FINANCE DIVISION
Sl.
No
Name, Location & Status of the Scheme
Estimated Cost
Total
Foreign
Loan
3
4
(Million Rupees)
Expenditure
ThrowAllocation for 2011-12
upto June forward as on Foreign Loan
Rupee
Total
01-07-11
2011
5
6
7
8
9
On-going Schemes
1
Financial Monitoring & Evaluation of
Drought Recovery Assistance Program
Project (DRAPP/DERA-II) Islamabad
427.585
0.000
276.282
151.303
0.000
10.000
10.000
Project for Improvement of Financial
Reporting & Auditing (PIFRA). (Phase-II),
Islamabad. (IDA/World Bank Credit)
9602.196
8466.830
5917.777
3684.419
1111.576
150.000
1261.576
Automation Project of CDNS
398.650
0.000
233.047
165.603
0.000
165.603
165.603
Purchase of Land for Construction of
Federal Audit Complex, Islamabad
12.506
0.000
7.000
5.506
0.000
5.506
5.506
Project Monitoring and Evaluation Cell
Implementation Unit
41.006
0.000
21.217
19.789
0.000
10.000
10.000
Institutional Strengthening of Finance
Division
171.076
0.000
12.340
158.736
0.000
30.000
30.000
Competitiveness Support Fund (CSF)
(USAID)
1298.000
703.000
667.140
630.860
25.677
16.000
41.677
Expansion of Raw Water Filtration Plant &
Supply Network for Supplying Clean
Water to Hyderabad (Hyderabad Package)
935.000
0.000
528.044
406.956
0.000
100.000
100.000
Construction of Eastern and Expansion of
Southern Sewerage Treatment Plants
(Hyderabad Package)
915.300
0.000
359.150
556.150
0.000
100.000
100.000
10
Construction of Various Roads in District
Tando Allahyar (Hyderabad Package)
426.000
0.000
273.466
152.534
0.000
100.000
100.000
11
Construction of Various Roads/C.C Streets
in District Matiari (Hyderabad Package)
259.258
0.000
100.000
159.258
0.000
50.000
50.000
12
Construction of Various Roads/ C.C
Streets in District Tando Muhammad Khan
(Hyderabad Package)
312.002
0.000
225.000
87.002
0.000
60.000
60.000
13
Construction /Improvement of Roads in
Hyderabad District (Urban) (Hyderabad
Package)
484.894
0.000
31.544
453.350
0.000
100.000
100.000
14
Construction /Improvement of various
Roads in Taluka Hyderabad District
(Rural) (Hyderabad Package)
209.024
0.000
18.000
191.024
0.000
60.000
60.000
15
Water Supply & Drainage Scheme of
Tando Jam (Hyderabad Package)
118.900
0.000
14.397
104.503
0.000
30.000
30.000
16
Construction / Replacement of New &
Existing Water Supply Line (Lyari Dev.
Package)
370.41
0.000
283.726
86.684
0.000
86.684
86.684
17
Construction / Replacement of New &
Existing Sewerage System (Lyari Dev
Package)
367.002
0.000
281.851
85.151
0.000
85.151
85.151
18
Construction of Black Top Road from Doli
Check Post to Sighari Road 109 Bashha
Pur Linking Kandh Kot and Jani Bari Road
238 District Dera Bugti (Dera Bugti
Package)
281.833
0.000
152.799
129.034
0.000
80.000
80.000
19
Construction of BB/T Road from Sui to
Uch Field (57 km) (Dera Bugti Package)
797.710
0.000
246.933
550.777
0.000
200.000
200.000
Page 22
FINANCE DIVISION
Sl.
No
Name, Location & Status of the Scheme
20
Const. of Sibi Rakhni Road via Maiwand
(Tall - Kohlu) Section km 24 - 164) (Kohlu
Package)
21
Estimated Cost
Total
Foreign
Loan
3
4
(Million Rupees)
Allocation for 2011-12
Expenditure
Throwupto June forward as on Foreign Loan
Rupee
Total
01-07-11
2011
5
6
7
8
9
5132.000
0.000
2006.173
3125.827
0.000
600.000
600.000
Construction of 132 KV Grid Station at
Kohlu (Kohlu Package)
330.430
0.000
237.040
93.390
0.000
35.000
35.000
22
Construction of Bye-Pass Road at Kohlu
(Kohlu Package)
197.860
0.000
124.693
73.167
0.000
20.000
20.000
23
Construction of Various B/T Road to link
Different Villages with Main Kohlu Town
(Kohlu Package)
222.245
0.000
120.578
101.667
0.000
20.000
20.000
24
Installation 11 KV Tamboo Feeder to Mast
Tawakli in Kohlu District (Kohlu Package)
10.000
0.000
5.000
5.000
0.000
5.000
5.000
25
Southern Bypass (Southern Punjab)
1569.320
0.000
730.000
839.320
0.000
130.000
130.000
26
10 Sewerage Schemes by WASA
(Southern Punjab)
2817.000
0.000
1075.726
1741.274
0.000
250.000
250.000
27
6 Sewerage Schemes by WASA (Southern
Punjab)
2534.000
0.000
500.622
2033.378
0.000
500.000
500.000
28
Construction of Northern Bypass (Phase-I)
Southern Punjab
653.000
0.000
353.000
300.000
0.000
100.000
100.000
29
Beautification of Qilla Kohna Qasim Bagh,
Multan
212.197
0.000
30.000
182.197
0.000
30.000
30.000
30
Preservation and Restoration of Shrine
and Mosque of Musa Pak Shaheed at
Multan
15.540
0.000
1.825
13.715
0.000
13.715
13.715
31
Urban Water Supply Scheme,
Benazirabad
1565.000
0.000
268.710
1296.290
0.000
200.000
200.000
32
Urban Drainage Scheme, Benazirabad
172.807
0.000
96.644
76.163
0.000
35.000
35.000
33
Construction of Road from Rajwah
Regulator Inspection Path of Mor Shakh to
Village Mian Usman and Connect Machi
Mori Road and KAK Sector, Badin
126.000
0.000
10.000
116.000
0.000
60.000
60.000
34
Construction of Road from Pangrio Sugar
Mill to Village Kabir Rind to Tando Bago
Pangrio Road Mile, Badin
80.000
0.000
10.000
70.000
0.000
70.000
70.000
35
Construction of Flyover at Sariab Phatak,
Quetta
1414.451
0.000
836.555
577.896
0.000
577.896
577.896
36
Construction of flyover at Koyala Phattak,
Samangli Road, Quetta
1025.923
0.000
736.555
289.368
0.000
289.368
289.368
37
Construction of various Roads
Naseerabad, Balochistan
500.414
0.000
238.404
262.010
0.000
217.311
217.311
38
Creation of new processing facilities (for
handling and purification of Coal Gas
produced by underground coal
gasification)
490.480
79.700
243.942
246.538
0.000
246.538
246.538
39
Creation of new processing facilities (for
production of Coal Gas by underground
coal gasification)
494.450
191.000
259.883
234.567
0.000
234.567
234.567
40
Capacity Building of Teachers Training
Institutions & Training of Elementary
Schools Teachers in Punjab
3137.752
0.000
1613.886
1523.866
0.000
705.090
705.090
Page 23
FINANCE DIVISION
Sl.
No
Name, Location & Status of the Scheme
Estimated Cost
Total
Foreign
Loan
3
4
(Million Rupees)
Allocation for 2011-12
Expenditure
Throwupto June forward as on Foreign Loan
Rupee
Total
01-07-11
2011
5
6
7
8
9
41
Capacity Building of Teachers Training
Institutions & Training of Elementary
Schools Teachers in Sindh
1261.773
0.000
739.794
521.979
0.000
351.871
351.871
42
Capacity Building of Teachers Training
Institutions & Training of Elementary
Schools Teachers in Khyber Pakhtunkhwa
1035.319
0.000
663.240
372.079
0.000
260.590
260.590
43
Capacity Building of Teachers Training
Institutions & Training of Elementary
Schools Teachers in Balochistan
588.407
0.000
386.292
202.115
0.000
181.842
181.842
44
Metalling of Road Linking Chitral and
Gilgit (Improvement / B.T of Booni-Mastooj
Shandoor Road, District Chitral)
491.224
0.000
266.155
225.069
0.000
150.000
150.000
45
Widening and Carpeting of Booni-Buzand
Torkhow Road Chitral
279.922
0.000
121.462
158.460
0.000
100.000
100.000
46
Shaheed Benazir Bhutto Mother & Child
Health Care Centre, Nawabshah city (300
Bedded Hospital)
1215.132
0.000
313.286
901.846
0.000
200.000
200.000
47
Re-Development of Dargah Lal Shahbaz
Qalandar (Phase-III)
142.225
0.000
61.473
80.752
0.000
80.752
80.752
48
Construction of Road - Doreji / Deh Tiko
Baran, Road Via Gainpur Lak, District
Jamshoro, Sindh
154.000
0.000
126.759
27.241
0.000
27.241
27.241
49
Up-gradation of Cancer Treatment Facility
at Nishter Hospital (Southern Punjab)
680.788
0.000
200.000
480.788
0.000
265.864
265.864
45978.011
9440.530
22027.410
23950.601
1137.253
7396.589
8533.842
Total (On-going)
New Schemes
50
Special Repair of Accountant General,
Khyber Pakhtunkhwa Peshawar Building
Peshawar
23.930
0.000
0.000
23.930
0.000
5.334
5.334
51
Construction of Additional Block for District
Account Officer, Peshawar
59.880
0.000
0.000
59.880
0.000
22.560
22.560
52
Provision of 2 Nos. Lifts in A-Block, at AG
Office, Peshawar
9.975
0.000
0.000
9.975
0.000
9.975
9.975
53
Improvement of Sui-Dera Bugti Road and
Construction of Black Top Linked Road at
Dera Bugti (Dera Bugti Package
641.862
0.000
0.000
641.862
0.000
120.000
120.000
54
Improvement / Widening of Sui Dera Bugti
Town (Dera Bugti Package)
104.492
0.000
0.000
104.492
0.000
40.000
40.000
55
Construction of B/T Road from Lehri to
Sangsila Road Phase-I (Dera Bugti
Package)
593.040
0.000
0.000
593.040
0.000
160.000
160.000
56
Construction of Black Topped from Dera
Bugti to Pitokh, Habin Rahi, Vedara Killi
Mured, Dera Bugti (Dera Bugto Package)
335.690
0.000
0.000
335.690
0.000
5.000
5.000
57
Water Supply Scheme for Kohlu (Kohlu
Package)
67.584
0.000
0.000
67.584
0.000
12.000
12.000
58
Construction of Circuit House at Kohlu
(Kohlu Package)
56.540
0.000
0.000
56.540
0.000
16.000
16.000
Page 24
FINANCE DIVISION
Sl.
No
Name, Location & Status of the Scheme
Estimated Cost
Total
Foreign
Loan
3
4
(Million Rupees)
Allocation for 2011-12
Expenditure
Throwupto June forward as on Foreign Loan
Rupee
Total
01-07-11
2011
5
6
7
8
9
59
Construction of Officers Club, Kohlu
(Kohlu Package)
50.891
0.000
0.000
50.891
0.000
12.000
12.000
60
Construction of Residential
Accommodation (Colony) for District
Officers / Officials at Kohlu (Kohlu
Package)
66.895
0.000
0.000
66.895
0.000
16.000
16.000
61
Kanj Irrigation Scheme at District Kohlu
(Maiwand) (Kohlu Package)
16.434
0.000
0.000
16.434
0.000
4.116
4.116
62
Electrification of Villages in Kohlu (Kohlu
Package)
79.587
0.000
0.000
79.587
0.000
4.116
4.116
63
Construction of Northern Bypass from
Qasim Bela to Shersha Road, Multan
Bypass at Multan including Grade
Separated Elevated Bridge over Railway
Line at N-70 (12.229 km) (Phase-II)
2600.000
0.000
0.000
2600.000
0.000
50.000
50.000
64
Up-gradation of Road Infrastructure in
Multan City (Phase-II)
500.000
0.000
0.000
500.000
0.000
50.000
50.000
65
Reconstruction & Rehabilitation of Bibi
Pak Daman
270.000
0.000
0.000
270.000
0.000
150.000
150.000
66
Larkana Sewerage Project
1000.000
0.000
0.000
1000.000
0.000
35.000
35.000
67
2 x 50 MW Power Plant from Syngas
(IGCC - 2009) Tharparkar
8898.700
5847.300
0.000
8898.700
0.000
5.000
5.000
68
Shaheed Benazir Bhutto Hospital
Peshawar
2000.000
0.000
0.000
2000.000
0.000
200.000
200.000
69
Khyber Institute of Child Health & Children
Hospital
1700.000
0.000
0.000
1700.000
0.000
200.000
200.000
70
Medical equipment / ambulances for
DHQs in Khyber Pakhtun Khwa
2000.000
0.000
0.000
2000.000
0.000
200.000
200.000
71
Burns and Trauma Centre Peshawar
200.000
0.000
0.000
200.000
0.000
200.000
200.000
72
Faseel Resettlement Project
120.000
0.000
0.000
120.000
0.000
120.000
120.000
73
Nowshehra Nizampur Kohat Alternate
Road Link
2700.000
0.000
0.000
2700.000
0.000
200.000
200.000
Total (New)
24095.500
5847.300
0.000
24095.500
0.000
1837.101
1837.101
Total (Finance)
70073.511
15287.830
22027.410
48046.101
1137.253
9233.690
10370.943
Page 25