527 Sac
527 Sac
527 Sac
Management Services
Review Guidelines (MSRG) and
Executive Officer Transition Guidance
I. INTRODUCTION 4
A. General 9
B. Travel 10
C. Transportation 10
A. General 11
B. ICASS General Services 12
1. Residential Housing 12
2. ICASS Leases 12
3. ICASS Motor Pool Operations 13
4. ICASS Personal Property Management 13
2
I. FSN/CCN/TCN PSC 20
A. General 22
A. General 23
B. Information Security 24
1. IT Personnel Security Requirements -- Protecting PII 24
2. IT Technical Security 24
3. IT Administrative Security 25
4. IT Physical Security 26
5. Emergency Preparedness 26
C. Cyber Security 26
3
I. INTRODUCTION
In some cases the requested responses —Yes, No, N/A (Not Applicable) — will
not provide the needed or appropriate answer to the question. In those cases, it is
recommended that comments be written next to the question. Written summary
explanations are encouraged to provide additional context for strengths and
weaknesses of particular responsibilities and to obtain a comprehensive overview
of the working environment.
4
A. Personnel Management (General)
Yes/No/NA
d. How often does the receiving post get attention through visits, phone,
email, etc.?
3. If funding and staff levels are not adequate to meet the Mission’s human
resources needs, describe what additional resources are needed.
4. Are staffing levels in all workforce categories adequate for the goals and
objectives of the Mission?
5. Are there any established positions that have remained unfilled two months
or longer during the past year? What was the impact? How does the
Mission cope with the vacancies?
6. Are Mission employees assigned work that could be acquired from private
sector sources or performed more cost-effectively in Washington or at a
regional center?
7. Throughout the Mission, are expatriate staff performing work that could
more economically and efficiently be performed by local staff without
violating security standards?
5
10. Is the Mission staffing data in the Agency’s electronic overseas personnel
system accurate and complete? Does the Mission regularly input data into
the system and provide the Semi-Annual Workforce Planning Report to
HCTM?
11. Does the Mission have personnel with access to the Department of State
Executive Agency Personnel System (EAPS), and do such individuals
monitor the data in EAPS to ensure that the information is up-to date and
mirrors data in the USAID Post Personnel database?
12. Does the Mission have a designated USDH who certifies that the EAPS
data has been reviewed and that necessary notice to correct data has been
submitted via EAPS to DoS HR officials?
13. Does post follow the regulations and restrictions on payment of premium
compensation to Foreign Service Officers? (3 FAM 3130)
14. Is Personally Identifiable Information (PII) protected and does the Mission
handle and dispose of personnel records according to Information Security
standards and Records Disposition Schedules?
15. Does the post and USAID Mission have equitable and effective incentive
awards programs for all categories of employees?
16. Does the USAID Mission participate in the Post Incentive Awards program?
Is the Program administered properly and meet USAID requirements?
18. Are all personnel records for all categories of personnel set up, maintained
and disposed of according to regulations? (ADS 502, ADS 309 and 3 FAM
2350) In addition to contract and performance information, do these files
include:
a. Medical forms?
b. Beneficiary info?
6
19. Has the Mission established and maintained effective procedures for
processing and safeguarding post mail and pouch materials? (ADS 513.3)
20. Describe expatriate and local staff morale at the Mission. If morale is less
than optimal, what is the likely cause(s)? Has Mission management taken
steps to address and improve the morale of the workforce?
21. Is the Mission aware of USAID Staff Care resources and able to access
them? Wellness programs are considered a best practice, has the Mission
developed any for staff?
22. Does the Mission utilize the Agency On-the-Spot Awards program to
recognize staff performance? Is the program managed effectively and
consistently across the Mission?
23. Mentoring programs have been described as a best practice for staff
development, retention and job satisfaction. Has the Mission established a
mentoring program for any or all categories of staff? What have been the
challenges with the program?
24. Does the Mission support a large number of TDY personnel? If so, have
programs and procedures been developed to reduce the administrative
burden on Mission staff and address issues specific to TDYers such as
ensuring fund sites are provided prior to the trip to cover the cost of
services, eCCs approved prior to arrival and a “welcome” or logistics guide
developed to enable them to have a safe, effective and pleasant TDY
experience at Post?
4. Are employees completing the promotion input form when they are eligible
for promotions?
7
6. Does the Mission complete and transmit arrival/departure notices and other
personnel management documents (e.g., SF-1190) to Controllers and
offices in USAID/W in a timely manner?
7. Are current OF-126 (FS Residence and Dependency Report) and AID-450-
1 (Emergency Locator Information) forms on file at Post and in M/HR for
each USDH employee?
11. Does the post report job opportunities available at post for family
members?
The following applies to USPSCs, off-shore and local hire, and off-shore hire
Third Country National (TCN) PSCs.
1. Are PSCs managed at post within the scope and limitations of individual
contracts and in accordance with Agency regulations and policies? (AIDAR
Appendices D and J and ADS 309)
5. Do all off-shore hire USPSC and TCNPSC files include proof of current
Medical Evacuation insurance?
6. Do all PSCs annually receive and submit financial disclosure reports (OGE-
450 Confidential Financial Disclosure Reports), if appropriate, for their
position? (AIDAR Appendices D and J; ADS 309; 5 CFR part 2634, Ethics
in Government Act 1978 as amended, CIB 93-17)
8
8. Are USPSC employees managed at post within the scope and limitations of
individual contracts and in accordance with Agency regulations and
policies?
3. a. Does the local compensation plan accurately reflect the local job market
in different skill categories so that the Mission is able to recruit and retain
qualified local employees in all skill categories and at all grade levels?
4. Does the Mission have a system in place, in keeping with local law, which
allows disciplinary action or discharge of employees for cause or for not
meeting minimum performance standards? (3 FAM 7710)
c. How they relate to others within the Mission and the Embassy
workplace?
6. Have all employees who travel to the U.S. on official business undergone
medical examinations, obtained clearances to travel, and enrolled in an
FSN Health and Accident Coverage (HAC)? (ADS 496)
9
7. Have all traveling employees been instructed about regulations and
procedures of official travel and insurance requirements before
commencing travel? (ADS 496)
10. Does the Mission have an interagency RIF plan and out-placement
procedure in place?
11. Does Post have a uniform recruitment policy for hiring local employees?
13. Are all locally recruited TCN employees considered FSNs and
compensated (salary and benefits) according to the local compensation
plan?
14. What is the date of the last revision to the post's LE staff handbook? Does
the handbook explain conditions of employment, ethical standards, EEO
principles, and the disciplinary process?
15. Are USAID HR staff engaged and knowledgeable about local labor law and
the contents of the LE handbook as this applies to employees?
16. Are FSN, CCN and TCN employees managed at the post in accordance
with Agency policies and standards?
1. Does the Mission have a budget and Training Plan or Mission Order for
staff training, detailing procedures and processes for managing training for
all categories of expatriate and local staff?
10
b. Does orientation include, when appropriate, a health unit orientation?
A. General
Does the Mission adhere to FAM, ADS, AIDAR Appendix D & J and DSSR
regulations and guidance and Post policies that govern the procedures and
processes for authorizing and acquiring official travel, transportation, and
related allowances?
a. ADS 522, Performance of Temporary Duty Travel in the U.S. and Abroad
e. 14 FAM 500
f. 7 FAM 1300
B. Travel
11
5. Has the Authorizing Officer documented the reason for any exceptions to
the travel regulations? (ADS 522)
9. Does the Mission, in coordination with the Embassy, ensure currency and
adequacy of country per diem rates based on periodic review and
Department of State action?
10. Does the Mission obtain all air travel tickets from the designated Post
Travel Management Center (TMC), as required?
11. Are the USAID staff responsible for managing the travel function
knowledgeable and effective in supporting official travel?
12. Is the post’s designated Travel Management Center effective and efficient
in supporting USAID official travel? Are TMC staff customer service-
oriented?
13. Are all Travel Authorizations (TAs), for both TDY and entitlement travel,
issued from the Agency’s current electronic travel management system?
If not, what are the exceptions and why? Are Open Authorizations utilized
to streamline operations where appropriate?
14. Has the Mission authorized Premium Class Air Travel for any staff? If so,
were the TAs documented appropriately and filed with all required
certifications to justify its use per ADS 522?
C. Transportation
1. Are the transportation services acquired by the USAID Mission from the
ICASS Service Provider effective, efficient and meet the needs of the
Agency?
12
3. Are the shipment of personal effects (HHE and UAB) for USAID
personnel well managed? Have USAID employees reported loss or
damage or unusual delays associated with personal effects shipments?
A. General
5. Does the ICASS Council routinely schedule and conduct key meetings with
participating agencies at Post?
● April #7 - Final Budget ratified. Strategic review and look ahead to next
fiscal year. ICASS Council
13
● June #8 - Workload Counts and Time Allocation reviewed and
approved. Budget Committee
6. Are the ICASS services the Mission receives perceived as better or worse
than the prior year? What is the trend of customer
satisfaction/dissatisfaction over the past four years?
8. Does the ICASS Council at Post review the percentage of time the
Embassy administrative section charges to each ICASS cost center?
10. Does the Post Budget Committee/Working Group meet regularly to discuss
ICASS issues? Has a Post Budget Committee or Working Group been
formed?
11. Does the ICASS Service Provider regularly seek cost savings and
economies in administrative operations?
13. Is an annual assessment of the ICASS Service Provider being done at Post
by the ICASS Council?
14. In the Mission’s opinion, is ICASS training needed at Post for ICASS
Council members, service providers, and/or customers?
2. Are ICASS funding and staffing levels adequate to meet the Post’s ICASS
operations and needs?
b. Does the IAH Board keep written records of its meetings and
decisions?
14
c. Does the Post have a handbook or Mission Order on its housing
policy? Is it updated biennially?
e. Does the Post make every effort to retain appropriate housing under
leases of five years or more?
h. Have all leases with rentals in excess of $50,000 per annum been
approved by M/OMD prior to signing?
15
j. Are security upgrades to U.S. Government-held and privately
leased residential leases being funded by the Department of State?
b. Does the Motor Pool support USAID site visits and engagement
with implementing partners in rural areas?
16
k. Are passengers billed for all other authorized use, where
appropriate?
Unless otherwise noted, all references in parenthesis refer to 14 FAM and ADS
provisions.
17
A. Real Property Management
1. Does the Mission own office and/or functional space property in excess of
its needs? (ADS 535) If so, has this property been considered for other
agencies' needs?
3. Where members of a tandem couple are employed by more than one U.S.
Government agency and occupy short-term leased space, does each
agency pay its share of rent, preparation for occupancy, and operation and
maintenance cost?
4. When more than one U.S. Government agency occupies short-term leased
space, does each agency pay its share of operation and maintenance cost
and rent?
5. Are Trust Funds used to fund rent or other costs for buildings occupied only
by USAID personnel?
7. Do telephone payments indicate that only official calls are being paid for by
the Government? Is there a Mission Order or a billing process established
for when it is necessary to recover costs for personal calls made with
official cell phones or office phones?
9. Has any real property been acquired by gifts? If so, was it reported to
M/OMD?
10. Has a colocation waiver or exemption notification been obtained for office
and functional space acquisition?
B. General
1. Does the Mission provide regional support to any other Posts in the area?
2. Does the Post receive regional support from any other Post?
C. Leases
18
1. Does the Mission lease properties that are not part of the general Post
Housing pool? Does the Mission have M/OMD approval for initial leases
that exceed 10 years?
2. Has the Mission obtained approval from M/OMD before signing leases for
functional space, regardless of rental cost?
5. If executed leases deviate from the established model, is a reason for the
deviation documented?
19
9. Are USAID employees, including the Mission Director, billed for home to
office transportation and for all other authorized use, where
appropriate?
10. Does the Mission Director driver keep a daily use record (Trip Ticket) on
Form OF 108 or its equivalent?
11. Are all USAID vehicles entered into the vehicle/fleet information
management system? Is the system updated on a regular basis to
accurately track vehicle usage and disposition?
13. Are any USAID vehicles operated and maintained by ICASS? Does the
Mission have an up-to-date MOU with ICASS outlining the
responsibilities and expectations associated with ICASS operating and
maintaining USAID owned vehicles?
Each Mission should have a Mission Order on occupational safety and health that
clarifies local procedures, practices, and policies regarding the protection of life
and property in collaboration with Post management. A sample generic Mission
Order on safety and health is available upon request from the M/MS/OMD.
1. Has the Mission Director appointed a USAID Unit Security Officer (USO) in
writing? (ADS 561 and 12 FAM 420)
4. Are new personnel at Post given a security orientation? (12 FAM 500 and
ADS 568)
20
8. When was the Emergency Action plan (EAP) last reviewed and updated?
(Security Standards 12 FAH 5)
9. Does the Mission request security checks for all local hire employees from
the Embassy RSO? (ADS 568, AIDAR Appendix J and ADS 309)
10. Partner Liaison Security Offices have been established at a number of high
threat Posts and at Posts with a challenging operating environment.
Missions operating under such conditions may want to consider contacting
SEC to discuss the feasibility of establishing an office.
1. Have all U.S. citizen employees been cleared through SEC? (ADS 566)
2. Are clearances up-to-date for all USPSC employees? (ADS 567) If not,
corrective action needs to be taken immediately.
5. Are Mission personnel files protected and under the supervisory direction of
a security-cleared U.S. citizen employee and designated and trained staff?
(ADS 502; 3 FAM 2350 & 7141; ADS 495.5.11; FSNPAH sec.14.5a; FAH
H-317; ADS 309.3.3)
1. a. Does the Mission's USO receive security-related training from the RSO?
(EO 12958)
21
7. a. Do all staff receive security training as appropriate for their position and
the threat level at Post?
2. Does the USAID Mission maintain any warehouse or storage areas for
stocks of IT equipment, Expendable Property or Non-Expendable property?
6. Does the Mission Director sign the inventory completed document? on his
residence prior to a copy being sent to M/OMD?
22
d. Was the solicitation posted in a public place per FAR 5 and 13
requirements?
f. Has the Contracting Officer signed and was it within warrant limits?
K. USPSC Contracting
23
1. Do USPSC contracts in the USAID Mission adhere to Agency regulations and
policy? (AIDAR Appendix D and ADS 309)
2. Has the CO cited the corrected PSC statutory authority? See FAR 37.104.
Does the Contracting Officer have the appropriate warrant authority?
4. Are funds available, have forward funding rules been followed, and was
obligation appropriate?
6. Has the position level been set IAW AIDAR Appendix D and ADS 309?
8. Is the selection memo with the results of the interviews, including names and
rankings, in the file?
9. Does the file contain a signed Offeror Information Form from the contractor?
10. For Resident Hire USPSCs recruited from within the cooperating country:
b. If the class J&A was not used, and other limited competition was used,
does the file contain a Justification for Other than Full and Open
Competition? See ADS 309mad.
11. For USPSCs recruited from outside the cooperating country, is there
evidence that the position was properly advertised on FedBizOpps? See
ADS 309mad.
13. As applicable per ASIST guidance, does the file contain: (ASIST Appendix
A, ASIST Filing Standard).
a. Security determination?
24
b. Medical clearances for overseas PSCs?
a. The number of applicants and how they were screened to the interview
level?
b. How the contractor was assessed against the evaluation factors in the
solicitation, and selected based on technical qualifications?
16. Is the Checklist for Personal Services Contracts in the file and is it accurate?
See ASIST guidance.
a. Cover Page, AID 309-1, with the ethics code at the top of the page
appropriately marked?
18. Is the individual's rate of compensation within the position’s market value?
19. Is the individual's compensation rate "capped," if it is at the top step in the
range?
20. Are all USPSC and off-shore hire TCNPSC contracts entered into GLAAS or
the current Agency acquisition and assistance system?
L. CCN/TCN PSC
25
1. Do CCN and TCNPSC contracts in the USAID Mission adhere to Agency
regulations and policy, (AIDAR Appendix J and ADS 309), as applicable, or
AIDAR Appendix D for those specific approved provision exceptions for off-
shore hire TCNPSCs.
2. Has the CO cited the corrected PSC statutory authority? See FAR 37.104.
Does the Contracting Officer have the appropriate warrant authority?
4. Are funds available, have forward funding rules been followed, and was
obligation appropriate?
5. For TCNPSC positions, has the contracting preference been addressed and
documented? See ADS 309.
6. Has the job been classified IAW HCTM managed policies? See ADS
309.3.3.2?
OR
7. Has the Mission Director approved an exception from the local compensation
plan? See AIDAR Appendix J, sec. 4(c)(2)(ii)(A) or (B).
10. Does the file contain a signed offeror information form from the Contractor?
11. IAW ADS 309mad, is the CO's certification that the contract was awarded
pursuant to the class J&A, under the authority of AIDAR 706.302-70(b)(1),
that its conditions were met, and the cost is fair and reasonable in the file
(may be included in negotiation memo)?
12. If the class J&A was not used, and other limited competition was used, does
the file contain a Justification for Other than Full and Open Competition? See
ADS 309mad.
a. Security determination?
b. Medical clearance?
26
e. As applicable, a record that Agency conflict of interest requirements
have been requested (OGE 450)?
a. The number of applicants and how they were screened to the interview
level?
b. How the Contractor was assessed against the evaluation factors in the
solicitation, and selected based on technical qualifications?
c. How the position classification level for the Contractor was established?
16. If a ladder position, is the position classified IAW current policies, and were
the terms of evaluation and eligibility for successive ladder grades clearly
indicated in the solicitation and contract award?
17. Is the Checklist for Personal Services Contracts in the file and checked
accurately? See ASIST guidance.
a. The Cover Page, (AID 309-1) with the ethics code at the top of the
page appropriately marked?
27
c. Has the CO signed the necessary funding modifications?
20. Are off-shore hire TCNs authorized R&R? Is there a deviation on file to
authorize R&R, including Mission Director approval? See AIDAR Appendix J,
contract clause #9, paragraph (j) and ADS 309.
A. General
1. Does the USAID Mission adhere to the requirements of ADS 502? Has an in-
house Communications and Records (C&R) section been established? If not,
under what arrangements are the services being provided?
3. Do local staff handle unclassified mail, files, and related operations? Do they
track all incoming official mail (host country government partners, local
counterparts, unsolicited proposals, etc...?
7. Are record storage and shipping boxes packed in accordance with ADS 502?
8. a. Does the C&R supervisor make annual review of records in the offices and
in local storage?
9. Has the Mission established a proper disposition schedule for its electronic
records?
10. Has the Mission established procedures to ensure proper handling and
accurate delivery of official mail?
28
11. Does the Mission have a numbering/tracking system for all official outgoing
mail?
12. Does it store those records per Agency guidance and provide the Mission
Director with a weekly reading file of all official incoming and outgoing
correspondence?
13. Is there a system for managing/tracking, distributing and retaining all Mission
Orders and Mission Notices?
Unless otherwise noted, all references refer to the OFDA Field Operations Guide.
1. a. Does the Post have a designated Mission Disaster Relief Officer (MDRO)
complete with name and telephone numbers (day and night)?
b. Has this information been given and updated as necessary to the Office of
U.S. Foreign Disaster Assistance (OFDA) in USAID/W and the regional OFDA
representative?
2. Does the Post have a Mission Disaster Relief Plan (MDRP) and a Prevention,
Mitigation, and Preparedness (PMP) plan filed with the Post's Emergency
Action Plan (EAP)? (Regional OFDA offices should assist in development and
review of MDRPs and PMPs to ensure uniformity and comprehensiveness).
4. Are Mission Critical positions identified in an event of a disaster? Has the list
been shared with Post management? Are employees aware of their
responsibilities in an event of a disaster?
A. General
1. Is the Mission in compliance with the provisions of ADS 545? Are all USAID
standard software applications installed?
29
4. Is there off-site storage of backup media?
9. Are user passwords changed regularly and in accordance with CIO policy?
10. Does the Mission have documented operational procedures established, e.g.,
backup schedule, network/wiring diagram, VSAT cutover procedures,
emergency phone numbers, procedures for responding to end-user requests
for assistance, etc.?
11. Does the Mission have an inventory of systems software as well as systems
hardware, components, and peripheral devices by location?
12. Has the Mission worked with CIO to establish an IT Procurement Plan?
13. Is the network installed and maintained in accordance with CIO standard
Network Operations Guidelines?
b. Are goals set and plans in place for obtaining these goals?
16. Does the Mission have a local maintenance contract for hardware/software
support not provided by CIO?
B. Information Security
1. Do all members of the system staff and users with special access
privileges meet the requirements for sensitive positions outlined in ADS
561 and ADS 568?
30
2. Have all personnel accessing the system received a favorable
background check conducted by SEC or the RSO?
5. Is a “Visitors Log” (AID Form 545-6) maintained for all people entering the
computer/server room who do not have unescorted access privileges?
3. Has the system audit trail been reviewed for anomalies and access
violations on a regular basis? What is the schedule?
6. Are all users required to utilize a PIV and to enter a unique user ID to gain
access to the system?
31
9. Has the audit trail been archived and retained for at least 30 days?
b. Have all users received security training and signed form AID 545-1,
Unclassified Automated Information systems Request
Acknowledgement?
c. If a user has SBU access, have both forms AID Form 545-4, Computer
Access and Termination Request, and 545-5, Sensitive Data
Nondisclosure Agreement, been completed to document that access?
3. Are all active user IDs and passwords assigned to personnel currently
working in the facility supported by the system?
4. Have user access privileges been reviewed within the last year? Are PIV
and PIV-A cards utilized and controlled?
6. Has the system and its associated storage media been browsed to
ensure national security information is not being processed/stored on the
system and privacy data is being safeguarded appropriately?
8. Have system equipment and media used to process and store SBU
information been appropriately labeled?
10. Have procedures for transporting system equipment and media been
developed by the site ISSO and system manager/administrator?
32
14. Are system data, file, and record backup procedures regularly
implemented?
15. Have all systems users received information systems security awareness
training within the last year?
C. Cyber Security
1. What procedures has the ISSO implemented at the Mission to monitor and
educate system users? (ADS 568)
33
2. What procedures has Post established to manage information security
incidents?
527sac_081418