‘aky ovuc cD aaw> S3ENN2
{ond Gas Properiea Co.LLe
\P158.20 - 424 Villas - Monte Carlo Cluster - Damac Lagoons, Dubai, UAE
NTRACTO!
Jeo IR INSPECTION REQUEST Ba a ert ont | Tu
P158.20-CIR-ClV-3098 =| |
[Location of Work Monte Garo | __Groupr36 | Vill: 371372 Level: FF
[Drawing (Speciation ro 7s per liached cations
[Details of Works:
linspection request for surface preparation and installation of plaster accessaries & subframes prior to start
plaster work at first floor internal wall plaster as per highlighted drawing - GG7-1 Group 36 Villa no.371,372
Checklist) Drawing & Specification MEP Clearance OI Related inspection Requests
fae
as Date: §-$ep-24
ft
[For Main Gontractor (PM)
IName: Lu Xiao Feng
Signatur
[Resident En = Inspection Status
. rocoer Rejeced, Re-svbmit repecton|
fa ee: acwnror ewes [| = vu
B - Work may proceed
[signatures subject to compliance of - tepecton nat requed
‘comments as attached
[important: Permission to proceed does not constitute acceptance or approval of work under inspection does not relieve the contractor fom full
[compliance with contractual requirements
date: 12/9] 2ozy
[Resident Engineer Signature:
IFor Sub-Contractor:
IName:
Signature:
Name:
Namo: Signature: Date:sveo SBENRE
OE irre ne
Tobe ‘Completed By
S.1No. Comments | complied [= ]s1¢n@) pare a om
by ture
_ Map cheavance. to be. altadh ed ead vesubmit TR.
_ Found Salis Fadory to Proceed The. work ot site
pad
Arr aiets
(219 [224
Date
Iwame:
|Signature:rote
ORE et
ENN
&
feint Engenieg Coston
OF Paka Vine hs OT aa
Ferns
[ins Nels nd ed Conevaeion Co
fans
ld Ons roe, Uc OANA
a
Td abs Delon et Athy ODA)
lw
DesemPTion /Acrvmies
HT]
[cp deepened
[Neto Seteat appl
[a beaters ely wh post pein
Ite mt a approved by te conan
ening of he ees ands
[yet oft aks ae ping forte dor
fowny Prat coun poe arpa agproved shop caning
[inss as peraproved op wins does and win
forks wat mesh wet pecii ooes
[ban cas a wins ops Wi CHUB
\
reper jin ting cart oat
emesis af bck wrk cone pei locos,
Jiticd wk as er eproved sop dwg
ep DB are, iy a and ey When Baar
fick nok dons prepped rigs.
iter bord id tock ada and bea fi
[parioas coping cried ou aoe ened
fists rene lowed al eines2m AAC Hk Eons wa
Pt ker oped aa
2 RR fe aap pe |
"TH RS FLOR BR BSEDTLE
es zoos Bh AC Hl era os
TE Spm ec
seg AC Hah atoms
(rac = pagoda |
eB Sine
[9 SE fea a roc mia
mons
a St
==
* Wooten dor star opening fh ork, tack werk
emt a ppp
(ara eto
oto
E
aaeeatte stone.
Beat ne
yyotalleh
oe
ay
4s
hod
=
Sf
ve
<&
ae,
be
enty
%‘WAL TYPHLHGEND
ln “onscreen ence Lota on ooo SOHAL
yg om AAC ck lier es
teagan ee
"5 (outaas rapes
2m AACR
6 (ea eh erage
"Put (alga) por mi
PR (Ear al A papel
‘neg
tf Siteneznacatn
SD
(CL MM Coen Vs