ITP For Grounding and Bonding - CODE - A
ITP For Grounding and Bonding - CODE - A
ITP For Grounding and Bonding - CODE - A
INSPECTION RESPONSIBILITY
ASSIGNMENTS
ACTIVITY PROJECT PHASE & SPECIFICATION/
TASK / ACTIVITY FREQUENCY ACCEPTANCE CRITERIA QUALITY RECORD REMARKS
NO. ACTIVITY CODE DRAWING CONTRACTOR
SUB CONT. AL SAYEGH THIRD PARTY ILF/GRP
1.1 Work Permit N/A N/A N/A N/A N/A N/A H N/A R
INSPECTION RESPONSIBILITY
ASSIGNMENTS
ACTIVITY PROJECT PHASE & SPECIFICATION/
TASK / ACTIVITY FREQUENCY ACCEPTANCE CRITERIA QUALITY RECORD REMARKS
NO. ACTIVITY CODE DRAWING CONTRACTOR
SUB CONT. THIRD PARTY ILF/GRP
AL SAYEGH
4.0 TESTING
GENERAL NOTES
1 The first three Inspection or testing activity listed require 100 % participation by Consultant/Client. After this period, Consultant/Client may adjust the levels of Consultant/Client participation based upon the Contractor’s performance.
2 Surveillance: Client representative to monitor work in progress without notice from Construction Organization
3 Witness: Client representative shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC client representative is not present.
4 Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC client representative in attendance.
LEGEND
H 100% Hold Point for QC Inspection or Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection/Test
N/A Not Applicable A Approval
Construction of TSE Network for Green Riyadh Program – Group
THREE
INSPECTION CHECKLIST
Activity: Checklist No.: Date Approved: Discipline:
Visual inspection and material verification of Grounding and Bonding of
QCF-001 ELECTRICAL
Electrical System
Project Title/Number: MIR No.: ITP No.:
GROUP THREE & 12021-G3 GRP-08-TS000-SGCRS-ELE-ITP-00002
Area: Location: Equipment No.:
INSPECTION CHECKLIST
Activity: Checklist No.: Date Approved: Discipline:
Visual inspection and material verification of Grounding and Bonding of
QCF-001 ELECTRICAL
Electrical System
Project Title/Number: MIR No.: ITP No.:
GROUP THREE & 12021-G3 GRP-08-TS000-SGCRS-ELE-ITP-00002
Area: Location: Equipment No.:
D
Grounding and bonding fittings:
REMARKS:
Name
Signature
Date
Construction of TSE Network for Green Riyadh Program – Group
THREE
INSPECTION CHECKLIST
Activity: Checklist No.: Date Approved: Discipline:
Visual inspection of Installation and verification of Grounding & Bonding
QCF-002 ELECTRICAL
of Electrical System
Project Title/Number: WIR No.: ITP No.:
GROUP THREE & 12021-G3 GRP-08-TS000-SGCRS-ELE-WIR-00021 GRP-08-TS000-SGCRS-ELE-ITP-00002
Area: Location: ST - 4+000 Equipment No.:
A2
Material to be installed is as per approved material
submittals.
A5
Location of installed earth rods is coordinated with other
services.
A6
Earth conductor are connected to earth rods using
approved Procedure.
A7
Exothermic weld joints complied with Manufacturer's
instruction.
A8
Installed earth pits are as per approved drawing details in
conjunction with earth conductor & earth rod.
A9
Installed 6/12 ways Tinned Cu copper equipotential bus
bar with plastic cover & fixed wall bushing.
REMARKS:
Name
Signature
Date
Construction of TSE Network for Green Riyadh Program – Group
THREE
INSPECTION CHECKLIST
Activity: Checklist No.: Date Approved: Discipline:
Layout Drawing No: TSE-00-3-PM-1600-FKEC-D-EL-DRW-00002 Activity Number EC / PMCC / MCC NO. N/A
TSE-00-3-PM-1600-FKEC-D-EL-GEA-00001
Acceptable Resistance Value 2 Ohm maximum. 4.1 Calibiration Date:
Earth Pit Measurement Value 1 Avverage resistance:
Earth Pit Measurement Value 2 Earth Pit Refrence:
Earth Pit Measurement Value 3 Eqipment Name:
A1
All works have been executed in a workmanlike manner
and has conform to the highest applicable standards.
REMARKS:
Name
Signature
Date