MATERIAL TAKE OFF (MTO)

NO PART SIZE DESCRIPTION QTY


(mm)

1 PIPE 15 API5L-B SMLS SCH 80 860MM

2 TEE 15 A234-WPB SMLS SCH 80 BE 1 PC


JT 1 3 CAP 15 A234-WPB SMLS SCH 80 1 PC
FW 4 GATE VALVE 15 A105 CLASS #800 SW 1 PC

5 STRAINER 15 TLV STRAINER MODEL F46Y-BD2 1 PC


JT 2
6 STEAM TRAP 15 J3SX-21 1 PC

7 ELBOW 15 90 LR SCH 80 BE 1 PC

JT 3

JT 4

JT 8 JT 5

JT 9 JT 6

JT 10 JT 7

JT 12

JT 13

JT 11 FW

12.07.2023

NDT PIPING SPECIFICATION REFERENCE CLIENT : CONTRACTOR :

X-RAY 10% SERVICE LP STEAM P&ID NO : NA


DPT 100% LINE CLASS 1126Z ISO DRWG NO: NA
HT YES MATERIAL TYPE CS

PROJECT:
PAINTING INSULATION LINE DATA
STEAM TRAP REPLACEMENT 2023 (OSTA)
SHOP FIELD INSULATION CLASS NA DESG TEMP NA
LINE NO: AREA: UNIT:
33-T2-ST-6, 33-T2-ST-7,33-T2-ST-8, 33-T2-ST-9, 33-T2-ST- 14
PAINTING SYSTEM NO N4 M4 INSULATION THICKNESS NA DESG PRESSURE NA 0 18/5/23 IDLAN SYED KHALIS ISSUE FOR CONSTRUCTION 33-T2-ST-15, 33-T2-ST-16, 33-T2-ST-17, 33-T2-ST-18
5B 33
PAINTING SPEC SILICON ALUMINIUM HT PRESSURE NA REV. DATE DRAWN CHCKD APPR DESCRIPTION SCALE: SCALE: DRAWING NO: REV:
DFT 50 MICRON 50 MICRON NTS A3 0