ROOF CONSTRUCTION

Pre-painted iron ridge to match


G28 Pre-painted iron roofing sheets Pitch 25°
on 50x100mm timber purlins
on 50x100mm timber rafters, ties & struts
on 2Nos. 50x150mm tie beam on
100x75mm wall plate

2000
+ 3.200 + 3.200

+ 2.600 A + 2.600
+ 2.400 + 2.400
B B
B

100X100X3 SHS POST @3410MM c/c


3150

1300
rear window level front window level
+0.900 +0.900

200mm thickGround 25x100mm skirting in

1000
Beam Mix 1:2:3, A 1:3 cement sand mix
reinforced concrete ±0.000 FLOOR Wheel chair ramp
-0.100 with far slope
-0.200
G.L= -0.350

SECTION X-X
Scale 1:75

A B FLOOR FOOTING
230mm thick masonry wall Reinforced concrete Ring Beam 25mm cement sand screed (mix 1:3) 230x630xL concrete strip
plastered internally and size 200x200mm in grade 20 on 100mm thick oversite concrete foundation (mix 1:3:6) to recieve
rendered externally with c/m concrete compacted with poker (mix 1:3:6) on 230mm thick well 200mm thick reinforced ground
1:4 trowelled smooth to vibrator compacted and blinded hardcore on beam to recieve
recieve approved paint well rammed murram base 230mm thick plinth walls.
Foundation depth to be determined
on site

SCALE:
REVIEWED: EMPLOYER: PROJECT: NATIONAL EDUCATION INFRASTRUCTURE NOTES 1:100
CONSTRUCTION ENGINEER: WORLD VISION UGANDA DEVELOPMENT PLAN DRAWN BY:
A.S
CHECKED BY:
D.E.
WORLD VISION - UGANDA DESCRIPTION:
REVISED BY:
AUG 2023
& 3 CLASSROOM BLOCK WITH OFFICE World Vision - Uganda
JOB No. : DRWG. No.
THE COMMUNITY GEN/H1B/A1

GSPublisherVersion 0.28.100.100