12 5 2 Schedule of Fab Ere
12 5 2 Schedule of Fab Ere
12 5 2 Schedule of Fab Ere
12.5.2 Piping Fabrication & Erection Schedule for Process Area Year
Line No
As of 2011
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2012
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
2013
Jun Jul Aug Sep Oct Nov
Line No
1 2 3 4 5 6 7 8 9 10 11 12 13 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Area Costruction MILESTONE Procument
1 2
AFC(4/15)
AFC(9/30)
3 4
1st(3/31) 80%
Isometric Drawings Model Review
2nd(07/31) 90%
3rd(11/30) 100%
5 6 7
30%(4/3-4/14)
Piping Material P/O
60%(8/14-11/11)
90%(11/1/06-01/30/07)
1st Delivery (9/31)60%
Final(1/15) 100%
2nd Delivery (2/28)100%
8 9 10 11 12 13
Piping Material Delivery on Site M/C I Pile FDN & PC for Pipe Rack (R1001-2,101-4,201-2,301-2,401-4) Foundation for RC Structure(S-101-2,201-4,301-306,401-2) PC Rack Erection (R1001-2,101-4,201-2,301-2,401-4) FDN & Structure for Shelter (H101,201-2,301-2) STL/STR for Pipe Rack (R1001-2,101-4,201-2,301-2,401-4) STL/STR for Equip. STR (S-101-2,201-4,301-306,401-2) STL/STR for Shelter (H101,201-2,301-2) Erection for Column Erection for Vessel Erection for Pumps Erection for Heat Exchanger(TEMA) Erection for Compressor Erection for Tank
1st(4/15) 80%
2nd(08/10) 90%
2nd M/C
FDN & PC for Pipe Rack (R1001-2,101-4,201-2,301-2,401-4) Foundation for RC Structure(S-101-2,201-4,301-306,401-2) PC Rack Erection (R1001-2,101-4,201-2,301-2,401-4) FDN & Structure for Shelter (H101,201-2,301-2) STL/STR for Pipe Rack (R1001-2,101-4,201-2,301-2,401-4) STL/STR for Equip. STR (S-101-2,201-4,301-306,401-2) STL/STR for Shelter (H101,201-2,301-2) Erection for Column Erection for Vessel Erection for Pumps Erection for Heat Exchanger(TEMA) Erection for Compressor Erection for Tank
3rd M/C
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Activity
Area No.
Work Volume
Start-Finish
Dur.
31 32
111
FIELD SHOP FIELD SHOP FIELD SHOP FIELD SHOP FIELD SHOP Field Erection Total FIELD SHOP FIELD SHOP FIELD SHOP FIELD SHOP FIELD SHOP Field Erection Total FIELD SHOP FIELD SHOP FIELD M M Shop FabricationTotal M M Shop FabricationTotal
112
33
34
113
34
114
35
36
115
36
37 38 121
37 38
122
39
40
123
40
124
41
42
125
42
43 44 131
43 44
132
45
46
133 SHOP 134 FIELD SHOP FIELD SHOP Field Erection Total FIELD SHOP FIELD SHOP FIELD SHOP Field Erection Total FIELD SHOP FIELD SHOP FIELD SHOP Field Erection Total FIELD SHOP FIELD SHOP FIELD SHOP Field Erection Total #REF! #REF! #REF! #REF! #REF! #REF! M M M Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov M M M M Shop FabricationTotal Field Erection Total Shop Fabrication Total Field & Shop Total M M Shop FabricationTotal 161 M M Shop FabricationTotal 151 M M Shop FabricationTotal 141
46
47
47
48
135
48
49 50 Area (140)
ISO DWG ISSUE SCH. P/R Tank : 3" & Above : 3" & Under :
49 50
51
142
51
52
143
52
53 50 Area (150)
ISO DWG ISSUE SCH. P/R Tank : 3" & Above : 3" & Under :
53 50
51
152
51
52
153
52
53 50 Area (160)
ISO DWG ISSUE SCH. P/R Tank : 3" & Above : 3" & Under :
53 50
51
162
51
52
163
52
53 57
53 57
85 86 87
Field Direct Manpower (Dia-Inch / 1.42 / 26) Shop Direct Manpower (Dia-Inch / 3.85 / 26) Total Manpower
85 86
0
Dec
0
Jan
0
Feb
0
Mar
0
Apr
0
May
0
Jun
0
Jul
0
Aug
0
Sep
0
Oct
0
Nov
0
Dec
0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
87
Line No
Year
Month PJ Month Const. Month