Job No : 53-007-01 Project Name : CABDE Location : Anyes, West Java, Indonesia

12.5.2 Piping Fabrication & Erection Schedule for Process Area Year
Line No

As of 2011
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

2012
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May

2013
Jun Jul Aug Sep Oct Nov
Line No

Month PJ Month Const. Month


Internal Piping Study Plot Plan Material Specification Piping Bill of Material Take-Off Engineering

1 2 3 4 5 6 7 8 9 10 11 12 13 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Area Costruction MILESTONE Procument

1 2
AFC(4/15)

AFC(9/30)

3 4

1st(3/31) 80%
Isometric Drawings Model Review

2nd(07/31) 90%

3rd(11/30) 100%

5 6 7

30%(4/3-4/14)
Piping Material P/O

60%(8/14-11/11)

90%(11/1/06-01/30/07)
1st Delivery (9/31)60%

Final(1/15) 100%
2nd Delivery (2/28)100%

Plant Completion By Samsung 1st M/C

8 9 10 11 12 13

Piping Material Delivery on Site M/C I Pile FDN & PC for Pipe Rack (R1001-2,101-4,201-2,301-2,401-4) Foundation for RC Structure(S-101-2,201-4,301-306,401-2) PC Rack Erection (R1001-2,101-4,201-2,301-2,401-4) FDN & Structure for Shelter (H101,201-2,301-2) STL/STR for Pipe Rack (R1001-2,101-4,201-2,301-2,401-4) STL/STR for Equip. STR (S-101-2,201-4,301-306,401-2) STL/STR for Shelter (H101,201-2,301-2) Erection for Column Erection for Vessel Erection for Pumps Erection for Heat Exchanger(TEMA) Erection for Compressor Erection for Tank

1st(4/15) 80%

2nd(08/10) 90%

2nd M/C

FDN & PC for Pipe Rack (R1001-2,101-4,201-2,301-2,401-4) Foundation for RC Structure(S-101-2,201-4,301-306,401-2) PC Rack Erection (R1001-2,101-4,201-2,301-2,401-4) FDN & Structure for Shelter (H101,201-2,301-2) STL/STR for Pipe Rack (R1001-2,101-4,201-2,301-2,401-4) STL/STR for Equip. STR (S-101-2,201-4,301-306,401-2) STL/STR for Shelter (H101,201-2,301-2) Erection for Column Erection for Vessel Erection for Pumps Erection for Heat Exchanger(TEMA) Erection for Compressor Erection for Tank

3rd M/C

16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Activity

Area No.

Work Volume

Start-Finish

Dur.

31 32

111

FIELD SHOP FIELD SHOP FIELD SHOP FIELD SHOP FIELD SHOP Field Erection Total FIELD SHOP FIELD SHOP FIELD SHOP FIELD SHOP FIELD SHOP Field Erection Total FIELD SHOP FIELD SHOP FIELD M M Shop FabricationTotal M M Shop FabricationTotal

33 Area (110) ISO DWG ISSUE SCH. 35


Common P/R : P/R,Tank,Tower: 3" & Above : 3" & Under

112

33

34

113

34

114

35

36

115

36

37 38 121

37 38

39 Area (120) ISO DWG ISSUE SCH. 41


Common P/R : P/R,Reactor: 3" & Above : 3" & Under

122

39

40

123

40

124

41

42

125

42

43 44 131

43 44

45 Area (130) Piping Erection


ISO DWG ISSUE SCH. Common P/R : P/R, Tower: 3" & Above : 3" & Under :

132

45

46

133 SHOP 134 FIELD SHOP FIELD SHOP Field Erection Total FIELD SHOP FIELD SHOP FIELD SHOP Field Erection Total FIELD SHOP FIELD SHOP FIELD SHOP Field Erection Total FIELD SHOP FIELD SHOP FIELD SHOP Field Erection Total #REF! #REF! #REF! #REF! #REF! #REF! M M M Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov M M M M Shop FabricationTotal Field Erection Total Shop Fabrication Total Field & Shop Total M M Shop FabricationTotal 161 M M Shop FabricationTotal 151 M M Shop FabricationTotal 141

46

47

47

48

135

48

49 50 Area (140)
ISO DWG ISSUE SCH. P/R Tank : 3" & Above : 3" & Under :

49 50

51

142

51

52

143

52

53 50 Area (150)
ISO DWG ISSUE SCH. P/R Tank : 3" & Above : 3" & Under :

53 50

51

152

51

52

153

52

53 50 Area (160)
ISO DWG ISSUE SCH. P/R Tank : 3" & Above : 3" & Under :

53 50

51

162

51

52

163

52

53 57

53 57

85 86 87

Field Direct Manpower (Dia-Inch / 1.42 / 26) Shop Direct Manpower (Dia-Inch / 3.85 / 26) Total Manpower

85 86

0
Dec

0
Jan

0
Feb

0
Mar

0
Apr

0
May

0
Jun

0
Jul

0
Aug

0
Sep

0
Oct

0
Nov

0
Dec

0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov

87
Line No

Year
Month PJ Month Const. Month

* Schedule is based on 30.Apr. 2006 * B/Q is based on 21.Apr.2011(Prepared by piping team)