Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

1.IGBC Green Factory Building Version 2.0-21-23

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 6

Ava

ilab
Requirement Existingle
FactoryPoi
Building
Site Selection and Planning

SSP MR 1 Local Building Regulations Required

SSP MR 2 Soil Erosion Prevention & Control Required

SSP CR 1 Green Transportation 1

SSP CR 2 Basic Amenities 2


SSP CR 3 Natural Topography and Vegetation 2
SSP CR 4 Urban Heat Island Mitigation 4
SSP CR 5 Eco-Friendly Transportation 3
SSP CR 6 Universal Design 2
SSP CR 7 Outdoor Light Pollution Reduction 1
SSP CR 8 Awareness on Green Concepts 1
Total Credit Points 16
Water Conservation

WC MR 1 Rainwater Harvesting Required


WC MR 2 Water Efficient Plumbing Fixtures Required
WC CR 1 Sustainable Landscape Design 3
WC CR 2 Management of Irrigation System 2
WC CR 3 Enhanced Rainwater Harvesting 4
WC CR 4 Wastewater – Treatment 1
WC CR 5 Water Metering and Management 2
WC CR 6 Enhanced Water Efficiency 4
WC CR 7 Alternative Water Consumption 4
Total Credit Points 20
Energy Efficiency

EE MR 1 Eco-friendly Refrigerant Required


EE MR 2 Minimum Energy Performance Required
EE MR 3 Commissioning Plan for Building Systems NA
EE CR 1 Eco-friendly Refrigerant Management 1
EE CR 2 Enhanced Energy Performance 10
EE CR 3 Green Power 6
EE CR 4 Eco-friendly Power Backup Systems 1
EE CR 5 Energy Performance Monitoring 4
Total Credit Points 22
Materials & Resources

MR MR 1 Waste Management Required


MR CR 1 Sustainable Procurement 1
MR CR 2 Organic Waste Management 2
MR CR 3 Construction Waste Management NA
MR CR 4 Materials with Recycled Content NA
MR CR 5 Local Materials NA
MR CR 6 Use of Salvaged Materials NA
MR CR 7 Eco-friendly Wood Based Materials 2
Total Credit Points 5
Indoor Environment Quality and Occupational Health
IEQ MR 1 No Smoking Policy Required
IEQ MR 2 Minimum Fresh Air Requirements Required
IEQ MR 3 Avoid use of Asbestos in the Building Required
IEQ CR 1 Enhanced Fresh Air Ventilation 4
IEQ CR 2 Building Flush Out NA
IEQ CR 3 Low VOC Materials 2
IEQ CR 4 Eco-Friendly Housekeeping Chemicals 2
IEQ CR 5 Indoor Air Quality 3
IEQ CR 6 Daylighting 4
IEQ CR 7 Occupant Well-being Facility 2
Total Credit Points 17
Innovation in Design & Operation
ID CR 1.1 Innovation in Design & Operation 1
ID CR 1.2 Innovation in Design & Operation 1
ID CR 1.3 Innovation in Design & Operation 1
ID CR 1.4 Innovation in Design & Operation 1
ID CR 1.5 Innovation in Design & Operation NA
ID CR 2 IGBC AP (Accredited Professional) 1
Total Credit Points 5
Total Credit Score 85
Requirement Stated PMT Compliance
Refer Sheet

(i). Narrative and timestamp photographs of the measures


❖ Develop post occupancy erosion control implemented to prevent soil erosion.
measures such as maintenance of storm (ii). Storm water layout along with timestamp photographs of
water network and green cover. trenches/pits/ rainwater collection tank provided.
❖ In case of expansion/retrofitting, follow (iii). Operation and Maintenance (O&M) plan to prevent soil
compliance options recommended for New erosion post construction.
Factory project. (iv). For any retrofitting/ expansion/ addition in the factory, provide
documents for compliance as per New Factory guideline

Option-1: Public Transport : Locate the


factory within 2.0 km walking distance from (i). Aerial map highlighting the distance of public transport (intra-
an intra-city railway station (or) a permanent city railway station and or permanent Bus Stop) within 1000m from
bus stop within 1.0 km walking distance the main entrance of the factory.
Option-2: Shuttle Service : /Provide (ii). Timestamp Photographs showing the public transport.
dedicated shuttle service to cover atleast (iii). Copy of contract agreement recently signed between factory
50% of the employees management and shuttle service provider clearly indicating type and
no. of vehicles, along with seating capacity and Timestamp
photographs of shuttle
PMT Compliance Remarks
Not Complied Fire NOC Not avilable

Need to Check

Complied

You might also like