Be - Chemical Engineering - Semester 7 - 2019 - December - Process Equipment Design Ped Cbcgs
Be - Chemical Engineering - Semester 7 - 2019 - December - Process Equipment Design Ped Cbcgs
Be - Chemical Engineering - Semester 7 - 2019 - December - Process Equipment Design Ped Cbcgs
a)
B
(e)
(c)
(a)
(d)
(b)
F0 D54 493 6B9 96A C32 2A5 DE 416 6FB BCB C2 6C4 4F0 D54 4936 6B9
Q. 3
Q. 2
Q. 1
D 9 6B 6 C A D 41 6F C C 6C F D 9 B 6A
11/14/2019
D5 5493 36B 96AAC3 32A 5DE E41 66F BC BC 26C 4F0 0D5 5493 36B 96A C3
4 9 2 5 6 B B 2 4 4 6 9 C 2
76473
54 936 6B96 6AC C32 A5DDE4 4166 6FB CB C26 6C4 F0DD54 936 B96 6AC 32AA5D
93 B9 A 32 A5 E 16 FB CB C2 C4 F0 54 93 B9 A 32 5 E
49 6B 6A C3 A D 41 6F C C 6C F D5 9 6B 6A C3 A DE 41
36 96 C 2A 5D E4 66 B BC 26 4F 0D 49 36 96 C 2A 5D 4 66
(i)
Data –
B9 A 32 5 E 16 FB CB 2 C4 0 54 36 B9 A 32 5 E4 16 FB
(ii)
6A C3 A5 DE 416 6F CB C2 6C F0 D5 93 B9 6A C3 A5 DE 16 6FB CB
C3 2A DE 41 6F BC C 6C 4F0 D5 493 6B 6A C3 2A DE 41 6F C C2
Duration: 3 hours
Fluid – Water,
16 FB CB C2 C4 F0 54 936 B9 AC 32 5 E4 16 FB CB 2 C4 0D 54
Data –
6F C C 6C F0 D5 93 B 6A 3 A5 DE 16 6F C C2 6C F0 5 93
(a) Shell,
(b) Head,
No. of shells – 1,
BC BC 26C 4F D 49 6B 96 C3 2A D 41 6F BC BC 6C 4F D5 49 6B
Types of packings
BC 26 4F 0D 549 36B 96 AC 2A 5D E41 66F BC BC 26C 4F 0D 49 36B 96A
Theories of failure
tall column internals
Tube Side:-
Shell Side:-
F0 54 93 B9 6A 32 A5 E 16 FB CB C2 C4 F0 54 936 B9 A 32 A5
B9 A 32 5 E 16 FB CB 2 C4 0 54 36 B9 A 32 5 E4 16 FB
types of high pressure vessel
6A C3 A5 DE 416 6F CB C2 6C F0 D5 93 B9 6A C3 A5 DE 16 6FB CB
Page 1 of 2
No. of passes – 1,
F0 54 93 B9 6A 32 A5 E 16 FB CB C2 C4 F0 54 936 B9 A 32 A5
D5 93 6B 6A C3 A DE 41 6F C C 6C F0 D5 93 B 6A C3 A5 DE
(ii) Assume suitable data wherever necessary.
E4166FBCBC26C4F0D54936B96AC32A5D
6F C C 6C F0 D5 93 B 6A 3 A5 DE 16 6F C C2 6C F0 5 93
BC BC 26C 4F D 49 6B 96 C3 2A D 41 6F BC BC 6C 4F D5 49 6B
B9 A 32 5 E 16 FB CB 2 C4 0 54 36 B9 A 32 5 E4 16 FB
6A C3 A5 DE 416 6F CB C2 6C F0 D5 93 B9 6A C3 A5 DE 16 6FB CB
Paper / Subject Code: 41951 / Process Equipment Design (PED)
C3 2A DE 41 6F BC C 6C 4F0 D5 493 6B 6A C3 2A DE 41 6F C C2
Total Marks: 80
03
03
06
02
06
20
C4 0D 54 36 9 AC 32 5D E4 66 FB B 26 C4 0D 54
F0 54 93 B9 6A 32 A5 E 16 FB CB C2 C4 F0 54
D5 93 6B 6A C3 A DE 41 6F C C 6C F0 D5 93
49 6B 96A C3 2A 5D 41 66F BC BC 26C 4F D5 49
36 96 C 2A 5D E4 66 B BC 26 4F 0D 49 36
B9 A 32 5 E 16 FB CB 2 C4 0 54 36
6A C3 A5 DE 416 6F CB C2 6C F0 D5 93 B
C3 2A DE 41 6F BC C 6C 4F0 D5 493 6B
2A 5D 41 66F BC BC 26C 4F D 49 6B 9
5D E4 66 BC BC 26 4F 0D 549 36B 96
1T00527 - B.E.(Chemical Engineering)(SEM-VII)(Choice Base) / 41951 - Process Equipment Design (PED)
E4 166 FB B 26 C4 0D 54 36 96
1 F C C C F0 5 93 B A
C C 6C F0 D5 93 B 6A C3 A5
CB BC2 26C4 4F0 D54 493 6B9 96A C32 2A5 DE
6 D 6 6 C A D 4
BC C26 C4F F0D 549 936B B96 AC 32A 5D E41 166F
2 C4 0D 54 36 9 AC 32 5D E4 66 B
C2 6C F0 5 93 B9 6A 32 A5 E 16 FB CB
6 4 D 4 6 6 C D 4 6
26 C4F F0D 549 936B B96 AC 32AA5D E41 166 FBC CBC C26
C4 0D 54 36 9 AC 32 5D E4 66 FB B 26 C4
C4 F0D 54 936 B9 6AC 32 A5D E4 166 FB CB C26 C4 F0D
F 9 B 6 A C C F
4F 0D5 549 36B 96AAC3 32A 5D E41 166F FBC BC 26C C4F 0D5 5493
0 3 5 E 6 B 2 0
(a)
(a)
(b)
(b)
F0 D54 493 6B9 96A C32 2A5 DE 416 6FB BCB C2 6C4 4F0 D54 4936 6B9
Q. 6
Q. 5
Q. 4
D 9 6B 6 C A D 41 6F C C 6C F D 9 B 6A
D5 5493 36B 96AAC3 32A 5DE E41 66F BC BC 26C 4F0 0D5 5493 36B 96A C3
4 9 2 5 6 B B 2 4 4 6 9 C 2
76473
54 936 6B96 6AC C32 A5DDE4 4166 6FB CB C26 6C4 F0DD54 936 B96 6AC 32AA5D
93 B9 A 32 A5 E 16 FB CB C2 C4 F0 54 93 B9 A 32 5 E
49 6B 6A C3 A D 41 6F C C 6C F D5 9 6B 6A C3 A DE 41
Data:
36 96 C 2A 5D E4 66 B BC 26 4F 0D 49 36 96 C 2A 5D 4 66
B9 A 32 5 E 16 FB CB 2 C4 0 54 36 B9 A 32 5 E4 16 FB
6A C3 A5 DE 416 6F CB C2 6C F0 D5 93 B9 6A C3 A5 DE 16 6FB CB
C3 2A DE 41 6F BC C 6C 4F0 D5 493 6B 6A C3 2A DE 41 6F C C2
2A 5D 41 66F BC BC 26C 4F D 49 6B 96A C3 2A 5D 41 66F BC BC 6C
5D E4 66 BC BC 26 4F 0D 549 36B 96 C 2A 5D E41 66 BC BC 26 4F
E4 166 FB B 26 C4 0D 54 36 96 AC 32A 5D E4 66 FB BC 26 C4F 0D
16 FB CB C2 C4 F0 54 936 B9 AC 32 5 E4 16 FB CB 2 C4 0D 54
6F C C 6C F0 D5 93 B 6A 3 A5 DE 16 6F C C2 6C F0 5 93
P.C.D. = 4250mm,
BC 26 4F 0D 549 36B 96 AC 2A 5D E41 66F BC BC 26C 4F 0D 49 36B 96A
Factor of safety = 3
26 C4F 0D 549 36B 96 AC 32A 5D E41 66 BC BC 26 4F 0D 549 36B 96 C
D3 = 300 mm
D1 = 200 mm
C4 0D 54 36 9 AC 32 5D E4 66 FB B 26 C4 0D 54 36 96 AC 32
O.D. of Tube = 80mm,
Tube Material = Brass,
Pf = 7.85 MPa
F0 54 93 B9 6A 32 A5 E 16 FB CB C2 C4 F0 54 936 B9 A 32 A5
D5 93 6B 6A C3 A DE 41 6F C C 6C F0 D5 93 B 6A C3 A5 DE
Tube Thickness = 1.8mm
α = 12×10-6 / oC
(f) Head thickness
49 6B 96A C3 2A 5D 41 66F BC BC 26C 4F D5 49 6B 96A C3 2A DE 41
36 96 C 2A 5D E4 66 B BC 26 4F 0D 49 36 96 C 2A 5D 4 66
stress distribution =?
B9 A 32 5 E 16 FB CB 2 C4 0 54 36 B9 A 32 5 E4 16 FB
Pitch of tube (Δlar) = 120mm
M.O.C. = Low Carbon Steel,
1) PFD
6A C3 A5 DE 416 6F CB C2 6C F0 D5 93 B9 6A C3 A5 DE 16 6FB CB
Bottom Flange of Calendria: -
E for Brass = 9.6 x 104 N/mm2
C3 2A DE 41 6F BC C 6C 4F0 D5 493 6B 6A C3 2A DE 41 6F C C2
E for L.C.S. = 20 x 104 N/mm2,
Density of Vapor = 0.86 N/mm3
------------------------
C4 0D 54 36 9 AC 32 5D E4 66 FB B 26 C4 0D 54 36 96 AC 32
2) PID
Page 2 of 2
N/mm2. (Calculation of deformation of tube).
F0 54 93 B9 6A 32 A5 E 16 FB CB C2 C4 F0 54 936 B9 A 32 A5
D5 93 6B 6A C3 A DE 41 6F C C 6C F0 D5 93 B 6A C3 A5 DE
49 6B 96A C3 2A 5D 41 66F BC BC 26C 4F D5 49 6B 96A C3 2A DE 41
36 96 C 2A 5D E4 66 B BC 26 4F 0D 49 36 96 C 2A 5D 4 66
B9 A 32 5 E 16 FB CB 2 C4 0 54 36 B9 A 32 5 E4 16 FB
Conical heads at top and bottom cone angle = 1200
6A C3 A5 DE 416 6F CB C2 6C F0 D5 93 B9 6A C3 A5 DE 16 6FB CB
(d) Evaporator drum thickness and diameter,
C3 2A DE 41 6F BC C 6C 4F0 D5 493 6B 6A C3 2A DE 41 6F C C2
Permissible Stress for Low Carbon Steel = 100 N/mm2
E4166FBCBC26C4F0D54936B96AC32A5D
Pi = 83 MPa
6F C C 6C F0 D5 93 B 6A 3 A5 DE 16 6F C C2 6C F0 5 93
D2 = 250 mm
BC BC 26C 4F D 49 6B 96 C3 2A D 41 6F BC BC 6C 4F D5 49 6B
BC 26 4F 0D 549 36B 96 AC 2A 5D E41 66F BC BC 26C 4F 0D 49 36B 96A
No. of bolts = 120,
E = 200×103 N/mm2
t =? (temp. difference)
D5 93 6B 6A C3 A DE 41 6F C C 6C F0 D5 93 B 6A C3 A5 DE
should incoroporate calculation of all the stresses acting on the shell.
36 96 C 2A 5D E4 66 B BC 26 4F 0D 49 36 96 C 2A 5D 4 66
B9 A 32 5 E 16 FB CB 2 C4 0 54 36 B9 A 32 5 E4 16 FB
6A C3 A5 DE 416 6F CB C2 6C F0 D5 93 B9 6A C3 A5 DE 16 6FB CB
Paper / Subject Code: 41951 / Process Equipment Design (PED)
C3 2A DE 41 6F BC C 6C 4F0 D5 493 6B 6A C3 2A DE 41 6F C C2
2A 5D 41 66F BC BC 26C 4F D 49 6B 96A C3 2A 5D 41 66F BC BC 6C
Explain the design procedure for shell wall of a tall column. Design procedure
10
10
A high pressure compound cylinder consist of an inner tube of inner diameter 200 10
12
02
06
04
04
04
C4 0D 54 36 9 AC 32 5D E4 66 FB B 26 C4 0D 54
F0 54 93 B9 6A 32 A5 E 16 FB CB C2 C4 F0 54
D5 93 6B 6A C3 A DE 41 6F C C 6C F0 D5 93
49 6B 96A C3 2A 5D 41 66F BC BC 26C 4F D5 49
36 96 C 2A 5D E4 66 B BC 26 4F 0D 49 36
B9 A 32 5 E 16 FB CB 2 C4 0 54 36
6A C3 A5 DE 416 6F CB C2 6C F0 D5 93 B
C3 2A DE 41 6F BC C 6C 4F0 D5 493 6B
2A 5D 41 66F BC BC 26C 4F D 49 6B 9
5D E4 66 BC BC 26 4F 0D 549 36B 96
E4 166 FB B 26 C4 0D 54 36 96
1 F C C C F0 5 93 B A