Checklist Sheet

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 42

DEOKE CONSULT

(CIVIL AND STRUCTURAL ENGINEERS)


CONSTRUCTION ENGINEER'S DAILY REPORT No.
CONTRACT No.:
Contractor: Engineer: DEOKE CONSULT Weather:
DAYS / NUMBER DAYS NUMBER/BREAK/IDDLE/HOURS
PERSONNEL EQUIPMENT
M T W T F S M T W T F S

Manager Excavator
Quantity Surveyor Bulldozer
Surveyor/Geodetic Grader `
Supervisor Traxcavator
Concrete Foreman JCB
Steel Bender Poker Vibrator
Earthworks Foreman Plate Compactor
Carpenters Vibrating Roller
Masons Tipper Trucks
Operators Concrete Mixers
Drivers Water Pump
Labourers Water Tanker
Security
Mechanic

Site Activities

Material on Site

Testing

Surveying

Engineer's Remarks Particular Occurences, Sample Taken, Troubles

Signed by Engineer: Date: Signed by Contractor's Date:


DEOKE CONSULT
(CIVIL AND STRUCTURAL ENGINEERS)

SUMMARY OF DAILY SCHEDULE


Contract: CONSTRUCTION OF CONCRETE BRIDGE
Contract No:
Employer: DEPARTMENT OF URBAN ROADS
Engineer: DEOKE CONSULT
Contractor:
SECTION:
Ref.NO. : Date:
REMARKS &
DATE WORK ITEM LOCATION DETAIL OF WORKS
INSPECTION

ISSUED BY THE SITE SUPERVISOR RECEIVED BY THE CONTRACTOR

Name: Name:
Signature: Signature:
Date: Date:
DEOKE CONSULT
(CIVIL AND STRUCTURAL ENGINEERS)

SUPPLY OF MATERIALS
Contract: CONSTRUCTION OF CONCRETE BRIDGE
Contract No:
Employer: DEPARTMENT OF URBAN ROADS
Engineer: DEOKE CONSULT
Contractor:
SECTION:
Ref.NO. :
ARRIVAL DISPOSAL REMARKS &
DATE TYPE OF MATERIAL QUANTITY WAYBILL SERIAL
TIME TIME INSPECTION

ISSUED BY THE SITE SUPERVISOR RECEIVED BY THE CONTRACTOR


Name: Name:
Signature: Signature:
Date: Date:
DEEP ENGINEERING
PROJECT: CONSTRUCTION OF SIBL HEAD OFFICE
LOCATION OSU
CONTRACTOR: MOLDERS GHANA LIMITD
ENGINEER: DEEP ENGINEERING

SITE INSTRUCTION No …............................ Date:…...........................


SECTION : _____________________________________________________________

SUBJECT: _____________________________________________________________

Details of work:

Location:

Material used:

Labour content:

Sketches:

ISSUED BY THE ENGINEER RECEIVED BY THE CONTRACTOR(REP)


Name: Name:
Signature: Signature:
Date: Date:
DEOKE CONSULT
(E N G I N E E R S, A R C H I T E C T S & D E V. C O N S U L T A N T S)

REQUEST FOR INSPECTION


Contract: CONSTRUCTION OF CONCRETE BRIDGE
Contract No:
Employer: DEPARTMENT OF FEEDER ROADS
Engineer: DEOKE CONSULT
Contractor:
Following works are/will be ready for inspection at: ………...………..……….am/pm,pn…………………………...……..(Time/Date/day)
Work is intended to commence at:…..……………………………………..am/pm,on……………...……………………….………….(Time/Date/day)
DESCRIPTION OF WORKS…………………………………………………………………………..…………………………………………………..………………………
…………………………………………………………………………………………………………………….………………………………………..……………………………….
Location………………………………………………………………………………………………………………………………………………..……………………………….
TYPE OF WORK (NOTE: INCLUDING DETAILS OF MATERIAL, LABOUR AND PLANT TO BE USED)
…………………………………………………………………………………………………………………………………………………………….………………………………….
……………………………………………………………………………………………………………………………………………...……………………………………………….
……………………………………………………………………………………………………………………………………………………..………………………………………..
………………………………………………………………………………………………………………………………………………………...…………………………………….
Received at:………………………am/pm,on…………………………………………By………………………………..Signature……………………………………
………………………………………………………………………………………………………………………...…………………………………………………………………….
REMARKS…………………………………………………………………………………………………………………...…………………………………………………...……..
…………………………………………………………………………………………………………………………………………………..………………………………….……….
…………………………………………………………………………………………………………………………………………………..………………………………...……….
…………………………………………………………………………………………………………………………………………………………………..…………………...…….
………………………………………………………………………………………………………………………………………………………………………………………......….
……………………………………………………………………………………………………………………………………………………………………………...………….……
……………………………………………………………………………………………………………………………………………………………………...…..……………..……
Inspected by:…………………………..……..at………………...………….am/pm,on…………………...………signature…………………..……………………
………………………………………………………………………………………………………………………………………….………………………………...………………...
Engineer's Comments:
1. Delete as Applicable a. Inspection passed. The Contractor is allowed to proceed with the works
b. Remedial works listed below to be completed and inspection required afterwards.
c. Remedial works listed below to be completed but no further inspection required.
Remedial Works To Be Completed: ………………………………………………………………………………………………………………………………….…
…………………………………………………………………………………………………………………………………………………………………………………………….
…………………………………………………………………………………………………………………………………………………………………………………………….
…………………………………………………………………………………………………………………………………………………………………………………………….
…………………………………………………………………………………………………………………………………………………………………………………………….
…………………………………………………………………………………………………………………………………………………………………………………………….
…………………………………………………………………………………………………………………………………………………………………………………………….
…………………………………………………………………………………………………………………………………………………………………………………………….

CONTRACTOR ENGINEER DISTRIBUTION


Submitted By………………………………...……………. Received By………………………………………………..

……………………………………………………………………. On……………………………………………………………… a. Team Leader


b. Site Engineer
……………………………………………………………………. At……………………………………………………………… c. Chief Resident Engineer
d. Quantity Surveyor
……………………………………………………………………. Name……………………………………………………….. e. Senior Surveyor
f. Contractor's Representative
Signature……………………………………………………. Signature………………………………………………….
DEOKE CONSULT
(E N G I N E E R S, ARCHITECTS & D E V. C O N S U L T A N T S)

DAYWORKS ORDER No:


CONTRACTOR:
The Contractor,s Address)

(Reference)
(Date)

CONSTRUCTION OF STEEL BRIDGE


CLIENT: DEPARTMENT OF FEEDER ROADS

In accordance with the provisions of Sub-Clause 52.4 of the Conditions of Contract you are hereby
instructucted to execute the following works on a Dayworks basis:

(Insert description of dayworks to be executed.)

This work shall be valued in accordance with Sub-Clause 52.4 of the Conditions of Contracts and th
included in your accounts against (insert item number) in the signed BoQ.

These sub-total for this Dayworks Order shall be given separately at the end of the Bill Section
(insert Number) in your subsequenct claims for interim payment.

(insert signature)

(insert name)
Engineer's Representative

cc DFR Regional Office


DFR Head Office

30
DEOKE CONSULT
(E N G I N E E R S, ARCHITECTS & D E V. C O N S U L T A N T S)

VARIATION ORDER No:


CONTRACTOR:
(The Contractor,s Address)

(Reference)
(Date)

CONSTRUCTION OF CONCRETE BRIDGE

In accordance with the provisions of Sub-Clause 52.4 of the Conditions of Contract.

Description of Variation Estimated Estimated


Value of Value of
Omission (GH¢) Addition(GH¢)

(Attach supplementary sheet in BoQ format


if necessary and 'see attached breakdown')

Estimated Total Omissions / Additions


Net Omissions / Addtions
Net Omissions / Addtions as percentage of the Contract Sum
The Works to be measured and valued on completion
This variation shall be valued in accordance with Sub-Clause 52.4 of the Conditions
of Contracts at (tick one):

o Bill of Quantities rates or prices


o Rates derived from Bills of Quantities rates or prices
o Rates to be Agreed
o Accepted Quotation
o No charge
Approved/
Drafted by: ……………………….. Issued by: ………………………..
Name: ……………………….. Name: ………………………..
Designation: ……………………….. Designation: ………………………..
Date: ……………………….. Date: ………………………..

31
DEOKE CONSULT
(E N G I N E E R S, A R C H I T E C T S & D E V. C O N S U L T A N T S)

REQUEST FOR INSPECTION


Contract: CONSTRUCTION OF CONCRETE BRIDGE
Contract No:
Employer: DEPARTMENT OF URBAN ROADS
Engineer: DEOKE CONSULT
Contractor:
SECTION:

BQ Item No. Date


Description Time
of Estimated
Works Quantity
Location
Requested by Contractor Received by CRE's Staff
Signature Signature
Name Name

Material Equipment

Labourers Others

Person in charge of works on Site

1. Setting Out o 10. Others (Specify) o


2. Materials o
3. Formwork o
4. Reinforcement o
5. Measurement o
6. Concrete Works o
7. Laboratory o
8. Insitu Test o
9. Roadworks o

CRE's staff Date Accepted o


Comment Not Accepted o
Signature
CRE Date Approved o
Signature Disapproved o

Note: Request for Inspection should be submitted at least 24 hours in advance

32
DEOKE CONSULT
(E N G I N E E R S, A R C H I T E C T S & D E V. C O N S U L T A N T S)

INSPECTION SHEET
Contract: CONSTRUCTION OF STEEL BRIDGES
Contract No:
Employer: DEPARTMENT OF FEEDER ROADS
Engineer: ARCSCALE CONSULT
Contractor:
SECTION:
General Site Clearance Date
Item No.: Location
Item Description Unit Q'ty Item Description Unit Q'ty

Materials Equipment

Labourers Others

Item No. Inspection Result


Clearing, grubbing
D.100.2 Removal and disposal of trees
Backfilling of hole left by the removal of stumps and roots

CHIEF RESIDENT ENGINEER'S STAFF COMMENT:

INSPECTION BY CHIEF RESIDENT ENGINEER'S STAFF APPROVED BY THE CHIEF RESIDENT ENGINEER
Name: Name:
Signature: Signature:
Date: Date:

33
ARCSCALE CONSULT
(E N G I N E E R S, A R C H I T E C T S & D E V. C O N S U L T A N T S)

INSPECTION SHEET
Contract: CONSTRUCTION OF STEEL BRIDGES
Contract No:
Employer: DEPARTMENT OF FEEDER ROADS
Engineer: ARCSCALE CONSULT
Contractor:
SECTION:
Preparation Works Date
Setting out, Geometric Tolerance and Rectification Location
Item Description Unit Q'ty Item Description Unit Q'ty

Materials Equipment

Labourers Others

Item No. Inspection Result


Any error in the Survey Information
Setting out Line and Level of the Works at less than 25m intervals
Ground Cross Section at 25m intervals after setting out & Site Clearance
Horizontal Alignment
Design Bank Level
Geometric Concrete Surface Regularity
Tolerance Space for Backfill
Cutting and Embankment Slopes
Bed Width
Earthworks
Base and Sub-base for Reinforcement
Wearing course for Reinforcement
CHIEF RESIDENT ENGINEER'S STAFF COMMENT:

INSPECTION BY CHIEF RESIDENT ENGINEER'S STAFF APPROVED BY THE CHIEF RESIDENT ENGINEER
Name: Name:
Signature: Signature:
Date: Date:

34
EUDIA-PLUS ENGINEERING SERVICES LIMITED
NON CONFORMANCE REPORT (NCR)
CONTRACT: PROPOSED THREE BLOCK, 10 STOREY 1,2&3 BEDROOM APARTMENTS AT SHIASHIE, EAST LEGON
CONTRACTOR: CLIFTON HOMES
ENGINEER: EUDIA-PLUS ENGINEERING SERVICES LIMITED
CLIENT: CLIFTON HOMES
DATE : TIME : NCR No. :
COMPONENT/ACTIVITY:
CONDITION :

LOCATION

REMEDIAL ACTION
ACTION

SKETCHES

REPORTED BY RECEIVED BY DISTRIBUTION


Sign: ……………………………………………….. Sign: ……………………………………………….. a. Project Manager
b. Site Engineer
Name: …………………………………………….. Name: …………………………………………….. c. Quantity Surveyor

Position: ………………………………………… Position: …………………………………………


Date: ………………………………………………. Date: ……………………………………………….
EUDIA-PLUS ENGINEERING SERVICES LIMITED
REMEDIAL ACTION SHEET (RAS)
CONTRACT: PROPOSED THREE BLOCK, 10 STOREY 1,2&3 BEDROOM APARTMENTS AT SHIASHIE, EAST LEGON
CONTRACTOR: CLIFTON HOMES
ENGINEER: EUDIA-PLUS ENGINEERING SERVICES LIMITED
CLIENT: CLIFTON HOMES
DATE : TIME : RAS No. :
COMPONENT/ACTIVITY: REF TO NCR No.
ACTION INSTRUCTED :

LOCATION

ACTION TAKEN

REPORTED BY RECEIVED BY DISTRIBUTION


Sign: ……………………………………………….. Sign: ……………………………………………….. a. Project Manager
b. Site Engineer
Name: …………………………………………….. Name: …………………………………………….. c. Quantity Surveyor

Position: ………………………………………… Position: …………………………………………


Date: ………………………………………………. Date: ……………………………………………….
ARCSCALE CONSULT
(E N G I N E E R S, A R C H I T E C T S & D E V. C O N S U L T A N T S)

REMEDIAL ACTION SHEET


CONTRACT: CONSTRUCTION OF STEEL BRIDGES
CONTRACT NO:
CONTRACTOR:
ENGINEER: ARCSCALE CONSULT
EMPLOYER: DEPARTMENT OF FEEDER ROADS
DATE: Ref. NCR No.: RAS No. :
COMPONENT/ACTIVITY:
ACTION INSTRUCTED ………………………………………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………………………………………………………………..
……………………………………………………………………………………………………………………………………………………………………………………..

……………………………………………………………………………………………………………………………………………………………………………………..
……………………………………………………………………………………………………………………………………………………………………………………..
……………………………………………………………………………………………………………………………………………………………………………………..
……………………………………………………………………………………………………………………………………………………………………………………..
……………………………………………………………………………………………………………………………………………………………………………………..
……………………………………………………………………………………………………………………………………………………………………………………..
……………………………………………………………………………………………………………………………………………………………………………………..
……………………………………………………………………………………………………………………………………………………………………………………..
……………………………………………………………………………………………………………………………………………………………………………………..
……………………………………………………………………………………………………………………………………………………………………………………..
……………………………………………………………………………………………………………………………………………………………………………………..
ACTION TAKEN…………………………………………………………………………………………………………………………………………………..
……………………………………………………………………………………………………………………………………………………………………………………..
……………………………………………………………………………………………………………………………………………………………………………………..
……………………………………………………………………………………………………………………………………………………………………………………..
……………………………………………………………………………………………………………………………………………………………………………………..
……………………………………………………………………………………………………………………………………………………………………………………..
……………………………………………………………………………………………………………………………………………………………………………………..
……………………………………………………………………………………………………………………………………………………………………………………..
……………………………………………………………………………………………………………………………………………………………………………………..
……………………………………………………………………………………………………………………………………………………………………………………..
……………………………………………………………………………………………………………………………………………………………………………………..
……………………………………………………………………………………………………………………………………………………………………………………..
……………………………………………………………………………………………………………………………………………………………………………………..
……………………………………………………………………………………………………………………………………………………………………………………..
……………………………………………………………………………………………………………………………………………………………………………………..
REPORTED BY APPROVED BY DISTRIBUTION
Sign: ……………………………………………….. Sign: ……………………………………………….a. Team Leader
b. Site Engineer
Name: …………………………………………….. Name: …………………………………………….c. Chief Resident Engineer
d. Quantity Surveyor
Position: ………………………………………… Position: ……………………………………… e. Senior Surveyor
f. Contractor's Representative
Date: ………………………………………………. Date: ………………………………………………
ARCSCALE CONSULT
(E N G I N E E R S, A R C H I T E C T S & D E V. C O N S U L T A N T S)

PROGRAMME OF WORKS
CONTRACT : CONSTRUCTION OF STEEL BRIDGES
CONTRACT No. :
CONTRACTOR: LOCATION: ……………………………(CENTRAL REGION) DATE: ………………………..
Year
No. WORK ITEMS Unit Qty Months 1 2 3 4 5 6 7 8 9 10 11 12

Weeks

1 Mobilization sum

2 Clearance (Bridge Site, Roads & River Channel). m²

3 Setting Out (Bridge, Road & River Channel). sum

4 Excavation (Abutment Trenches, Road) m³

5 Reinforced Concrete

Bridge Foundation m³

Abutment Walls m³

Ballast Walls, Head Walls, Approach Slab m³

Culverts m³

6 Earthworks (Approaches & Road) m³

7 Delivery, Assembling & Lauching of Bridgess sum

8 Sub-base (Road) m²

9 Protection Works (Seeding & Pitching of Slopes) m³

10 Rocked Filled Gabions m³

11 Road Furniture sum

12 Reinstatement of Borrow Pits, etc. sum

13 Demolization sum

43
ARCSCALE CONSULT
(E N G I N E E R S, A R C H I T E C T S & D E V. C O N S U L T A N T S)

PHYSICAL MONTHLY PROGRESS REPORT


CONTRACT : CONSTRUCTION OF STEEL BRIDGES
CONTRACT No. :
CONTRACTOR: LOCATION: ……………………………(CENTRAL REGION) DATE:
No. ACTIVITIES Current Previous Percentage Programmed
Remark
(%) (%) Change ( % ) (%)
1 Mobilization
2 Clearance (Bridge Site, Roads & River Channel).
3 Setting Out (Bridge, Road & River Channel).
4 Excavation (Abutment Trenches, Road)
5 Reinforced Concrete
Bridge Foundation
Abutment Walls
Ballast Walls, Head Walls, Approach Slab
Culverts

6 Earthworks (Approaches & Road)

7 Delivery, Assembling & Lauching of Bridgess


8 Sub-base (Road)
9 Protection Works (Seeding & Pitching of Slopes)

10 Rocked Filled Gabions


11 Road Furniture
12 Reinstatement of Borrow Pits, etc.

13 Demolization

44
ARCSCALE CONSULT
(E N G I N E E R S, A R C H I T E C T S & D E V. C O N S U L T A N T S)

PROGRESS REPORT
DATE:
CONTRACT: CONSTRUCTION OF STEEL BRIDGE

CONTRACTOR:
REGION : CENTRAL
COMMENCEMENT DATE:
COMPLETION DATE:
ORIGINAL CONTRACT SUM:
REVISED CONTRACT SUM:
PREVIOUS EXPENDITURE:
VALUE OF CURRENT WORK:
TOTAL EXPENDITURE TO - DATE :
PERCENTAGE OF WORK COMPLETED TO - DATE:
NO PHYSICAL DETAILS BRIEF DESCRIPTION OF % OF CONTRACT % COMPLETED
OF WORK TO BE DONE WORK TO BE DONE VALUE TO - DATE
OR AMOUNT IN BOQ

1 GENERAL ITEMS

2 BRIDGE FOUNDATION

3 APPROACH ROAD

4 BRIDGE COMPONENTS

5 RELIEF CULVERTS

6 ROADS

TOTAL

WHICH OF THE WORK HAVE BEEN COMPLETED:


Bride foundations:
Approach Road:
Bridge Components Launching and Erection:
Relief Culvert:
Roads:

COMMENTS ON CONTRACTOR'S PERFOMANCE:

Signature …………………………..

45
ARCSCALE CONSULT
(E N G I N E E R S, A R C H I T E C T S & D E V. C O N S U L T A N T S)

TRIAL MIX OF CONCRETE FOR CLASS


Contract: CONSTRUCTION OF STEEL BRIDGES
Contract No:
Employer: DEPARTMENT OF FEEDER ROADS
Engineer: ARCSCALE CONSULT
Contractor:
SECTION:
Date Trial No. W/C (%) S/A (%) Unit Content (kg/m³) Slump (cm) Compressive Strength (N/mm²)
Water Cement Sand 7 days 28 days

Slump:

TESTED BY CHECKED BY APPROVED BY

46
TRIAL MIX OF CONCRETE FOR CLASS

46
ARCSCALE CONSULT
(E N G I N E E R S, A R C H I T E C T S & D E V. C O N S U L T A N T S)

CONCRETE CUBE COMPRESSIVE STRENGTH


Contract: CONSTRUCTION OF STEEL BRIDGES
Contract No:
Employer: DEPARTMENT OF FEEDER ROADS
Engineer: ARCSCALE CONSULT
Contractor:
SECTION: Data Sheet No.
TEST NO. SAMPLE DATE COMPR
NO. SLUMP SAMPLE MADE TESTED AGE AREA LOAD (KN) STRENGTH
LOCATION AND STRUCTURE REMARKS
(cm) SIZE (mm²) (Kn/mm²)

47
TESTED BY CHECKED BY APPROVED BY

47
CONCRETE CUBE COMPRESSIVE STRENGTH

47
ARCSCALE CONSULT
(E N G I N E E R S, A R C H I T E C T S & D E V. C O N S U L T A N T S)

CONCRETE PLACING RECORD


Contract: CONSTRUCTION OF STEEL BRIDGES
Contract No:
Employer: DEPARTMENT OF FEEDER ROADS
Engineer: ARCSCALE CONSULT
Contractor:
SECTION:
LOCATION:
STRUCTURE:
CONCRETE CLASS:
DATE:
TRUCK NO TIME SLUMP REMARKS
ARRIVAL START FINISH (cm)
POURING POURING

48
TESTED BY CHECKED BY APPROVED BY

48
ARCSCALE CONSULT
(E N G I N E E R S, A R C H I T E C T S & D E V. C O N S U L T A N T S)

DATA SHEET FOR DESIGN OF CONCRETE MIX


Contract: CONSTRUCTION OF STEEL BRIDGES
Contract No:
Employer: DEPARTMENT OF FEEDER ROADS
Engineer: ARCSCALE CONSULT
Contractor:
SAMPLE No.: DATE:
1. Specified Mix of Concrete
Comp Max Gravel Admixture
Stre- Size
Slump Water Cement W/C S/A Sand
ngth of
28 days AGG
N/mm² m/m cm kg/m³ kg/m³ % % kg/m³ kg/m³ kg/m³ kg/m³ kg/m³

2. Source of Material

Chippings Sand

Cement Admixture

3. Aggregate
Aggregate Max Size Flakiness Index Specific Absorption Unit Abrasion
Gravity Weight

Chippings

Sand

4. Cement
Specific Setting Time Normal Soundness Compressive Strength
Gravity Initial (hr) Final (hr) Consistence (%) 3 days (kg/cm²) 7 days (kg/cm²)

TESTED BY CHECKED BY APPROVED BY

49
DEOKE CONSULT
(E N G I N E E R S, A R C H I T E C T S & D E V. C O N S U L T A N T S)

SURVEYING DATA SHEET No:


CONTRACT: CONSTRUCTION OF STEEL BRIDGES
CONTRACT NO:
CONTRACTOR:
ENGINEER: ARCSCALE CONSULT
EMPLOYER: DEPARTMENT OF FEEDER ROADS
Description of works to be surveyed: Date Request:
…………………………………………………………………………………………………………………………………………………………………….…………….………………………….
………………………………………………………………………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………………………………………….………………………….
………………………………………………………………………………………………………………………………………………………………………………………….………………….
………………………………………………………………………………………………………………………………………………………………………………………….………………….
……………………………………………………………………………………………………………………………………………………………………………………….…………………….
……………………………………………………………………………………………………………………………………………………………………………………….…………………….
………………………………………………………………………………………………………………………………………………………………………………………………….………….
…………………………………………………………………………………………………………………………………………………………………………………………………….……….
…………………………………………………………………………………………………………………………………………………………………………………………………….……….
Between Chainages Chainage No. Actual Level Drawings Levels Difference Comments
…………………………….. ……………………….. ……………………………. ………………………………. ……………………………….. …………………………………….
…………………………….. ……………………….. ……………………………. ………………………………. ……………………………….. …………………………………….
…………………………….. ……………………….. ……………………………. ………………………………. ……………………………….. …………………………………….
……………………………. ……………………….. ……………………………. ………………………………. ……………………………….. …………………………………….
……………………………. ……………………….. ……………………………. ………………………………. ……………………………….. …………………………………….
……………………………. ……………………….. ……………………………. ………………………………. ……………………………….. …………………………………….
…………………………… ……………………….. ……………………………. ………………………………. ……………………………….. …………………………………….
…………………………… ……………………….. ……………………………. ………………………………. ……………………………….. …………………………………….
Other Works
……………………………………………………………………………………………………………………………………………………………………………………….
……………………………………………………………………………………………………………………………………………………………………………………….
……………………………………………………………………………………………………………………………………………………………………………………….
……………………………………………………………………………………………………………………………………………………………………………………….
Engineer's Surveyors remarks.
……………………………………………………………………………………………………………………………………………………………………………………….
……………………………………………………………………………………………………………………………………………………………………………………….
……………………………………………………………………………………………………………………………………………………………………………………….
……………………………………………………………………………………………………………………………………………………………………………………….
Contractor's Surveyor Engineer's Surveyor

Name: ………………………………………………………… Name: ……………………………………………………………..


Signature:………………………………………………….. Signature: ……………………………………………………….
Date: …………………………………………………………. Date: ……………………………………………………………….

Cc. Chief ResidentEngineer


Surveyor's File
DEOKE CONSULT
(E N G I N E E R S, A R C H I T E C T S & D E V. C O N S U L T A N T S)

QUALITY CONTROL AND LABORATORY TEST SHEET


SUMMARY OF FIELD DENSITY RESULT
Contract: CONSTRUCTION OF STEEL BRIDGES
Contract No:
Employer: DEPARTMENT OF FEEDER ROADS
Engineer: ARCSCALE CONSULT
Contractor:
SECTION :
FIELD TEST LABORATORY TEST
TEST DATE FIELD MC WET DRY O.M.C M.D.D COMPACTION
NO.
LOCATION
TESTED (%) DENSITY (%) DENSITY (%) (g/cm²) (%) (%)
REMARKS

TESTED BY CHECKED BY APPROVED BY


ARCSCALE CONSULT
(E N G I N E E R S, A R C H I T E C T S & D E V. C O N S U L T A N T S)

QUALITY CONTROL AND LABORATORY TEST SHEET


SUMMARY OF SOIL AND GRANULAR MATERIAL TEST RESULT
Contract: CONSTRUCTION OF STEEL BRIDGES
Contract No:
Employer: DEPARTMENT OF FEEDER ROADS
Engineer: ARCSCALE CONSULT
Contractor:
SECTION: CONTRACTOR:
LOCATION REQUIRED PROPERTIES
SAMPLE DATE OF BORROW DEPTH GRADATION C.B.R
MATERIAL L.L (%) P.L (%) P.I (%) M.D.D (%)
NO. SAMPLE PIT (M) Passing 0.074 O.M.C (%) (MDDx95%) REMARKS
(%)

52
ARCSCALE CONSULT
(E N G I N E E R S, A R C H I T E C T S & D E V. C O N S U L T A N T S)

QUALITY CONTROL AND LABORATORY TEST SHEET


PRE-NOTIFICATION OF LABORATORY/INSITU TEST
Contract: CONSTRUCTION OF STEEL BRIDGES
Contract No:
Employer: DEPARTMENT OF FEEDER ROADS
Engineer: ARCSCALE CONSULT
Contractor:
SECTION:
Ref. No.: Date:
Test Item √ Location Time of Inspection Remarks
D General
E
N
S Sub-Grade
I
T Sub-Base
Y

M Backfill
A
T
E Gradation
R
I Compaction
A
L Compaction
CBR
Penetration
Sampling Concrete

Asphalt

Prime Coating

Compressive Strength

Proofrolling Test

Slump Test

PREPARED BY APPROVED BY
Name: Name:

Signature: Signature:

Date: Date:
ARCSCALE CONSULT
(E N G I N E E R S, A R C H I T E C T S & D E V. C O N S U L T A N T S)

SECTION:
No. SI
CONTRACT: Construction of Steel Bridges CONTRACT No.:

DATE:

TO:

Contractor's Representative:

YOU ARE HEREBY INSTRUCTED TO:

Submit a quotation by ……………………………………………………… for carrying out the following works.

Carry out works in accordance to the paid items in the Bill of Quantities.

Carry out the following work at day work rates. Time sheets must be signed by the engineer.

Attend to the following matters in relation to your contract/work

Carry out the works as oral instructions received on site.

DESCRIPTION OF WORKS.

The contract/works completion date and price are / are not altered as a result of this instruction.

Instruction Insued By the Engineer Received by Contractor


Name: Name:
Date: Date:
Position: Position:
Signature: Signature:
APPENDIX

Quality and Cost Control Monitoring Sheets


DEOKE CONSULT
(CIVIL AND STRUCTURAL ENGINEERS)

PERMANENT EMBANKMENT: BOULDERS ACCUMULATION


Contract: CONSTRUCTION OF CONCRETE BRIDGE
Contract No:
Employer: DEPARTMENT OF URBAN ROADS
Engineer: DEOKE CONSULT
Contractor:
SECTION:
Ref.NO. :
NO. OF NO. OF QTY ACCUMULATION LENGTH PERCENTAGE
DATE
DAYS TRIPS (m3) TRIPS QTY COVERED (m) COMPLETED (%)

ISSUED BY THE SITE SUPERVISOR RECEIVED BY THE CONTRACTOR


Name: Name:
Signature: Signature:
Date: Date:
DEOKE CONSULT
(CIVIL AND STRUCTURAL ENGINEERS)

EQUIPMENT RECEIVED ON SITE


Contract: CONSTRUCTION OF CONCRETE BRIDGE
Contract No:
Employer: DEPARTMENT OF URBAN ROADS
Engineer: DEOKE CONSULT
Contractor:
SECTION:
Ref.NO. :
SERIAL LOCATION MOVEMENT
DATE EQUIPMENT NUMBER
NO. BRIDGE SITE CAMP BRIDGE SITE CAMP

ISSUED BY THE SITE SUPERVISOR RECEIVED BY THE CONTRACTOR


Name: Name:
Signature: Signature:
Date: Date:
DEOKE CONSULT LIMITED
(GEOTECHNICAL, STRUCTURAL, HIGHWAY, TRANSPORTATION, BRIDGES, WATER AND ENVIRONMENTAL ENGINEERS)

PILE DRIVING RECORD


Project Name : Construction of Bridge at Sekondi
Contract No. : DUR/GOG/SAEMA/MRR/2010/01
Employer : Department of Urban Roads
Contractor : China Railway Wuju (Group) Corporation
Consultant : Deoke Consult Ltd
Position Concrete Reinforcement Date
Pile No. Height Diameter
Eastern Northern Grade Slump Placing method Main Length Link Lapping Cover start Finish No.
EAST ABUTMENT

PIER

WEST ABUTMENT
DEOKE CONSULT
(CIVIL AND STRUCTURAL ENGINEERS)

HEIGHT OF PILE FOUNDATION


ABUTMENT A2
BENCH MARK 8.086
BENCH MARK READING 1.34
HOC 9.426

STATION LEVEL ACTUAL DEPTH OF LEVEL OF PILE PILE


READING,m LEVEL,m DRILL,m FOUNDATION,m DEPTH,m VOLUME,m3
P1 1.501 7.925 21 3.936 17.011 19.241
P2 1.515 7.911 21 3.936 17.025 19.257
P3 1.474 7.952 21 3.936 16.984 19.211
P4 1.487 7.939 21 3.936 16.997 19.226
P5 1.515 7.911 21 3.936 17.025 19.257
P6 1.441 7.985 21 3.936 16.951 19.174
P7 1.992 7.434 20.5 3.936 17.002 19.231
P8 2.044 7.382 20 3.936 16.554 18.725
TOTAL 135.549 153.322

ISSUED BY THE SITE SUPERVISOR RECEIVED BY THE CONTRACTOR


Name: Name:
Signature: Signature:
Date: Date:
DEOKE CONSULT
(CIVIL AND STRUCTURAL ENGINEERS)

HEIGHT OF PILE FOUNDATION


ABUTMENT A1
BENCH MARK 8.086
BENCH MARK READING 1.34
HOC 9.426

STATION LEVEL ACTUAL DEPTH OF LEVEL OF PILE PILE


READING,m LEVEL,m DRILL,m FOUNDATION,m DEPTH,m VOLUME,m3
P1 1.501 7.925 21 3.936 17.011 19.241
P2 1.515 7.911 21 3.936 17.025 19.257
P3 1.474 7.952 21 3.936 16.984 19.211
P4 1.487 7.939 21 3.936 16.997 19.226
P5 1.515 7.911 21 3.936 17.025 19.257
P6 1.441 7.985 21 3.936 16.951 19.174
P7 1.992 7.434 20.5 3.936 17.002 19.231
P8 2.044 7.382 20 3.936 16.554 18.725
TOTAL 135.549 153.322

ISSUED BY THE SITE SUPERVISOR RECEIVED BY THE CONTRACTOR


Name: Name:
Signature: Signature:
Date: Date:

DEOKE CONSULT
(CIVIL AND STRUCTURAL ENGINEERS)

HEIGHT OF PILE FOUNDATION


PIER
BENCH MARK 8.086
BENCH MARK READING 1.34
HOC 9.426

STATION LEVEL ACTUAL DEPTH OF LEVEL OF PILE PILE


READING,m LEVEL,m DRILL,m FOUNDATION,m DEPTH,m VOLUME,m3
P1 2.683 7.925 21 3.936 17.011 19.241
P2 2.763 7.911 21 3.936 17.025 19.257
P3 2.763 7.952 21 3.936 16.984 19.211
P4 1.487 7.939 21 3.936 16.997 19.226
P5 2.742 7.911 21 3.936 17.025 19.257
P6 2.893 7.985 21 3.936 16.951 19.174
P7 2.750 7.434 20.5 3.936 17.002 19.231
P8 2.440 7.382 20 3.936 16.554 18.725
TOTAL 135.549 153.322

ISSUED BY THE SITE SUPERVISOR RECEIVED BY THE CONTRACTOR


Name: Name:
Signature: Signature:
Date: Date:
DEOKE CONSULT
(CIVIL AND STRUCTURAL ENGINEERS)

HEIGHT OF PILE FOUNDATION


ABUTMENT A2
BENCH MARK 8.086
BENCH MARK READING 1.34
HOC 9.426

STATION LEVEL ACTUAL DEPTH OF LEVEL OF PILE PILE


READING,m LEVEL,m DRILL,m
FOUNDATION,m
DEPTH,m VOLUME,m3
P1 2.501 6.925 21 3.936 18.011 20.373
P2 2.515 6.911 21 3.936 18.025 20.388
P3 3.474 5.952 21 3.936 18.984 21.473
P4 2.487 6.939 21 3.936 17.997 20.357
P5 2.515 6.911 21 3.936 18.025 20.388
P6 2.441 6.985 21 3.936 17.951 20.305
P7 2.992 6.434 20.5 3.936 18.002 20.362
P8 3.044 6.382 20 3.936 17.554 19.856
TOTAL 144.549 163.502

TRACTOR ISSUED BY THE SITE SUPERVISOR RECEIVED BY THE CONTRACTOR


Name: Name:
Signature: Signature:
Date: Date:
TRACTOR
TRACTOR
Date for Testing Concrete Cubes
Testing Date
Position ID Number Type Date Cast Time
7 Days 28 Days