Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Oia Downtown - Architecture Facade 2023-09-15

Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

+9,160

+8,760

2 5 4 1 2
Stone Wood. Glass- Plaster Stone

+4,600 +4,600

+3,600
+4,250
+3,600

+1,141

+0,273
+0,000
-0,628 -0,628
-0,300
-1,680
-1,890
-2,485 -2,470 -2,470

Facade Lobby 01 A

REV: DESCRIPTION: BY: DATE:

STATUS:
+8,760

+7,650

3 ZROBIM
Metal 4 3 1 architects
Glass- Metal Plaster
+4,600 +4,600 CLIENT:

+4,710

ARCHITECT:
+3,611 +3,600
ZROBIM ARCHITECTS, STRUCTURE AND
INTERIOR DESIGN

PEOJECT:

OIA DOWNTOWN
+0,000
TITLE:

Facade Lobby 01
SCALE AT A3: DATE: DRAWN: CHECKED:

1:100 2023-07-31
Facade Lobby 03 PROJECT NO: DRAWING NO: REVISION:
1 4 2 3
Plaster Glass- Stone Metal
+4,600
C

+3,600 A

REV: DESCRIPTION: BY: DATE:

STATUS:

+0,000

ZROBIM
architects
Facade Lobby 02
CLIENT:

ARCHITECT:

ZROBIM ARCHITECTS, STRUCTURE AND


INTERIOR DESIGN

PEOJECT:

OIA DOWNTOWN

TITLE:

Facade Lobby 02
SCALE AT A3: DATE: DRAWN: CHECKED:

1:100 2023-07-31
PROJECT NO: DRAWING NO: REVISION:
1
2 Plaster
Stone +9,160

+5,200

+4,050
+3,600
+4,250 +3,250
+3,000

+3,275 +3,430
+2,630

+0,250

9130 14480

A/5 D/5 E/5

Facade Restoraunt 01 C

4 1 B
2
Glass- +9,160 Plaster A
Stone SC.E_3 SC.E_3 SC.E_3 SC.E_3 SC.E_3 SC.E_3
REV: DESCRIPTION: BY: DATE:

STATUS:

+7,400
+8,300
1
4 Plaster
3240

Glass-
+5,060

+4,050 ZROBIM
1420 +3,895 architects
+3,200 +3,200
+3,000
CLIENT:
+3,430 +3,275

ARCHITECT:

+0,000 +0,000
ZROBIM ARCHITECTS, STRUCTURE AND
INTERIOR DESIGN

11960 PEOJECT:

OIA DOWNTOWN
1/5 2/5 TITLE:

Facade Restoraunt
SCALE AT A3: DATE: DRAWN: CHECKED:

Facade Restoraunt 02 1:100 2023-07-31


PROJECT NO: DRAWING NO: REVISION:
+7,500 +7,500

1
Plaster 1 +6,880 1 4
Plaster Plaster Glass-
+6,280
+5,740

+3,250

+2,950
+2,630

+0,925
+0,260
+0,000

Facade Restoraunt 03 C

REV: DESCRIPTION: BY: DATE:

STATUS:
+8,500 1 4
Plaster Glass-
+7,400 +7,500
+8,300

+5,740
+6,880
+5,060
+6,280
ZROBIM
+4,050 +3,895 architects
+3,250 6490
+4,250
CLIENT:

+3,164 +3,430 +3,275


+2,950
+2,630

+0,000 ARCHITECT:

ZROBIM ARCHITECTS, STRUCTURE AND


35180 INTERIOR DESIGN

1/5 4/5 5/5 PEOJECT:

OIA DOWNTOWN

TITLE:

Facade Restoraunt 04 Facade Restoraunt


SCALE AT A3: DATE: DRAWN: CHECKED:

1:100 2023-07-31
PROJECT NO: DRAWING NO: REVISION:
+7,500

1
Plaster
+6,880
+6,280

Facade Kitchen. Vip, BBQ

REV: DESCRIPTION: BY: DATE:

STATUS:

1
4 Plaster 2 3
+9,165
Glass- Stone Metal
SC.E_4
+8,055
+7,500
ZROBIM
architects

1960
+6,880 +5,080 +5,200
+6,280 +4,746
+3,710 1050 CLIENT:

SC.E_5 SC.E_5 +3,200


+4,250

ARCHITECT:
3600

+0,000 ZROBIM ARCHITECTS, STRUCTURE AND


INTERIOR DESIGN

SC.E_5 SC.E_5 1140


6490 35180 PEOJECT:

OIA DOWNTOWN
5/5 4/5 1/5
TITLE:

Facade Restoraunt

Facade Restoraunt 05 SCALE AT A3:

1:100
DATE:

2023-07-31
DRAWN: CHECKED:

PROJECT NO: DRAWING NO: REVISION:


1
2 4 1 2
2 1 Plaster
Stone Glass- Plaster Stone
Stone Plaster
+8,760
SC.E_1 SC.E_1 SC.E_1 SC.E_1 SC.E_1 SC.E_1 SC.E_1 SC.E_1

+7,000 +6,998
+7,650 +7,650

H(Top)=4460 мм

2900
H(Bottom)=-50мм

+4,710 +4,710 +4,600


+3,895 +4,050
1420

+3,050
+3,430 +3,600
+3,275

3600
+0,273
+0,000 +0,000

1420
2370 24990
C
SC.E_2 SC.E_2 SC.E_2 SC.E_2 SC.E_2 SC.E_2

4/4 1/3 4/2 B

+11,550
Facade Lounge, Coworking 01
A

REV: DESCRIPTION: BY: DATE:

STATUS:

3 2 1 1 2 1
4
Metal Stone Plaster Plaster Stone Plaster
Glass-
+8,760
SC.E_1 SC.E_1 SC.E_1 SC.E_1

+7,650 +7,650 ZROBIM


architects

+5,200
+4,710 +4,710 CLIENT:

+3,600

+3,600 ARCHITECT:

ZROBIM ARCHITECTS, STRUCTURE AND


INTERIOR DESIGN

+0,000 PEOJECT:

OIA DOWNTOWN
27010 7750 TITLE:

Facade Lounge, Coworking

1/1 4/4 2/4 SCALE AT A3: DATE: DRAWN: CHECKED:

1:100 2023-07-31
PROJECT NO: DRAWING NO: REVISION:

Facade Lounge, Coworking 02


2 1 1
+8,760 Stone Plaster Plaster

+4,710

+3,895 +4,050

+3,600 +3,430
+3,275

-0,007

8470

B/1 B/3 C

2 1 3

Facade Lounge, Coworking 03 +11,568 Stone Plaster Metal


B

REV: DESCRIPTION: BY: DATE:

STATUS:

+8,760

1
Plaster ZROBIM
architects

+4,800
CLIENT:

+4,050

+3,430 +3,610 ARCHITECT:


+3,275
+2,950 ZROBIM ARCHITECTS, STRUCTURE AND
INTERIOR DESIGN

+0,000 PEOJECT:

OIA DOWNTOWN

4940 7280 1190 TITLE:

Facade Lounge, Coworking


C/4 B/3 B/2 B/1 SCALE AT A3: DATE: DRAWN: CHECKED:

Facade Lounge, Coworking 04 1:100 2023-07-31


PROJECT NO: DRAWING NO: REVISION:
1 1 1 4
Plaster Plaster Plaster Glass- +11,568
Facade Gym, Spa 03

+6,500
4
Glass-
+5,200
+4,800
+4,000
+3,600
+2,950 +4,000

+2,950

+0,000

4940 9490
1 4
Plaster Glass- +11,550
C/4 B/3 A/4
C

+9,950 B

REV: DESCRIPTION: BY: DATE:

STATUS:

+7,450

1 ZROBIM
Plaster architects
+4,800
CLIENT:

ARCHITECT:

+2,950 ZROBIM ARCHITECTS, STRUCTURE AND


INTERIOR DESIGN

PEOJECT:

+0,000 OIA DOWNTOWN

Facade Facade Gym, Spa 02 TITLE:

7750 Facade Gym, Spa


SCALE AT A3: DATE: DRAWN: CHECKED:

1:100 2023-07-31
PROJECT NO: DRAWING NO: REVISION:

2/4 4/4
2 1
Stone Plaster +11,568

+6,100
1
+5,200 Plaster
+4,800 +4,800

Facade Gym, Spa 01


B

REV: DESCRIPTION: BY: DATE:

STATUS:

Facade material ZROBIM


architects
Image Name
CLIENT:

Plaster
1
Color Off white, RAL 070 90 05
ARCHITECT:

ZROBIM ARCHITECTS, STRUCTURE AND


2 Stone INTERIOR DESIGN

PEOJECT:

3 Brushed copper + water OIA DOWNTOWN

TITLE:

Facade Gym, Spa


4 Glass
SCALE AT A3: DATE: DRAWN: CHECKED:

1:100 2023-07-31
PROJECT NO: DRAWING NO: REVISION:
5 Wood RAL Design 050 30 20
20 60 20 60

110
20 60

20
20 60

110
20
20 60

3090

2730
3600

3600
110
3240

20
2900

1960
REV: DESCRIPTION: BY: DATE:

STATUS:

20

20
ZROBIM
architects
1420 1420 1420 1070 1140
CLIENT:

70 20

90
70

70

70

70
ARCHITECT:
1420 1420 1420 1070 1140
ZROBIM ARCHITECTS, STRUCTURE AND
INTERIOR DESIGN

PEOJECT:

OIA DOWNTOWN
SC.E_1 SC.E_2 SC.E_3 SC.E_4 SC.E_5 TITLE:
Decorative sliding screen on the
12 pieces 6 pieces 6 pieces 1 pieces 4 pieces SCALE AT A3:
outside
DATE: DRAWN: CHECKED:

1:100 2023-07-31
PROJECT NO: DRAWING NO: REVISION:

You might also like