St. Johns County Road Projects
St. Johns County Road Projects
St. Johns County Road Projects
JOHNS COUNTY
(as of 12/15/2011) Projects Under Construction Interstate 95 Replacing 10 high mast light poles at State Road 16 interchange. American Lighting and Signalization Inc., of Jacksonville started November 14, 2011 and should finish in 90 days (early 2012) at a cost of $607,551.35. Webert Lovencin/project manager. (2135052) State Road A1A Replacing two low level bridges over the Matanzas River in Summer Haven just north of the Flagler County line. Misener Marine Construction, Inc., of Tampa began September 9, 2009 and should finish in 948 days (Early 2012) at a cost of $11,756,527.75. Jeff Williams/project manager. (2104273, 4) State Road A1A Building retaining wall one mile north of the Flagler County line to Summer Haven. Hal Jones Contractor, Inc., of Jacksonville began March 21, 2011 and should finish in 380 days (Summer of 2012) at a cost of $2,566.138.42. Donny DeVenny/project manager. (2102341) State Road 207 Building a multi-use trail from Armstrong Road to end of the existing trail. Superior Construction Company of Jacksonville began September 6, 2011 and should finish in180 days (Spring of 2012) at a cost of $1,274,040.17 Donnie DeVenny/project manager. (2102865) State Road 312 Modifying intersection by offsetting left turn lanes with Sgt. Tutten Drive (formerly Whetstone Drive) and installing new traffic signals at Harbour Drive/Plantation Island Drive including a flashing yellow signal. Petticoat-Schmitt Civil Contractors, Inc., of Jacksonville began November 29, 2011 and should finish in 89 days (early 2012) at a cost of $738,097.56. Steve Spittle/project manager. (4247281, 2103946) U.S. 1 Replacing bridge over the San Sebastian River. Archer Western Contractors of Jacksonville and GAI began July 2011 and should finish in 665 days (Spring of 2013) at a cost of $13,520,000. This is a design-build project. Bruce Boyles of Eisman & Russo is CEI project manager (904-824-5035). Jeff Williams/FDOT project manager. (2104482) Projects in Five-Year Work Program Interstate 95 Improvements at County Road 210 interchange in 2013/14 at estimated cost of $3 million. (4243072) Interstate 95 Landscape the US 1 and County Road 210 interchanges. Bids to open in January 2013 at estimated cost of $1.3 million. Fae Ross/project designer. (4287581) Interstate 95 Add lighting at the US 1 interchange. Bids to open in May 2013 at estimated cost of $872,000. Travis Humphries/project designer.
King Street (State Road 5A) Drainage improvements from Malaga Street to Markland Place (.2 mile). Bids to open December 14, 2011 at estimated cost of $2 million. Chris Dicks/project designer. (4247862) King Street (State Road 5A) Traffic signal update from US 1 to State Road A1A (.2 mile) in 2013/14 at estimated cost of $280,000. (4300691) May Street (State Road A1A) Drainage improvements from San Marco to Magnolia Avenue (.3 mile) in 2015/16 at estimated cost of $1.1 million. (2104524) State Road A1A Build sidewalk from Corona Road to Solana Road (.8 mile). Bids to open in October 2012 at estimated cost of $345,000. Jeff Bailey/project designer. (4273311) State Road A1A Resurface from County Road 203 to beginning of the four-lane (2.4 miles). Bids to open in December 2012 at estimated cost of $1.6 million. Ryan Asmus/project designer. (4234251) State Road A1A Update traffic signals from Dondaville Road to State Road 312 (3.5 miles) in 2012/13 at estimated cost of $440,000. (4300661) State Road 13 Replace and widen the bridge culvert over Wards Creek and add a southbound left turn lane onto State Road 16 and a right turn lane on State Road 16 to northbound State Road 13. Bids to open in October 2013 at estimated cost of $2.8 million. Public information meeting scheduled for August 11, 2011 at Trout Creek Park Pavilion. Eric Shimer/project designer. (4244541) State Road 16 Landscape from County Road 16A to International Golf Parkway (1.5 miles). Bids to open December 14, 2011 at an estimated cost of $140,000. This is a design/build project. Fae Ross/project designer. (4287591) State Road 16 Resurface from Green Acres Road to San Marco Avenue (State Road 5A) (3 miles). Bids to open in July 2012 at estimated cost of $5 million. John Thrasher/project designer. (4244811) State Road 206 (Crescent Beach Bridge) Replace the motors that operate the bridge raising mechanism and replace the control console inside the bridgetenders house. Bids to open in May 2012 at an estimated cost of $3 million. John Thrasher/project designer. (2104582) State Road 207 Build a multi-use trail from Spuds to Armstrong Road (2.3 miles). Bids were opened December 7, 2011 and the apparent low bidder was Superior Construction Company of Jacksonville with a bid of $544,169.17. Amy Williams/project designer. (2102867) State Road 312 Repaint the eastbound bridge over the Matanzas River. Bids to open December 14, 2011 at estimated cost of $2.3 million. John Thrasher/project designer. (2102524)
Recently Completed Projects (within the past year) County Road 13 Replaced bridge over Sixteen Mile Creek. Superior Construction Company of Jacksonville began January 4, 2010 and finished December 15, 2011 at a cost of $5,049,379.78. (2123821) County Road 13B (Fruit Cove Road) Resurfaced from State Road 13 South to State Road 13 North (2.3 miles). Duval Asphalt Products of Jacksonville and Eisman/Russo began December 6, 2010 and finished March 10, 2011 at a cost of $940,930. This is a federal economic stimulus project. (4283091) County Road 214 Replaced bridge railing over Interstate 95. Safety Contractors Inc., of Jacksonville began with the design build project August 6, 2010 and finished with the construction on January 21, 2011 at a cost of $123,500. This is a federal economic stimulus project. (4283061) King Street (State Road 5A) Drainage improvements from U.S. 1 to Malaga Street. Masci General Contractors Inc. of Port Orange began January 10, 2011 and finished May 5, 2011 at a cost of $576,918.09. (4247861) Pablo Road Replaced the bridge over the Ponte Vedra Canal. OTAK Group, Inc., of Yulee began June 1, 2010 and finished May 4, 2011 at a cost of $787,536.38. (2123674) State Road A1A (Bridge of Lions) Rehabilitation of the bridge over the Intracoastal Waterway. Skanska USA Civil Southeast, Inc., of Virginia Beach, Virginia began Feb. 14, 2005 and finished Jan. 11, 2011 at a cost of $82,781,545.97. The rehabilitated bridge was reopened to traffic on March 17, 2010. (2102551) State Road A1A Landscaped, provided irrigation and lighting on both sides of the Bridge of Lions in St. Augustine. Sun State Nursery & Landscaping, Inc., of Jacksonville began February 10, 2011 and finished August 5, 2011 at a cost of $339,211.76. (2102556) State Road 13 Added sidewalk from Greenbriar Road to Remington Forest Drive (.5 mile) for students walking to and from Switzerland Point Middle School. L-J Construction Company of Central Florida of Polk City/Neel-Schaffer, Inc., began January 31, 2011 and finished March 21, 2011 at a cost of $214,375. This is a Safe Routes to School project. (4273181) State Road 206 (Crescent Beach Bridge) Repainted bridge over the Matanzas River Intracoastal Waterway. Coastal Marine Construction Inc., began February 8, 2010 and finished March 18, 2011 at a cost of $927,109.95. (2104583) State Road 207 Improved intersection with State Road 312. P & S Paving, Inc., of Daytona Beach began January 30, 2011 and finished June 2, 2011 at a cost of $853,779.45. This is a federal economic stimulus project. (4283021)
Projects Under Consideration Interstate 95 Design to add lanes from International Golf Parkway to the Duval County line (8.6 miles) is underway. Construction is not funded. (4240264) River Crossing Project development and environmental study to connect Branan Field Chaffee Road (State Road 23) to the proposed I-95/State Road 9B interchange that will cross the St. Johns River at the Shands Bridge is underway. See web page: www.sjrbridge.com. Public information meetings held November 1, 2005 in St. Johns County and November 3, 2005 in Clay County. Public hearings held February 22, 2010 in St. Augustine, February 25, 2010 in Orange Park, March 2, 2010 in Green Cove Springs and March 4, 2010 in Jacksonville. Brandi Vittur/project manager. (2082253) State Road A1A Add lanes from Mickler Road to beginning of the four-lane (1.9 miles) at estimated cost of $16.5 million. Construction is unfunded. Leigh Ann Bennett/project designer. (2104082) State Road 5A, State Road A1A and US 1 Study to determine improvements from the Bridge of Lions to Charlotte Street begins in 2011/12. (4282712) State Road 313 (formerly State Road 312 Extension) Build new roadway from State Road 207 to State Road 16 (9.3 miles) at estimated cost of $65 million. Construction is not funded. Leigh Ann Bennett/project designer. (2102302) US 1 Add interchange at County Road 210 at estimated cost of $40 million.. Construction is not funded. Nelson Bedenbaugh/Renee Brinkley/project designers. (2104207)