MCCE1
EXTENSION
NEW PLC IN LEGAL ENTITY:
TRANSFER ARCADIS U.S., INC.
EXISTING
PUMP NO 4
(FROPLC) W/
DEGAS. AIR
ELECTRICAL
BLOWER NO.3 CONSULTANTS
ROOM
E SOFT
REMOTE I/O
SCAVENGER SCRUBBER STARTER
(RIOER) AND
PUMP RECIRC. PUMP (2-P-1004/2- SCRUBBER UPS
STARTER NO.1 STARTER 1&2 ME-907) RECIRC. PUMP
6-P-1803 (2-P-0901/02) NO.3 STARTER
(2-P-0903)
EXISTING 2ELP-1
check layer
LIGHTING PANEL 2TE-4 30KVA
EXISTING 2RP-1 PANEL 2TE-2 MCC-E1 MCC-N1 2EDP-2 2EDP-4
15KVA

VFD-7A
6-P-2301 SEALS
MCC-E-3 VFD-5 VFD-2 SCAVENGER EXISTING MCCE2
3-P-1201 2-P-0602 EXTENSION
PUMP NO.2
VFD-7B VFD-1 MCC-E2
6-P-2302 2-P-0601 STARTER VFD-9
VFD-13
3-P-1203 6-P-1804 2-P-05 THIS DOCUMENT IS
GENERATOR (G-2)
RELEASED FOR THE
WELL F2 VFD VFD-14 PURPOSE OF INTERIM
ELECTRICAL 3-P-1204
ROOM REVIEW, NOT FOR
D WELL F1 VFD CONSTRUCTION
2EDP-1
VFD-8B VFD-3 NEW RO MEMBRANE
GEN TIE BREAKER FEED PUMP VFD
6-P-01 2-P-0603
VFD-28 GEN NO. 1 BREAKER
3-P-1206 VFD-6 VFD-4 NEW FUTURE RO
AND CONTROL 3-P-1202 2-P-04 MEMBRANE FEED
ATS BREAKERS PUMP VFD SBA
VFD-27 1A, 2A, 3A VFD-8A
3-P-1205 6-P-2303 MIRAMAR WEST

FUTURE ESB-F ESB-A


75KVA
208/120V THIS SPACE
RESERVED FOR
ESB-E ESB-B CLIENT LOGO
EXISTING MAIN
GEN NO. 2 BREAKER ATS-3A 50KVA SWITCHBOARD SWA
FUTURE ATS-3B AND CONTROL ATS-2A 120/240V CITY OF MIRAMAR –
ESB-D ATS-2B ATS BREAKERS
ATS-1B 1B, 2B, 3B
ATS-1A 2TE-1 2TE-3 2TN-1 ESB-C
REPLACEMENT AND
UPGRADE OF
2DP-2
2DP-1
NANOFILTRATION
2EDP-3 TRAINS AT
C
2EPP6 25KVA WEST WATER
BATTERY TREATMENT PLANT
CHARGER 120/240V
IT-1 IT-2 IT-9 CLIENT PROJ. NO.:
DAY TANK
REVISIONS

GENERATOR
ROOM

IT-3 IT-4 IT-10

TRANSFORMER
NEW FLORIDA POWER EXISTING FLORIDA ROOM
AND LIGHT POWER AND LIGHT
TRANSFORMER TRANSFORMER NO. DATE ISSUED FOR BY
COPYRIGHT: ARCADIS U.S., INC.
IT-5 IT-6 IT-11 2020
INJECTION
WELL PUMP PROJECT STATUS:

NO.3 JUCTION PROJECT NO.: 30201955


B NOTES
1.CONTRACTOR SHALL REUSE EXISTING CONDUIT WHEN POSSIBLE IF INSTALLING
BOX
JB-14 DATE: JULY 2024
NEW WRING FOR NEW ELECTRICAL AND INSTRUMENTATION EQUIPMENT. IT-13 IT-12
DESIGNED BY: -
HSP NO.4
2. COORDINATE MAIN AND GENERATOR SWITCHGEAR ENCLOSURES WITH EXISTING PUMP DRAWN BY: MK. SUBRAMANIAN
CONDUIT AND EQUIPMENT CURB LOCATIONS TO PLACE EQUIPMENT NEAR CONDUIT JUCTION BOX
STUB UPS. CHECKED BY: -
3-P-1204
SHEET TITLE
3. CONTRACTOR TO COORDINATE WITH FP&L FOR CONNECTION REQUIREMENTS GENERATOR (G-1)
FROM BUSSWAY TO TRANSFORMER.CONTRACTOR TO PROVIDE ALL SECONDARY ELECTRICAL
INJECTION JB-7B JB-8A JB-7A
TERMINATION POINTS AND MODIFICATIONS TO BUSSWAY AND TRANSFORMER
INCLUDING ALL METERING REQUIREMANTS. WELL PUMP
NO.2 JUCTION
ELECTRICAL BUILDING
BOX
INJECTION PLAN - DEMOLITION
WELL PUMP
NO.1 JUCTION
BOX

A
ELECTRICAL BUILDING PLAN - DEMOLITION
SCALE: 3/16" = 1'-0" 0' 4' 8' 12'

SCALE:
0 1
3/16" = 1'-0" BAR IS ONE INCH ON
UNREDUCED DRAWING

DRAWING NO.:

E-15
SHEET NO.: OF

18-07-2024 17:10:49 Autodesk Docs://AUS-30201955-Miramar Nanofiltration Design/E-3D-MND-R24.rvt