Main Tunnel-P2
Main Tunnel-P2
Main Tunnel-P2
A A
C R.O MEMBRANE C
1304
SOAKING TUB PHE D.I FEED
RAW
JUICE TANK
R.O WATER TANK
ENZYME ENZYME ENZYME ENZYME TANK
2599
STORAGE TANK TANK 4 TANK 3 TANK 2 TANK 1
2349
D.I BUFFER
TANK
D HOT WATER D
RECIRCULATION BUFFER
HCL R.O TANK TANK
WATER SODIUM FILTER
MIXING HYDROXIDE DOSING
& MIXING
15183
MULTIMEDIA CARBON
E R.O FILTER FILTER E
CLEANING TANK TANK 1A 2A 4A
11280
CONTROL 3A
STATION RM. 5A
4416
R.O BACKWASH TANK RESIN RESIN RESIN RESIN
3715
2559 RESIN
TANK TANK TANK TANK TANK
F ELEVATOR
F
R.O WATER
2007
TANK SYSTEM 1B 2B 3B 4B 5B
12743 3039 6075 2161 1842 4154 2252 2249 2253 1872 2334
G G
15115
1
M 2
BLOW-UP PLAN
SCALE 1:150 METERS
H H
APPROVED BY: PLOT SCALE: 1:1 A3 PROPOSED PROJECT: NO DEVIATION FROM PRINT WITHOUT APPROVAL OF SHEET CONTENTS NOTIFICATION No. SHEET 2 of 2
Philippines, Inc.
VLADEMIR R. ORBESIDO DATE: 06-13-2024 Philippines, Inc. DESIGN DEPARTMENT.
- BLOW UP PLAN
1700016475
MAIN TUNNEL - 2
MAIN TUNNEL
CIVIL ENGINEER DRAWN: GD CAPADA OWNER THE CONTENT OF THIS DRAWING IS A PROPERTY OF -
ENGINEERING SERVICES DIVISION REG. NO.: 0104770 TIN: 930-462-428 CHECKED:
APPROVED:
EB CASEDO
JML VALLEJO
-
DOLE PHILIPPINES, INC. AND MUST
NOT BE USED EXCEPT IN CONNECTION WITH
WORK ASSIGNED. DOLE PHILIPPINES,INC.
-
-
REVISION No.
-
-
-
-
REVISION DATE INITIATOR OF REVISION
-
-
-
-
ZONE
M
CIVIL / MECHANICAL/ ELECTRICAL/
GEODETIC/ MASTER PLUMBER
PTR NO.: 5706785 DATE: 01-18-2024