from the DG Sets and the Fly Ash obtained from the Recuperator
and the copy of the same shall be submitted to this Committee, on or before 31.08.2022. The above said
wastes shall be segregated, stored and disposed off as per the provisions of the Hazardous and Other
Wastes (Management and Transboundary Movement) Rules, as amended till date, as applicable.
Disposal of any of the above said wastes in and around the unit, is strictly prohibited.
(iv) The unit shall properly collect the carton boxes and other paper based and / or plastic based packing
material and shall dispose the same to the authorized recyclers. The unit shall obtain clearance under the
Plastic Waste Management Rules, 2016, as applicable and the copy of the same shall be submitted to
this Committee, on or before 31.08.2022. Disposal of any of the above said wastes in and around the
unit is strictly prohibited.
(v) The unit shall scrap the existing DG Sets (05 Nos.) each of 1000 KVA, which are more than 15
years old and shall be replaced with newer ones, as per the prevailing Guidelines for DG Sets, as
notified vide Clause 9 of the Section "Special Conditions", of this Consent Order. The unit shall ensure
that, the total capacity of the DG Sets shall not exceed the Sanctioned Power Load of the unit. This is
for Strict Compliance of the same and compliance statement shall be submitted to this Committee, on or
before 31.08.2022. Before installation of any new DG Set, the unit shall apply and obtain separate
clearance (CTE) from this Committee, via, PPCC Consent Management Portal - www.ponocmms.nic.in,
duely filled in, in prescribed forms and consent fees for one year.
(vi) The unit shall connect the Online Continuous Emission Monitoring System for analysis of
Particulate Matter and Total Fluorides in the End Port Continuous Regenerative Furnace Stack, to the
Server of PPCC,for seamless transfer of data, on or before 31.08.2022.,
wwt
4
(V) in case of
non-compliance even one of the above said 6 Nos. of
of
imposed above, this Consent
order becomes void, the fees Implementation senudules,
Lakhs and
Fitty Thousand Only)) gets forfeited, the unit paid so far (Rs. 2,50,000/-
(Kupets
shall be further prohibited to apply
renewal of this
Consent Order, which means the unit 1or
shall immediately stop the operations an
the unit, and
the unit shall attract the penalties environmental compensation as _os
per tne
prevailing provisions of the Rules/ Notifications Laws. This is for deemed
Instantiy, as the unit has already failed to comply with the implementation schedules strict
issued earlier and compliance,
has sought additional time schedule.
(k) For Better Environmental Management:
Energy conservation measures like installation of energy efficient lighting systems, like LEDS,0
ghting the areas inside and outside the building should be integral part of the design. Usea urL S 1
LED's should be properly collected and disposed off/ sent to for recycling as per the prevallng
guidelines / rules of the regulatory authority to avoid toxic contamination.
for streetlights within
(I1) Use of Solar panels may be adopted to the maximum extent possible, especially
the campus.
to be planned and intimated to this committee.
(IIL) Energy Audit and annual reduction pattern
(iv) Systematic Plantation of suitable varieties of trees, shrubs and climbers etc., shall be done in phased
manner, with plan budget over a period of years covering the entire available vacant area.
The unit shall declare itself an "Single Use Plastic Free Zone" and maintain
the same, in compliance
(vi)
G. O. Ms. No. 18/Envt./2019
with the Notification issued by this Committee on Ban of Single Use Plastics,
dated 02.08.20119.
dated 30.07.2019, published in the Gazette of Puducherry, Part I Extraordinary,
CHNOLOS
GY&ENT
CETEC Member Secretary
MEMBER SECRETAR
PUDUCHERRY POLLUTION
CONTROL COMMITTEE
PUDUCHERRY.
PUC
DUCHER
5
GENERAL CONDITIONS 8 MAR
Notwithstanding anything contained in this No-Obiection Certificate from
Poltion Angle, ed
ducherry Pollution Control Committec
hereby reserves its right and power under Section 27 (2)of theof
water (Prevention and Control of Pollution) Act 1974 and Section 21 (4)
of the
Polution) Act, 1981, to Review Revoke any or all the conditionsAir (Prevention
and Control of
imposed herein
Cancel, refuse, modify or stipulate additional conditions for the purpOse of the Act by the
Committee, if conditions of the consent
granted are not fulfilled.
loentio cant shall not undertake any expansion, modernization, diversification, change of
1Ocalon, change of process, change of products etc.. without the prior approval / clearance rom this
authority.
3. The
applicant shall take all possible measures to create
4.
pollution free surroundings.
Sufficient green belt shall be
provided all around the unit.
. This
No-Objection Certificate from Pollution Angle shall be exhibited in the office room and must be made
available to the
inspecting officers of this Committe.
6.
Housckeeping shall be maintained clean.
7. All the conditions shall be enforced under the
provisions of the Environment (Protection) Act, 1986,
along with its amendments, from time to time.
Q.Dek
DESPATCHED
e coir
6
By Registered Post with
OLRUT
Acknowledgement Due
(This document contains 06 (Six) P P C C
Pages)
WATER CONSENT ORDER (RENEWAL)
Ref. No. (R19PUD713901/(2022)/768
Date:
1 4 JUN 2022
Sub Puducherry Pollution Control Committee M/s. Devi Innoventures LLP - Water Consent Order
Kenewal) under Section 25/ 26 of The Water (Prevention and Control of Pollution) Act, 1974, as amended
- Issued.
Water Consent to Operate is hereby renewed under Section 25/ 26 of the Water (Prevention
and Control of Pollution) Act, 1974, as amended (hereinafter referred to as The Act) and the Rules and
Orders made there under for discharge or continuation of discharge of sewage or trade o u
B. Umamahesh, The Factory Manager, M/s. Devi Innoventures LLP, 5th Main Road, PIPDIC Inaustriai
NCETEC
OLOGY4&
ECHNOLOON
Member Secretary
MEMBER SECRETAR?
PUDUCHERRY POLLUTION
CONTROL COMMITTEE
PUDUCHERRY..
To, PUDDUCHERR
B. Umamahesh, The Factory Manager, M/s. Devi Innoventures LLP, (Formerly M/s. Mohan
Breweries & Distilleries Ltd.), 5th Main Road, PIPDIC Industrial Estate, Mettupalayam,
Oulgaret Municipality, Puducherry 605 010.
-
Copy to
1.The Functional Manager, District Industries Centre, Thattanchavady, Puducherry 605 009
2.The Commissioner, Oulgaret Municipality, Jawahar Nagar, Boomiyanpet, Puducherry - 605 009.
3. The Junior Scientific Assistant (PWM), Puducherry Pollution Control Committee, Puducherry - 605 005.
4. The Assistant Envirnmental Engineer (HW Section), Puduchery Pollution Control Committee,
Puducherry - 605 005.
w
5. Standing Guard File.
1
SPECIALCONDITIONS
is
this clearance give
. Notwithstanding anything contained in anv other Act or Rules or Notifications
from pollution angle only.
2. Details of Products and By-products manufactured:
Unit
S.No. Description Quantity
Main Products
manufactured:
TPA
Soda Lime Glass 87600
Bottles
b. By-Product
1 No By-product
3. Details of Water Consumption:
Total 85.5
4. The applicant shall have the following outlets with maximum discharge quantities and disposal point as
specified in the table for discharge of sewage / trade effluent. Any change in the outlets has to be brought to
the notice of the Board and fresh consent has to be obtained if necessary.
Outlet NNo. Description of Outlet Maximum daily Point of disposal
dischargein KLD
1 Sewage 30.6 Shall be treated in
existing Combineed
ETP and the treated
water after conforming
to the standards, shall
be used for gardening.
2
S.No
Name Concentration Standard| Mass standard (if
applicable)_
1
pH 6.5- 9.0
2
Suspended Solids 50 mg/l
(mg/)
3 BOD, 3 days, 27 30 mg/l
deg.C
4 Oil &Grease 10 mg/l
5 Feacal Coliform 1000 MPN/100 ml
(MPN/100 ml)
Surfactants 1.0 mg/l
3
Furnace :
( F o r Raw Material Handling and Feed to pnd Port Continuous Regenerative
(C) For End Port Continuous Regenerative Furnace : 'The Furnace operation
and maintenance shall
Fire Hydrant systems,
automatcd and the same shall be with nccessary safety installations, such as,
mcrgeney Response Systems etc.
uumost
unit, Witn
h e unit shall provide proper PPEs to the emplovees and ensure operation of the
safcty
norm, such as O
The Storage of Furnace Oil, Diesel and LPG shall be as per the prescribed safety
1S6. PES0 - Explosives Act, etc., as applicable.
h) There shall be no any spillage of any oil on the land in and around the premises.
whole
be applicable for the
T h e revised standards mentioned under the Special Conditions, shall
the Rules/ Laws /Notifications,
production capacity of the unit and shall be in force, in accordance with
issued under the Environment (Protection) Act, 1986 and its amendments till date.
after
)The Treated Water KLD from the existing Combined Effluent Treatment Plant,
of 25.5 of this Consent
conforming to the Standards specified in the Clause 5 of Section "Special Conditions",
Order, shall be used for gardening
(k)Implementation Schedule for Strict Compliance:
(i) The unit shall NABL Accredited Laboratory, for collection and analysis of samples, for
engage an
Parameters of the Combined Effluent Treatment Plant, as imposed vide this Consent Order and the reports
This is for Strict
of the same, shall be submitted to this Committee, on or before 20th of every month.
Compliance.
(ii) The unit shall obtain clearance under the provisions of the Hazardous and Other Wastes (Management
and Transboundary Movement) Rules, as amended till date, for storage and disposal of Sludge generated
from the Combined Effluent Treatment Plant and the copy of the same shall be submitted to this
on or before 31.08.2022. The above said waste shall be segregated,
stored and disposed off as
Committee,
per the provisions of the Hazardous and Other Wastes (Management and Transboundary Movement)
Rules. as amended till date, as applicable. Disposal of any of the above said wastes in and around the unit,
is strictly prohibited.
(ii) The unit shall scrap the existing Older Technology Combined Effluent Treatment Plant and shall
construct new Combined Effluent Treatment Plant of "State of the Art Technology", as imposed vide
Direction dated 29.11.2021 and shall be put to use, on or before 31.08.2022
iv) In case of non-compliance of even one of the above said 3 Nos. of Implementation Schedules,
irnposed above, this Consent order becomes void, the fees paid so far (Rs. 2,50,000/- (Rupees Two Lakhs
and Fifty Thousand Only)) gets forfeited, the unit shall be further prohibited to apply for the renewal of
this Consent Order, which means the unit shall immediately stop the operations and close the unit, and the
unit shall attract the penalties / environmental compensation as deemed fit, as per the prevailing pro isions
of the Rules / Notifications / Laws. This is for strict compliance, instantly, as the unit has already failed to
comply with the implementation schedules issued earlier and has sought additional time schedule.
(0) For Better Environmental Management:
(i) Energy conservation measures like installation of energy efficient lighting systems, like LED's for
lighting the areas inside and outside the building should be integral part of the design. Used CFL's/TFL's/
L.ED's should be properly collected and disposed off/ sent to for recycling as per the prevailing
guidelines/ rules of the regulatory authority to avoid toxic contamination.
4
(ii) Use of Solar panels may be adopted to the maximum extent possible, especially for streetignts wil
the campus.
MEMBER SECRETAR?
PUDUCHERRY POLLUTION
CONTROL COMMITTEEE
UOUCHCHERR PUDUCHERRY.
Reca
ylol
5
GENERAL CONDITIONS
otwithstanding anything contained in this No-Obicction Certificate from Pollution Angle, the
Puduchery Pollution Control Committee hercbyrescrvesits right and power under Section O
Water (Prevention and Control of Pollution) Act. 1974 and Section 21 (4) of the Air (reveno
and Control of Pollution) Act, 1981 to Review/Revoke any or all the conditions imposed herein ane
to cancel, refuse, modify or stipulate additional conditions for the purpose of the Act by the Committe, i"
OF
SCIENC TECH
A
HOLD Member Secretary
MEMBER SECRETAR
PUDUCHERRY POLLUTION
CONTROLcOMMITTEE
UCHEHERIRY PUDUCHERRY.
.t
DESPATCHED