Lap. Ansar HRS-WC (Minyambow)

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Paket : PEMBANGUNAN JALAN PRAFI - MANYAMBOUW - ANGGI - RANSIKI

No. Kontrak : HK.0203/498693/PPK 1.3/PJPMAR/2023/02


Tanggal Kontrak : 21 MARET 2023
Penyedia Jasa : PT. EXPRA, PT. MANOKWARI MULTI MITRA KSO
Konsultan Supervisi : PT. WESITAN KONSULTASI PEMBANGUNAN KSO PT. ESKAPINDO MATRA,
PT. GRACIA PAPUA CONSULTANT
Pekerjaan : Trial mix - Job Mix Formula (JMF) Lataston HRS - WC
Tanggal : 10 Juli 2023

GRADASI AGREGAT GABUNGAN


Ukuran saringan BIN I BIN II BIN III BIN IV FILLER BATAS
HASIL
Inch mm 100% 15% 100% 45% 100% 15% 100% 23% 100% 2% TOLERANSI
1½ 37,5 100,00 15,00 100,00 45,00 100,00 15,00 100,00 23,00 100,00 2,00 100 100
1 25,4 100,00 15,00 100,00 45,00 100,00 15,00 100,00 23,00 100,00 2,00 100 100
3/4 19,0 100,00 15,00 100,00 45,00 100,00 15,00 100,00 23,00 100,00 2,00 100 100
1/2 12,7 100,00 15,00 100,00 45,00 100,00 15,00 68,22 15,69 100,00 2,00 92,69 90 - 100
3/8 9,80 100,00 15,00 100,00 45,00 98,49 14,77 26,76 6,16 100,00 2,00 82,93 75 - 85
No. 8 2,35 74,44 11,17 86,51 38,93 0,00 0,00 0,00 0,00 100,00 2,00 52,10 50 - 72
No. 30 0,60 53,70 8,06 54,46 24,51 22,93 3,44 0,00 0,00 100,00 2,00 38,00 35 - 60
No. 200 0,075 21,08 3,16 5,03 2,26 0,00 0,00 0,00 0,00 100,00 2,00 7,42 6 - 10

GRAFIK GRADASI AGREGAT GABUNGAN HRS - WC


GRAFIK GRADASI GABUNGAN HRS -WC
100
100
90
90
Series1
80
Series2
80
70
Series3
70
60
Lolos

60
%Lolos

50
50
40
%

40
30
30
20
20
10
10
0
0 NO.200 No.30 No.8 3/8 1/2 3/4
2,35
0,30

0,60

9,80

12,7
0,075

19,00

Ukuran
Ukuran saringan (mm)(mm)
Saringan

15% 100% 45% 100% 15% 100% 23% 100% 2%

Disetujui Oleh :
PPK 1.3 Diperiksa Oleh : Dibuat Oleh :
KOORDINATOR KONSULTAN PENGAWAS PENYEDIA JASA
PENGAWAS LAPANGAN

SUGITO MATOR MUHADIRJA, ST ERIATY ROSDAHAYANIE, ST


NIP. 19700120 200604 1 003 Quality Engineer Manager Teknik