Schedule of Footing: GRP - No

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

SCHEDULE OF FOOTING

1.50 1.50
1.20

0.23 0.23 0.23


GRP.NO I II III IV V
0.35

0.35

0.35
1.30

C2,C3,C10, C5,C7 C4,C8,C12 C6,C9,C13

1.60
C1

1.60
COLUMN NUMBER C11
C1 C3
C2
DEPTH OF Dmax 0.40 0.45 0.55 0.50 0.45
FOOTING
1.80 Dmin 0.20 0.20 0.20 0.20 0.20
1.80
1.40
SIZE OF FTG.(BXL) 1.20X1.30 1.50X1.60 1.80X2.00 1.70X1.80 1.40X1.50
0.23 0.23
0.40
2.00

0.40

9-T10 12-T10 15-T10

0.35

1.50
LONG REINF.L BARS
1.70

14-T10 11-T10
0.23

C4
SHORT REINF.S BARS 10-T10 13-T10 17-T10 15-T10 12-T10
C6
C5
2.00
1.40 TIES

NOTES:
0.50 0.23 0.23 0.10 0.10
1) CONCRETE GRADE M25 (1:1:2)
1.80
0.23

0.35

1.50
0.35

1.80

1.60
2) Fe500STEEL TO BE USED.
Dmax
Dmin 0.30M 0.30M
3) COVER FOR:-
C7 C8 C9 0.10 0.10
0.35 1.70 P.C.C 0.10M THK a) FOOTING - 5CMS
MM
1.50
0.23

RUBBLE PACKING 0.50M b) COLUMNS - 4CMS 75


SHORT BARS LONG BARS c) BEAMS - 3CMS
135 BEND
C10 d) SLAB - 2 CMS
SECTION A-A
4) LAP LENGTH:-
a) 8 - 50 CMS
0.10
b) 10 - 60 CMS
SHORT BARS
c) 12 - 70CMS TYPICAL HOOK DETAILS
1.50 1.80 1.40 A A d) 16 - 100 CMS
0.23
0.23 e) 20 - 120 CMS
0.35 B
f) 25 - 150 cms
1.60

0.50

1.70

1.50
0.35
0.23

LONG BARS 5) LAP LENGTH FOR FOOTING


IS NOT ALLOWED.
0.10
C11 C13 6) CURING PERIOD 28 DAYS. SANCHITA SAWANT
STRUCTURAL ENGG.
C12 0.10 L 0.10
7) ALL DIMENSION ARE IN MT. Ph.no.7775090997
excavation depth - 1.5m for group I,II,IV,V PLAN Client
8) READ DRAWING WITH
- 1.7M FOR GROUP III TYPICAL C\S OF A TRAPEZOIDAL T i t l e FOOTING LAYOUT
ARCHITECTURAL DRAWING
FOOTING
DWG. NO. 2 DATE:19-08-21