Productivty
Productivty
Productivty
0 PR
0.1 CAR
0.1.1 FORM
D = DEPTH
U. GR. = UNDERGROUND
D/S = DECK - SLAB
> = GREATER THAN
< = LESS THAN
0.2 MAS
0.3 PLA
0.4 CER
0.5 TIL
0.5.1 FLR
0.5.1.1 KIT
0.5.1.2 COR
0.5.1.3 BR
0.5.1.4 STO
0.5.1.5 BAT
0.5.2 WLL
0.5.2.1 KIT
0.5.2.2 COR
0.5.2.3 BAT
0.5.3 WLL+FLR
0.5.3.1 BAT
0.6 PAV
0.7 MH
0.8 MISC-LAB
0.9 MISC-CAR
0.10 CONC-REP
0.11 GEN-LAB
0.12 NTRA
0.13 REB
0.14 EXC
0.15 INF
0.15.1
Item Description
PRODUCTIVITY RATE
CARPENTRY WORKS
FORMWORK
Formwork to footings
Formwork to isolated footings
Formwork to rafts
Formwork to rafts D>0.75m
Formwork to tie beams
Formwork to high level tie beams D>0.45M
Formwork to Neck Columns
Formwork to U/G Water tank
Formwork to basement retaining walls
Formwork to columns (small size)
Formwork to Columns (large size)
Formwork to D/S beam internal (shallow)
Formwork to D/S beam external (Deep)
Formwork to D/S beam external (Shallow)
Formwork to D/S beam external (Deep)
Formwork to lift walls single core
Formwork to lift walls multi core
Formwork to slab decking (10ft) hourdi
Formwork to slab decking (>10ft) hourdi D/S beams
Formwork to slab decking (>10ft) hourdi
Formwork to slab decking (>10ft) hourdi
Formwork to staircase (non spiral)
Formwork to balcony parapets
Formwork to roof parapets
shutter Manufacture for pile caps
shutter Fix for pile caps
Deshutter footings/pile caps
Shutter make column necks
Shutter fix column necks
Deshutter Column necks
Shutter make tie beams
shutter fix tie beams
Column shutter making
Column shutter fixing
Column deshuttering
Walls shutter making
Walls shutter fixing
De shutter Tie beam shutter
Wall formwork deshuttering
Staircase formwork making
staircase formwork fixing
Staircase formwork deshuttering
Drop beams formwork making
Drop beams formwork fixing
Drop beams formwork stipping
suspended slab formwork fixing
suspended slab formwork deshutter
Formwork fixing for sunshades
Parapet formwork making
Parapets formwork fixing
Parapets formwork stripping
Fixing of lintle formwork
Fixing of lintle formwork
Deshutter lintle formwork
Deck formwork fixing
Deck Formwork deshuttering
Pipe scaffolding erection for slab
inverted beam shutter fixing
De-Shuttering Manholes, square - circular (Timber)
Manhole Shutter erection - square or circular(Timber)
Metal Shutter for Manholes
Metal Shutter for Precast Beams
Metal Shutter for Pile caps
Metal Shutters for Pile cap Beams
= UNDERGROUND
= DECK - SLAB
GREATER THAN
LESS THAN
MASONRY WORK
Hollow Blockwork (100, 150 & 200 mm)
Hollow Blockwork (large panels)
Solid blockwork
Solid Blockwork as Raft forms
PLASTER WORK
Plaster (internal), walls final coat
Plaster (internal), walls rush coat
Plaster (internal), walls mesh
Plaster (internal), walls hacking
Plaster (internal), walls guide point
Plaster (internal), walls corner beads
Plaster (external), walls with grooves
Plaster (external), walls without grooves
Plaster (external), walls rush coat
Plaster (external), walls mesh
Plaster (external), walls hacking
Plaster (external), walls guide points
Plaster (external), walls corner beads
Plastering of Arches/Mullians
Floor screed 50mm thick
Roof screed 100 mm thick
Mosiac floor Tiles fixing
Floor Screed 25mm thick
CERAMIC WORK
Ceramic tiles to walls by mortar
Ceramic tiles to walls, mortar to corridors
Ceramic tiles to walls, cut pieces
Ceramic tiles to walls grouting
Ceramic tiles to walls, by glue
Ceramic tiles to walls, corridors, by glue
Ceramic tiles to walls, by glue, cut pieces
Ceramic tiles to walls, by glue, grouting
Ceramic tiles to floors
Ceramic tiles to floors in halls
Ceramic tiles to floors, cut pieces
Ceramic tiles to floors, grouting
Marble flooring
Ceramic tiles to floors, cut pieces
Ceramic tiles to floors, grouting
Marble flooring
Ceramic skirting by glue
Ceramic skirting by glue to halls, corridors
TILING WORK
Mosiac / Terrazo tiles to roofs
Mosiac / Terrazo tiles to floors
Mosiac skirting to halls
Mosiac skirting flush / recessed
Grouting / sealing to roof / floor tiles
Floor Tile
Kitchen
Floor Tile
Bed room
Floor Tile
Bathroom
Floor Tile
Wall Tile
Kitchen
Wall Tile
Corridor
Wall Tile
Bathroom
Wall Tile
REINFORCEMENT
Fix Rebar to footings & tie beams
Fix Rebar to walls, columns, beams, solid slabs
Fix rebar to ribs of hourdi slab
Fix rebar to mesh reinforcement
Fix rebar to hidden beams
Steel cutting and bending 18.25 mm
Steel cutting and bending 8 - 16 mm
EXCAVATION
Manual Excavation
Backfill + levelling
Shaping of sloped earth for blinding for bases including compaction
INFRASTRUCTURE
Riprap Works
Cutting/Excavation of Surface
Disposal within airport boundary
Excavation for Stubs
Installarion of Gravel Filter for Stubs
Mass Concrete Filling for Stubs
Installarion of Gravel Filter
Installarion of Riprap Boulders
Mass Concrete Filling
Site Clearing and Grubbing
Excavation
Filling of Excavated material incld. Compaction
Filling of granular material
Riprap Protection Works
m2 9.6
m2 12.8
m2 11.2
m2 14.4
m2 8
m2 9.6
m2 3.2
m2 4.8
m2 7.2
m2 5.6
m2 7.2
m2 4.8
m2 5.6
m2 3.2
m2 4.8
m2 4.8
m2 6.4
m2 12.8
m2 9.6
m2 9.6
m2 8
m2 3.2
m2 4.8
m2 6.4
m2 16
m2 24
m2 48
m2 12
m2 9.6
m2 38.4
m2 9.6
m2 8
m2 9.6
m2 8
m2 32
m2 12
m2 64
m2 32
m2 25.6
m2 6.4
m2 6.4
m2 12.8
m2 8
m2 6.4
m2 25.6
m2 9.6
m2 40
m2 5.6
m2 9.6
m2 8
m2 32
m2 4
m2 4
m2 16
m2 12
m2 48
m2 68
m2 8
m2 32
m2 12
m2 8
m2 24
m2 21.6
m2 24
Nos. 96
Nos. 112
Nos. 76
Nos. 88
m2 12.8
m2 120
m2 80
m2 80
m2 80
m2 80
m2 8
m2 9.6
m2 120
m2 80
m2 80
m2 80
m2 80
m2 64
m2 16
m2 12
m2 1.2
m2 4.8
m2 6.4
m2 7.2
m2 16
m2 40
m2 9.6
m2 10.4
m2 16
m2 40
m2 8
m2 9.6
m2 16
m2 40
m2 48
m2 20
m2 50
m2 60
m2 25
m2 30
m2 12.8
m2 11.2
LM 20
LM 11.2
LM 20
m2 11.2
m2 8
m2 18.8
m2 8
m2 4.8
m2 6.8
m2 11.6
m2 5.6
m2 4
LM 20
LM 24
LM 32
LM 12
m2 1.6
m2 12
LM 80
m3 4
m3 8
Nos. 1.6
Nos. 1.6
Nos. 3.2
Nos. 1.6
Nos. 0.8
LM 192
m2 32
m2 56
m2 40
m2 4.8
Nos. 0.8
Nos. 1.6
LM 20
LM 40
m2 40
LM 32
Nos. 160
LM 24
LM 8
m2 64
Nos. 4
Nos. 3.2
LM 16
m3 144
m3 21.6
m3 144
m3 21.6
m3 64.8
m3 7.2
m3 8
m3 120
m3 5.6
m3 64
m3 8
m3 96
m3 48
m3 12
m3 12
m3 24
Nos. 1.6
Nos. 1.6
Nos. 320
m3
m3 4.8
m3 2.4
m3
m2
m3
m3
LM 28.8
LM 9.6
m2 200
KG 200
KG 160
KG 144
KG 40
KG 160
KG 400
KG 320
m3 2.4
m3 4
LM 4.8
m3
m3
LM
LM
LM
m2
m2
m2
m2
m3
m3
m3
m2
m3 200
m3 8
m3 90
m3 25
No 1
LM 30
LM 20
No 2
m3 70
m3 40
m3 50
No 3
m2 40
m 100
No. 1
m3 100
m2 30
m3 20
m3 20
No. 1
Total Planned Manpower
Aluminum Technician
Antitermite Crew
Carpet Fixer
(8 Hrs)
Amount
AED
0 0 0
9.6 1 3 0
12.8 1 3 0
11.2 1 3 0
14.4 1 3 0
8 1 3 0
9.6 1 3 0
3.2 1 3 0
4.8 1 3 0
7.2 1 3 0
5.6 1 3 0
7.2 1 3 0
4.8 1 3 0
5.6 1 3 0
3.2 1 3 0
4.8 1 3 0
4.8 1 3 0
6.4 1 3 0
12.8 1 3 0
9.6 1 3 0
9.6 1 3 0
8 1 3 0
3.2 1 3 0
4.8 1 3 0
6.4 1 3 0
16 1 2 0
24 1 2 0
48 1 1 0
12 1 2 0
9.6 1 2 0
38.4 1 1 0
9.6 1 2 0
8 1 2 0
9.6 1 2 0
8 1 2 0
32 1 1 0
12 1 2 0
64 1 2 0
32 1 1 0
25.6 1 1 0
6.4 1 2 0
6.4 1 2 0
12.8 1 1 0
8 1 2 0
6.4 1 2 0
25.6 1 1 0
9.6 1 2 0
40 1 1 0
5.6 1 2 0
9.6 1 2 0
8 1 2 0
32 1 1 0
4 1 2 0
4 1 2 0
16 1 1 0
12 1 2 0
48 1 1 0
68 1 1 0
8 1 2 0
32 1 2 0
12 1 2 0
8 1 2 0
24 1 4 0
21.6 1 4 0
24 1 4 0
96 1 2 0
112 1 2 0
76 1 2 0
88 1 2 0
12.8 1 2 0
120 1 2 0
80 1 1 0
80 1 1 0
80 1 2 0
80 1 2 0
8 1 2 0
9.6 1 2 0
120 1 2 0
80 1 1 0
80 1 1 0
80 1 2 0
80 1 2 0
64 1 2 0
16 1 2 0
12 1 2 0
1.2 1 2 0
4.8 1 2 0
6.4 1 2 0
7.2 1 2 0
16 1 1 0
40 1 1 0
9.6 1 2 0
10.4 1 2 0
16 1 1 0
40 1 1 0
8 1 2 0
9.6 1 2 0
16 1 1 0
40 1 1 0
48 1 2 0
20 1 1 0
50 1 1 0
60 1 2 0
25 1 2 0
30 1 2 0
12.8 1 2 0
11.2 1 2 0
20 1 2 0
11.2 1 2 0
20 1 1 0
11.2 1 2 0
8 1 3 0
18.8 1 2 0
8 1 2 0
4.8 1 3 0
6.8 1 2 0
11.6 1 2 0
5.6 1 3 0
4 1 3 0
20 1 2 0
24 1 2 0
32 1 2 0
12 1 2 0
1.6 1 2 0
12 1 2 0
80 1 2 0
4 1 1 0
8 1 1 0
1.6 1 2 0
1.6 1 2 0
3.2 1 2 0
1.6 1 2 0
0.8 1 2 0
192 1 1 0
32 1 1 0
56 1 1 0
40 1 1 0
4.8 1 1 0
0.8 1 1 0
1.6 1 1 0
20 1 1 0
40 1 1 0
40 1 2 0
32 1 2 0
160 1 2 0
24 1 1 0
8 1 2 0
64 1 2 0
4 1 1 0
3.2 1 1 0
16 1 1 0
144 1 25 0
21.6 1 11 0
144 1 25 0
21.6 1 7.5 0
64.8 1 22 0
7.2 1 13.5 0
8 1 8 0
120 1 9 0
5.6 1 8 0
64 1 5 0
8 1 9 0
96 1 5 0
48 1 6 0
12 1 8 0
12 1 9 0
24 1 4 0
1.6 1 4 0
1.6 1 4 0
320 1 1 0
4.8 1 4 0
2.4 1 0 0
28.8 1 3 0
9.6 1 0 0
200 1 1 0
200 1 1 0
160 1 1 0
144 1 1 0
40 1 1 0
160 1 1 0
400 1 1 0
320 1 1 0
2.4 1 1 0
4 1 1 0
4.8 1 3 0
150 0 10 2.01666667
150 0 5.35 2.35
25 0 3 1
0 0 0
0 0 0
100 0 10 2
60 0 10 2
0 15 0
0 0 0
200 0 2 1
150 0 8 4
150 0 6 3
15 0 8 3
200
8
90
25
1
30
20
2
70
40
50
3
40
100
1
100
30
20 2
20 4
1
Ceiling Installer
Chargehand
Commissioning Crew
Electrician
Equipment Operator
Gardener
General Carpenter
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
General Helper
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
General Mason
Gypsum Installer
HVAC Technician
Insulator
Mason
1 1
1 1
1
1 1
1 1
1
1 1
1
1 1
1 1
1 1
1
1 1
1 1
1
1 1
1
1 1
1 1
1 1
1 1
2 2
2 2
2 2
1 1
1 1
1 1
1 1
1 1
2
1
1
1 1
1 1
1 1
1 1
2
1
1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1
1
1 1
1 1
1
1
1 1
1 1
1
1
1 1
1
1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1
1 1
1 2
1 1
1 1
1 2
1 1
1 1
1 2
1 2
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1
1
1 1
1 1
1 1
1 1
1 1
1
1
1
1
1
1
1
1
1
1 1
1 1
2
1
1 1
1 1
1
1
1
1 18 6
10 1
1 18 6
0.5 6 1
2 16 4
0.5 12 1
8
6 3
8
4 1
8 1
4 1
5 1
8
6 3
1 3
4
4
1
2
2
2
2 1
1
1
2 1
7
2.35
2
8
8
15
1
4
3
3
1
0.3
1
0.5
0.2
0.3
0.3
2
0.5
0.5
0.3
1
0.3 1
1
0.1
1
0.3 2
1 2
1 4
2
Helper
Painter
Plumber
Precast Installer
Rigger/Flagman
Scaffolding Crew
Signage Installer
Specialist
Steel Fixer
Technical Engineer
Technician
Vanity Installer
1
1
1
1
1
1
1
1
3
3
1
2
2
1
4
3
3 2
2 1
4
5 1
4 1
4
2 3
2 3
2 1
4 1
2 1
2 1
3 1
3 0.3
3 1
2 2
6 1
2
8 1 2
12 1 6
2
Vinyl Flooring Crew
Wooden Carpenter
Bobcat
Concrete Cutter
Concrete Mixer
Concrete Pump
Dewatering Pumps
3T Pick UP
Excavator
Grader
DC Pick UP
Jack Hammer
0.333 1
1
1
1
1 1
0.2 0.2
0.2 0.2
0.3
0.2
0.1
1
0.25
0.35
JCB/Boom Loader
Mixing Plant
Mobile Crane
Paver
Plate Compactor
Pneumatic Roller
Rock Breaker
Roller Compactor
Shovel
Steel Roller
Testing Equipment
Tipper Truck
Vibrator
Water Tanker
0.333
2
1
1
1
1 1
2 1
1 1
0.25 2
1 0.2 0.2
0.3 1 1.5 1
0.3 0.2
0.1 0.1
1 1
1 0.3 0.25
0.5 0.5
1
0.3
1 1.5 0.2 1
0.4 0.1
2
0.2 2
Wheel Loader
0.35
0.35
Item Description
A/C subframe manufacture / fixing
Angle fillet fixing
Backfill + levelling
Backfill to drains / manholes
Backfill using CABC material 3 - 6 mtr
Backfill using dune sand bedding and sarround 3 - 6 mtr
Bathroom
Bathroom
Bathroom
Bed room
Benching to manholes
Bitumen paint to concrete blockwork surfaces
Bitumin painting Bases / piles
Blinding concrete 50 mm (readymix)
Blinding concrete 50 mm (sitemix)
Blockwork to manholes
Breaking pipe opening for re-leveling and connection
Builders work make good chases
CARPENTRY WORKS
Ceramic skirting by glue
Ceramic skirting by glue to halls, corridors
Ceramic tiles to floors
Ceramic tiles to floors in halls
Ceramic tiles to floors, cut pieces
Ceramic tiles to floors, cut pieces
Ceramic tiles to floors, grouting
Ceramic tiles to floors, grouting
Ceramic tiles to walls by mortar
Ceramic tiles to walls grouting
Ceramic tiles to walls, by glue
Ceramic tiles to walls, by glue, cut pieces
Ceramic tiles to walls, by glue, grouting
Ceramic tiles to walls, corridors, by glue
Ceramic tiles to walls, cut pieces
Ceramic tiles to walls, mortar to corridors
CERAMIC WORK
Column deshuttering
Column shutter fixing
Column shutter making
Concrete by site mix
Concrete column necks
Concrete Columns
Concrete footings & pile caps
Concrete Ground slab
Concrete parapets/staircases
CONCRETE PLACEMENT WORKS
Concrete suspended slab (pump)
Concrete tiebeams, ground beams
Concrete to PCC blinding (100 mm thick)
Concrete to pile caps by pump
Concrete to precast slabs, beams
Concrete to slabs / beams by crane
Concrete to slabs/beams, by pump
Concrete to walls / columns, by pump
Corridor
Corridor with Pattern
Curing of beams / slabs Hessiant Water
Curing of columns (Hessiant Water)
Curing of Substructure works
Cutting , removal and disposal of the existing 130 mm thick PMA asphalt
Cutting/Excavation of Surface
De shutter Tie beam shutter
Deck Formwork deshuttering
Deck formwork fixing
Deshutter Column necks
Deshutter footings/pile caps
Deshutter lintle formwork
De-Shuttering Manholes, square - circular (Timber)
Disposal within airport boundary
Door subframe manufacture / fixing
Drop beams formwork fixing
Drop beams formwork making
Drop beams formwork stipping
EXCAVATION
Excavation
Excavation 3 - 6 mtr (Mechanical)
Excavation for drains / manholes
Excavation for Stubs
Excavation up to 2 mtr (Manual)
Filling of Excavated material incld. Compaction
Filling of granular material
Fix covers to manholes
Fix gulley traps
Fix Rebar to footings & tie beams
Fix rebar to hidden beams
Fix rebar to mesh reinforcement
Fix rebar to ribs of hourdi slab
Fix Rebar to walls, columns, beams, solid slabs
fixing of flexcell sheets
Fixing of lintle formwork
Fixing of lintle formwork
Floor Screed 25mm thick
Floor screed 50mm thick
Floor Tile
Floor Tile
Floor Tile
Floor Tile
Floor Tile
Floor Tile
FORMWORK
Formwork fixing for sunshades
Formwork to balcony parapets
Formwork to basement retaining walls
Formwork to Columns (large size)
Formwork to columns (small size)
Formwork to D/S beam external (Deep)
Formwork to D/S beam external (Deep)
Formwork to D/S beam external (Shallow)
Formwork to D/S beam internal (shallow)
Formwork to footings
Formwork to high level tie beams D>0.45M
Formwork to isolated footings
Formwork to lift walls multi core
Formwork to lift walls single core
Formwork to Neck Columns
Formwork to rafts
Formwork to rafts D>0.75m
Formwork to roof parapets
Formwork to slab decking (>10ft) hourdi
Formwork to slab decking (>10ft) hourdi
Formwork to slab decking (>10ft) hourdi D/S beams
Formwork to slab decking (10ft) hourdi
Formwork to staircase (non spiral)
Formwork to tie beams
Formwork to U/G Water tank
GENERAL LABOUR WORKS
Grouting / sealing to roof / floor tiles
Hacking of concrete surfaces
Haunching ot Kerb Base (Mixing Truck)
Haunching to kerb base (Dumpes)
Hollow Blockwork (100, 150 & 200 mm)
Hollow Blockwork (large panels)
Horizontal sealant (12 mm)
Hourdi block shifting and fixing to slab
INFRASTRUCTURE
Installarion of Gravel Filter
Installarion of Gravel Filter for Stubs
Installarion of Riprap Boulders
Interlock paving on pre prepared sub - base
inverted beam shutter fixing
KERBING / BLOCK PAVING WORKS
kerbstonse (Without PCC)
Kitchen
Kitchen
Laying of P.V.C. sleeves 4" - 12"
Laying platform (0.5 mtr)
Loading blockwork to site (with Wheel Burrow)
Loading mortar to site location
Loading ready mix to site location
Loading reinforcement to slab (With Crane)
Manhole Shutter erection - square or circular(Timber)
MANHOLE/ DRAINAGE CONSTRUCTION
Manual Excavation
Marble flooring
Marble flooring
MASONRY WORK
Mass Concrete Filling
Mass Concrete Filling for Stubs
Metal Shutter for Manholes
Metal Shutter for Pile caps
Metal Shutter for Precast Beams
Metal Shutters for Pile cap Beams
MISCELLANEOUS CARPENTARY WORKS
MISCELLANEOUS LABOUR WORKS
Mixing mortar for distribution 0, 3 L mixer
Mosiac / Terrazo tiles to floors
Mosiac / Terrazo tiles to roofs
Mosiac floor Tiles fixing
Mosiac skirting flush / recessed
Mosiac skirting to halls
NON TARGET RELATED ACTIVITES
P.C.C. Curve kerb base (to curves)
Parapet formwork making
Parapets formwork fixing
Parapets formwork stripping
PCC to kerb base (Straight line)
pile cutting/dressing
pile cutting/dressing (small diameter)
Pipe scaffolding erection for slab
Pipeline testings for storm and sewer , Air test
Plaster (external), walls corner beads
Plaster (external), walls guide points
Plaster (external), walls hacking
Plaster (external), walls mesh
Plaster (external), walls rush coat
Plaster (external), walls with grooves
Plaster (external), walls without grooves
Plaster (internal), walls corner beads
Plaster (internal), walls final coat
Plaster (internal), walls guide point
Plaster (internal), walls hacking
Plaster (internal), walls mesh
Plaster (internal), walls rush coat
Plaster to manholes
PLASTER WORK
Plastering of Arches/Mullians
Polythene sheet fixing
PQC slab breaking and removal (380 mm thk)
PQC slab reinstatement (380 mm)
PRODUCTIVITY RATE
Protection Board installation
REINFORCEMENT
Reinstatement of bollards
Reinstatement of drainage layer (250 mm)
Reinstatement of interlocking pavement with bedding sand
Removal of existing paving tiles
Repair for ductbank
Repairs to finished works
Riprap Protection Works
Riprap Works
Roof preparation for lw concrete
Roof screed 100 mm thick
Screed works including preparation
Sewerage/Storm Pipe Laying 3 - 9 mtr (GRP)
Sewerage/Storm Pipe Laying 3 - 9 mtr (uPVC)
Shaping of sloped earth for blinding for bases including compaction
Shaping of Soil Blinding
Shutter fix column necks
shutter Fix for pile caps
shutter fix tie beams
Shutter make column necks
Shutter make tie beams
shutter Manufacture for pile caps
Site cleaning
Site Clearing and Grubbing
Site mixing of ready mix for distribution Hand mix
Solid blockwork
Solid Blockwork as Raft forms
Stacking of formwork
Staircase formwork deshuttering
staircase formwork fixing
Staircase formwork making
Steel cutting and bending 18.25 mm
Steel cutting and bending 8 - 16 mm
Store (small area)
suspended slab formwork deshutter
suspended slab formwork fixing
Temporary support for crossing utilities (ductbank or chilled water line)
TILING WORK
transition slab reinstatement (380 mm)
Trial pit
Unloading reinforcement ((Flat Bed Truck)
Vertical sealant (12 mm)
Wall + Floor Tile
Wall + Floor Tile
Wall formwork deshuttering
Wall Tile
Wall Tile
Wall Tile
Wall Tile
Walls shutter fixing
Walls shutter making
Water bar fixing