Professional Documents
Culture Documents
AE-514
AE-514
NOTES:
REMARKS:
· F.F.L - FINISHED FLOOR LEVEL.
FOR FINISHES REFER
13.0
PAINTED METAL CAP ·
·
T.O.S -
F.P.L -
TOP OF STRUCTURAL SLAB.
FINISHED PAVEMENT LEVEL.
TO FINISHING SCHEDULES · F.R.L - FINISHED ROAD LEVEL.
· T.O.P.R - TOP OF PARAPET.
PAINTED STEEL BALUSTRADE ·
·
F.C.P. -
T.O.W -
FINISHED CEILING LEVEL.
TOP OF WALL
AS PER SPECS.
GALVANIZED STEEL HANDLE
OR VARIES ACCORDING
ANCHORING SYSTEM AS PER
SUPPLIER AND SUBJECT TO STR.
TO ELEVATIONS
EXPANSION BOLTS
CALCULATIONS (FISHER) EVERY 500 mm
900
1100
SLOPED STUCCO PARAPET
1% TOSS
ROOFING
LAYERS
WATER INSULATION
PAINTED GALVANIZED STEEL
MEMBRANE SILL FLASHING
RAIL Ø 50MM
13.0
C FALL FOR FINISHING REFER TO C
13.0
FINISHING SCHEDULES
DISINFECTING & SANITIZER UNIT
PAINTED GALVANIZED STEEL W/ FLUSHING SPRAY HEAD
BRACKET FIXED PLASTER BEADS
TO THE WALL CONCRETE
PARAPET
REFER TO STR. ACCESS PANEL FOR
DWGS. MANUAL WASH DOWN
2200
PAINTED GALVANIZED STEEL WALL BRACKET PAINTED STEEL HANDRAIL
B1 1:2
B3 1:5
E ISSUED FOR CONSTRUCTION AUG. 2022
210
210
M NOR
AG TH
NE
PIPE RAIL Ø 40mm
TIC
N
B03
PAINTED STEEL
PIPE BALUSTRADE DN
DN
1210
1210
Ø 40mm
1000
1000
950
950
DISCHARGE FIRE
PAINTED STEEL SHUTTER DOOR PROJECT NAME:
PIPE BALUSTRADE
100
100
FFL. Ø 40mm
2000
ADMINISTRATION BUILDING (B03)
A1 1:10 FFL.
DUMPSTER
DESIGNER:
Bays Water Tower,Business Bay Office 1910
P.O.Box 57004 Dubai-UAE
Tel: +971(0)44516868
Fax: +971(0)44516969
E-mail: mail@whitespace.ae
(GRADE-304)
RAIL Ø 50mm SECTION A-A LANDSCAPE CONSULTANT:
Rabben/Herman design office
VERIFY
INTAKE DOOR -
PM-KSA: GASA PA: HLMH HV: SHMO LC: KMFM
950
TREAD FLUSHING GARBAGE PD: WSA ID: ----- PG: MMER CE: -----
HEAD CHUTE
OPENING PM: RHDO SE: MOHO HC: MFMT LS: -----
950
RISER
DOOR
TITLE:
REINFORCED CONCRETE
PLAN
STAIR REFER TO STR. DWGS. MISCELLANEOUS DETAILS
FOR STAIR FINISH REFER
TO FINISHING SCHEDULES
SCALE: SHEET NO.: SHEET REVISION:
STAINLESS STEEL WALL BRACKET FFL. GARBAGE CHUTE E00
A5 1:10
A6 1:2
A.I AE-514
REV. DATE:
25 AUG. 2022
220825
1 2 3