BOQ FOR RENOVATION OF A BUNGALOW TO A HIDDEN ROOF MANSONATE

NO. DESCRIPTION QTY. UNIT RATE AMOUNT


1.0 DEMORISHING OF THE EXISTING ROOF
Demorish the existing roof guided by the contractor SUM 7,600
All materials arising from demolitions shall be the property of the Client.

1.1 FORMWORK
a) 3 by 4 189 FT 15 2,835
b) 6 by 2 80 FT 10 800
c) Nails 15 KG 300 4,500
d) support poles (miti) 50 PIECES 7 350
total formwork cost
1.2 ECO SLAB
a) Beam 267.3 SM 520 138,996
b) Block 920 SM 90 82,800
c) BRC Mesh 2 Rolls SM 35,000 70,000
total eco slab cost

1.3 WALLING
a) 150 mm guage machine cut stone 6 by 9 1200 PIECES 25
b) sand 36 TONNE 34,000 1,224,000
c) Cement 77 BAG 820 63140
d) Hoop Iron 3 KG 3500 10500
total walling cost

1.4 STAIRS, COLUMNS AND BEAMS


REIFORCEMENT
a) 12 mm diamitre steel 200 KG 150 30,000
b) 10 mm diametre steel 110 KG 140 15,400
c) binding wire 1 ROLL KG 3500 3500
d) Concrete mix class (20/20) for colums, stairs and slub 114.2 SM 12,750 1,453,500.00
total stairs, columns and beams cost

1.5 FINISHING
Floor Finishes SM
Screed;cement and sand 1:3 with approved integral dust proofing additive
wood floated
32m Thick to receive ceramic floor tile
Ceramic Tiles
Non-slip ceramic tiles 600 x 600 x 8mm Thick from 120 SM 3,500 420,000
approved supplier,fixed with sealmaster 101 or equal and approved tile
adhesive,pointed and jointed in sealmaster 201 grout,allow for spacers
Wall Finishes 60 SM 500 30,000
Plaster 9mm first coat of cement,lime putt y and sand {1:2:9};4mm second
coat of cement lime putty and sand {1:1:6};steel trowelled

TO COLLECTION 3,557,921
BOQ FOR RENOVATION OF A BUNGALOW TO A HIDDEN ROOF MANSONATE

NO. DESCRIPTION QTY. UNIT RATE AMOUNT


1.6 Painting & Decoration

Rub down existing intergral concrete/masonry wall finishes, apply a 60 SM 500 30,000
scheming coat and prepare and apply 3 coats of emulsion paint on internal
wall surfaces
Prepare and roller apply three coats of equal and approved 1st
quality smooth paint

1.7 DOORS
INTERIOR DOOR
Wrot cypress
50mm thick single leaf panel door size 820x2100mm 2 KG 12,000 24,000
high (D1- External Door)
50mm thick single leaf flash door size 820x2100mm 8 KG 4,000 32,000
high (D2- Internal Door
Door frames and finishings
Wrot mahogany
200x50mm rebated frame 70 LM 500 3500
50x25mm architrave 70 LM 120 8400
15mm quadrant 70 LM 120 8400
Ironmongery
Supply the following items of ironmongery with
matching screw stall as ''union'' or any other equal
and approved:-
a) 100mm pressed steel butt hinges 30 PIECES 200 6000
b) Three lever mortice lock complete with set of lever 10 NO 4,000 40,000
handles with brass finish

1.8 WINDOWS
Supply and fix the steel casement windows including burlar
proofing grilles and including heavy duty closers and stay,
fixing lugs and onecoat grey oxide primer as per Architects details
a) Window size 1500 x 1200 mm High 8 NO 8000 64,000
b) Ditto 600 x 500mm high 4 NO 4,000 16,000
c) steel grilles fixed vertically to approval size 1200 x 600mm high 7 NO 6000 42,000
Glazing :-
4 mm thick clear sheet glass fixed to metal frames with putty :-
Panes 0.1 - 0.5 square metres 12 SM 800 9,600
Prepare and apply three coats oil paint to :
Metal surfaces SUM 700

TO COLLECTION 284,600
BOQ FOR RENOVATION OF A BUNGALOW TO A HIDDEN ROOF MANSONATE

NO. DESCRIPTION QTY. UNIT RATE AMOUNT


1.9 MECHANICAL WORKS
a) SHOWER FITTINGS 4 8,000 32,000
Shower fitting consisting of concealed shower riser
pipes to a 75mm diameter swivel/ adjustable shower
rose, stop corks and other necessary fittings and
accessories.
b) INSTATENIOUS SHOWER HEATER 4 7,500 30,000
Instant electric shower head heater with embedded rod
type sheathed element. Electrically insulated with
electronic temperature control complete with wide rose
and overflow to withstand a working pressure of upto
400kpa. It shall have a heating capacity of about 5.5kw
and complete with extension shower arm and 4mm2
electric supply cable to neon lit DP switch, all to be as
"Lorenzetti" or equal and approved

2.0 ELECTRIC INSTALLATION WORK


Allow for electrical appliancies fittings and installation SUM 30,000
inclision of the Electic work labour

TOTAL MATERIAL COST

a) Demorishing SUM 7,600


b) Walling,Formwork and Concreting SUM 40,000
c) Finishing SUM 30,000
TOTAL LABOUR COST 77,600.00

TOTAL COLLECTION 92,000


GRAND TOTAL 4,012,121.00