CAD Assessment MCQ
CAD Assessment MCQ
CAD Assessment MCQ
ADHIPARASAKTHI
Approved by AICTE,ENGINEERING COLLEGE
Affiliated to Anna University, Chennai
MELMARUVATHUR- 603 319, CHENGALPATTU (D.T), TAMILNADU, INDIA.
Approved by AICTE, New Delhi and Affiliated to Anna University, Chennai
(An ISO 9001:2015 Certified institution)
S
Register Number :
Semester / year :
Date :
Marks scored :
2. A Polyline can be broken into individual lines and arcs using which of the following command?
(A) BREAK
(B) TRIM
(C) EXPLODE
(D) OVERKILL
7. Find the false statement in regards with "If an array is made associative".
(A) You can't use Boolean operations on the array elements
(B) To make the array non associative you need to use explode command on it
(C) The array can be edited again by selecting it
(D) The array can't be modified in any way once it is made associative
8. An open area can be filled with which of the following gradient:
(A) Gap
(B) Tolerance
(C) Transparency
(D) Open
12. A line shows its dimension as 14.52. What is the precision of this line?
(A) [0.0]
(B) [0.00]
(C) [0.000]
(D) Display of length has nothing to do with precision
13. Model Tab and Layout Tab can be majorly distinguished as,
(A) The Model tab is used for drawing in 3D and a Layout is used for drawing in 2D
(B) The Model tab is where you create the drawing, and a Layout tab represents the sheet that you will
plot or print on
(C) The colour of the background
(D) The Model tab displays the drawing you are copying from and the Layout tab is where you lay out
the new drawing
(B) MLN
(C) MLEADER
(D) MULTI
15. To bring a particular area of the workspace in focus, what command should be used?
(A) Zoom Extents
(B) Zoom Window
(C) Zoom Dynamic
(D) Zoom All
16. What are the various options from left to right and the opposite direction?
(A) Choose a different category of objects
(B) Select objects according to their colour
(C) Select objects according to their position
(D) No difference
18. A Boolean operation that is used to select interfering region between solids,
(A) Union
(B) Intersect
(C) Subtract
(D) None of the above
20. If you change the scale list a project that I have started from 1:50 1:10 then,
(A) You will have to start over
(B) You should not raise the objects already exist (scale) by 5
(C) You will not need to change anything in hitherto methodology
(D) Should be converted into new items that will add based on the new scale