Drawing
Drawing
Drawing
ORGING
PONGO
HALF TOP HALF BOTTOM
LEGEND
REFERENCE DRAWINGS:-
G.L. G.L.
N.G.L. N.G.L.
SECTION AT "B-B"
SECTION AT "C-C"
REFERENCE DRAWINGS:-
AT SUPPORT AT MID
SECTIONAL ELEVATION
REFERENCE DRAWINGS:-
TOP PLAN
LEGEND
SECTION A-A
REFERENCE DRAWINGS:-
DETAIL-A
SECTIONAL ELEVATION
B C
B C PLAN
REFERENCE DRAWINGS:-
NOTES
SECTION C-C
LEGEND
REFERENCE DRAWINGS:-
DETAIL-`X'
ϒ ³
CLIENT: PROJECT: DPR CONSULTANTS: TITLE:
DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
MAJOR BRIDGE AT CH-5+790
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. SPAN (1 X 100 M)
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 02 of 02
"X"
SECTIONAL ELEVATION
B C
B C PLAN
REFERENCE DRAWINGS:-
NOTES
SECTION C-C
LEGEND
REFERENCE DRAWINGS:-
DETAIL-`X'
ϒ ³
CLIENT: PROJECT: DPR CONSULTANTS: TITLE:
DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
MAJOR BRIDGE AT CH-9+266
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. SPAN (1 X 100 M)
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 02 of 02
NOTES
SECTIONAL ELEVATION
REFERENCE DRAWINGS:-
TOP PLAN
LEGEND
SECTION A-A
REFERENCE DRAWINGS:-
DETAIL-A
SECTIONAL ELEVATION
REFERENCE DRAWINGS:-
TOP PLAN
LEGEND
SECTION A-A
REFERENCE DRAWINGS:-
DETAIL-A
ORGING
PONGO
HALF TOP HALF BOTTOM
LEGEND
REFERENCE DRAWINGS:-
G.L. G.L.
N.G.L. N.G.L.
SECTION AT "B-B"
SECTION AT "C-C"
REFERENCE DRAWINGS:-
AT SUPPORT AT MID
SECTIONAL ELEVATION
B C
B C PLAN
REFERENCE DRAWINGS:-
NOTES
SECTION C-C
LEGEND
REFERENCE DRAWINGS:-
DETAIL-`X'
ϒ ³
CLIENT: PROJECT: DPR CONSULTANTS: TITLE:
DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
MAJOR BRIDGE AT CH-16+959
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. SPAN (1 X 100 M)
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 02 of 02
"X"
SECTIONAL ELEVATION
B C
B C PLAN
REFERENCE DRAWINGS:-
NOTES
SECTION C-C
LEGEND
REFERENCE DRAWINGS:-
DETAIL-`X'
ϒ ³
CLIENT: PROJECT: DPR CONSULTANTS: TITLE:
DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
MAJOR BRIDGE AT CH-19+018
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. SPAN (1 X 100 M)
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 02 of 02
"X"
SECTIONAL ELEVATION
B C
B C PLAN
REFERENCE DRAWINGS:-
NOTES
SECTION C-C
LEGEND
REFERENCE DRAWINGS:-
DETAIL-`X'
ϒ ³
CLIENT: PROJECT: DPR CONSULTANTS: TITLE:
DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
MAJOR BRIDGE AT CH-22+122
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. SPAN (1 X 100 M)
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 02 of 02
"X"
SECTIONAL ELEVATION
B C
B C PLAN
REFERENCE DRAWINGS:-
NOTES
SECTION C-C
LEGEND
REFERENCE DRAWINGS:-
DETAIL-`X'
ϒ ³
CLIENT: PROJECT: DPR CONSULTANTS: TITLE:
DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
MAJOR BRIDGE AT CH-27+151
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. SPAN (1 X 100 M)
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 02 of 02
"X"
SECTIONAL ELEVATION
B C
B C PLAN
REFERENCE DRAWINGS:-
NOTES
SECTION C-C
LEGEND
REFERENCE DRAWINGS:-
DETAIL-`X'
ϒ ³
CLIENT: PROJECT: DPR CONSULTANTS: TITLE:
DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
MAJOR BRIDGE AT CH-35+674
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. SPAN (1 X 100 M)
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 02 of 02