01.5 - Drainage
01.5 - Drainage
01.5 - Drainage
KEY PLAN
EXISTING STUBOUT
EXISTING STUBOUT
EXISTING STUBOUT DOOR ADDED
82Ø VP
EXISTING STUBOUT
P
KW
CORRIDOR
50Ø
9 FCO
110Ø WP
Ramp Slope 1:20 Ramp Slope 1:20
+0.75 +0.75
50Ø KWP
F.F.L F.F.L
8 7
50Ø KWP
50Ø KWP
Slope 1:20
2 1 1 2
50Ø KWP
) 1
YP
2
P (T
50
Ø
Ramp Slope 1:20 Ramp Slope 1:20
37 36 38 KW
KW
Ø
3
双头炒炉
75Ø WP 50
P
5 5 75Ø KWP
27 4 75Ø KWP
27 4 27 1
+0.75 Lift 1 +0.75
41 10
F.F.L 21 Persons F.F.L
41 FT 2
FT
75Ø KWP
75Ø WP
NOODLES Lift 2
21 Persons
FT
LEGEND
110Ø KWP
FT
75Ø KWP
110Ø SP
FA BOX
+0.75 +0.75
F.F.L F.F.L
39 40 50Ø WP
82Ø VP
FREEZER OFFICE D/WASH 50 SYMBOL DESCRIPTION
50Ø WP
50Ø WP
12 16 25
+0.75
WASTE PIPE
F.F.L
75Ø KWP
+0.75 +0.75
F.F.L F.F.L
16 20 28 30 20 20 FCO
50Ø KWP
SOIL PIPE +0.75 Ramp Slope 1:20
+0.50
F.F.L
16 19 23
F.F.L
CORRIDOR FCO
KITCHEN WASTE PIPE +0.75
F.F.L Ramp Slope 1:20 +0.50
F.F.L
+0.50
F.F.L
Ramp Slope 1:20 +0.75
F.F.L
75Ø WP
750Ø WP
750Ø WP
+0.50
F.F.L +0.50
GREASE TRAP 110Ø WP 110Ø WP GREASE TRAP 110Ø KWP 110Ø KWP
F.F.L
VENT PIPE
110Ø WP
TYPE-C TYPE-C MAIN KITCHEN
50
Ø
TRENCH DRAIN
KW
CORRIDOR
110Ø SP
110Ø SP
31 49 26 FT FT
P (T
65Ø VP
YP
)
40Ø WP
40Ø WP
FCO 17 FCO
12 12 FLOOR TRAP
50Ø KWP
50Ø WP
110Ø KWP 110Ø KWP
110Ø SP 110Ø SP
15
75Ø KWP
14 24 50Ø KWP 24 13 FLOOR CLEAN OUT
26
50
50Ø KWP
Ø
STORE PREPARATION 43
KW
34 32
FT SHOW KIT BBQ KIT
P (T
50Ø KWP
50Ø WP
FT )
31
YP
P (TYP
50Ø KW 21 FT
)
110Ø KWP
110Ø WP
110Ø SP
50Ø
KW
P (T 20 18
YP
)
35 33 50 21 50 12 28
42 FCO 30
29 6 49
31 FCO FCO
75Ø WP
WASH AREA
FT
USE :
50Ø WP
40Ø WP 40Ø WP
SERVICE
COUNTER
45
CONCEPT DESIGN
40Ø WP
REVISIONS
CASH COUNTER
SERVICE
COUNTER DRAWN CHECKED
REV. DESCRIPTIONS DATE BY BY
CLIENT :
OFFICE
TEA CABINET
RECEPTION
PROJECT :
PROPOSED TASTY YUE
RESTAURANT IN
SERVER
EXISTING RESIDENTIAL AND
1700X2930 COMMERCIAL BUILDING AT GF
LEVEL, DIP - UAE
CONSULTANT :
COUNTER
ID CONTRACTOR :
2
2 1 UNESIA INTERIOR L.L.C
1
DRAWING TITLE :
PROPOSED
DRAINAGE PLAN
Ramp Slope 1:20
SCALE : DRAWN BY :
AS SHOWN @ A2 MAH
DATE : CHECKED BY :
September 4, 2021 WANG