F _____

JOB TITLE / AIM: JSA for Radiography Testing in Del Fabrication area & process area also includes night works
JSA DATE: 15/06/06 JSA NO./ REVISION: 96
SUPERVISOR/ JSA LEADER: SCRIBE: Hernand Suyom
PARTICIPANTS :
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Approved:

Bruce Boxshall 21-June-06

Attach copies of any relevant documentation/ drawings.


Part 2: Job Safety Analysis
Job Steps:
1.Mobilization of Equipment & workers
2. Random preparation of test piece materials
3. Radiography Testing in day shift or night shift
4. Demobilization

Alternatives Considered: N/A

Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE,S : First aid kit must be present at the area and the Hse personnel is the first response in case of
emergency
Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices
that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.

File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 Mobilization of equipment as Unauthorised equipment/tools brought out to Before mobilizing any equipment/tools make sure
follows: site that the E &P Personnel & BHP got inspected the
- Radiation tags equipment. Checklist are in equipment
- Camera and film Ensure radiography certificate permit are in
- Barrication tape place prior to start the job obtained from operation
whenever working in process area. Ensure that
- Sign boards
gas testing was conducted whenever
bringing/conducting the testing in transition or
operations area
Work not performed in accordance with Procedure to be provided to BHPB and approved
approved procedure prior to commencing work
Unskilled and uninducted personnel starting Ensure that all personnel prior to start have been
the job inducted and oriented about the hazard in the job
site. All persons working in Operations areaa to
be Operaitons inducted.
Only trained and BHPB approved personnel
shall do the RT
Person to conduct radiography must have hiding
place/barrier enough not to gain radiation

Workers starting the job unfit to work All personnel must be undergone fitness for work
assessment thru DEL doctor
Workers starting the job without necessary JSA must be in place prior to work. Ensure all the
controls in place (eg JSA, Permits as required) persons take part in the toolbox meeting
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
discussion. Persons signed at the back of JSA at
each toolbox meeting.
All works undertaken in Operations areas to be
performed under HFHWP.
Hand Injury Ensure proper hauling of materials/get help if
required/Wear hand gloves.
Back injury Ensure proper posture and positioning
Miscommunication Ensure standby radio fully charge are in place at
all times
Ensure that area to be secured and barricaded
with radiography sign board Danger High
Radiation in place stating the maximum
distance 30 m range the radiation could reach.
Spotter to be in place at all times to prevent
unauthorised access to area,
2 Random preparation 10% of test Unauthorised person Ensure that all workers have been informed when
piece materials the radiography will be conducted and the
radiation range will be properly lit and barricaded
by a barrier.
Miscommunication
It is advised that the testing to be conducted at
night or break time hours to minimized the
SIMOPS or personnel interface
Trips/fallls
Ensure that workers shall not step of the pipe
walking across the pipe
Ensure workers are following the correct
Poor visibility/lighting procedure of positioning and lifting. Get help if
required.
Ensure sufficient light are in place.
Ensure that workers are oriented about the job and
Heat Stress/Exhaustion no one will be allowed to work alone. Make
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
buddy system
Ensure potable water/sufficient shelter is available
Snake bite each area where workers are doing the job. First
aid kit available at site.

Tripping hazards Workers will inform and be aware about the


presence at the area. No killing of snakes
SIMOPS
Ensure that workers accessing the right walkway
and watch your steps.
Other worker not involve in the job must not
come closer to the area
Strong wind conditions Ensure no works shall perform when strong wind
comes
Ensure that whenever heavy equipment on the
area no works shall commence at excavated area
3. Radiography Testing Radiation Ensure that the equipment was inspected by BHP
and calibrated prior to use.
Ensure that QC conducting the testing are wearing
Full PPE and a standby barrier to secure
themselves to exposure to radiation

Ensure that no any person will be on the


radiography area. Double check will be conducted
and siren will be activated as notice that the
radiography will be commence
Ensure sufficient man power will be designated
as watchman to ensure nobody will enter the
radiation zone
Miscommunication Ensure that workers performing the testing are
trained.
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
Unauthorized operator should not operate the
tester
Always refer to manufacturers methodology of
testing
Tripping hazards Ensure that during holiday testing no other
workers touching the carbon steel pipe
Ensure that earth grounding is in place prior to
testing.
Ensure that the Holiday Tester will be off
immediately after detected some defects identified
or before removal of the ring.
Ensure that gas testing was conducted whenever
working in transition zone area
Ensure that workers will not step on the carbon
pipe
Strong wind conditions Whenever strong wind comes the work must be
stop
4. Demobilization Same as item one Same as item one