1 Column/Footing Details: Elevation

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

5" THK CONC.

SLAB
ON 1.0mm THK STEEL DECK
W/ 10MM REBARS SPACED
@ 300MM BOTHWAYS

STEEL BEAM (B1) STEEL BEAM (B1)

I-BEAM COLUMN
2nd ffl
BASE PLATE

FIN. FLR

CONCRETE PEDESTAL

2 BEAM-COLUMN CONNECTION DETAILS


ELEVATION

16mm THK
250MMX100M STIFFINER PLATE

500x600x16mm THK
BASE PLATE
6 pcs 16 mm x 400x100mm Anchor Bolt 10 - 16mm REBARS
ALONG "L" DIRECTION
t1-18.5mm

t1-19.0mm t1-10.5mm
FFL
t2-11.5mm
12-16mmØ t2-11.5mm t2-6.75mm
VERT. REBARS
W/ 10mmØ TIES
@ 100 mm spacing
FTB
5-16mmØ
LONGI. REBARS
W/ 10mmØ TIES
10 - 16mm REBARS
bothways
10 - 16mm REBARS
ALONG "S" DIRECTION
P-1 P-2 C-1 C-2 C-3
F-1 12-16mmØ 24-16mmØ W21X73 W16X77 W14X30
VERT. REBARS VERT. REBARS
W/ 10mmØ TIES W/ 10mmØ TIES

1 COLUMN/FOOTING DETAILS CONCRETE PEDESTAL Steel Column

PROJECT TITLE: REVISIONS: DATE: APPROVED: SHEET CONTENT: SHEET NO.:

REG. NO:
PROPOSED CONSTRUCTION OF WOMEN IN
ENGR. RENATO TAPNIO PTR NO:
CRISIS AND DEVELOPMENT CENTER
ENGR. NANETTE VILLAFUERTE HON. MA. ELENITA D. NIETO - AS SHOWN - S
ISSUED ON:

ISSUED AT:
45

You might also like