GENERAL KEY PLAN:


N
N

QIB
QIB LA
LA

DRY UTILITY TUNNEL

WET UTILITY TUNNEL


E 750320.650 E 750386.968
NOTES:
N 3052629.903 N 3052662.822
1. ALL DIMENSIONS ARE IN METERS UNLESS NOTED OTHERWISE.
2. ALL COORDINATES SHOWN ARE RELATIVE TO UTM-WGS84 ZONE 36 NORTH
FIRE STAIR
201.12 COORDINATE SYSTEM.
3. ALL ELEVATIONS PROVIDED ARE RELATIVE TO EGM 2008 DATUM.
4. FURTHER DATA COLLECTION AND VALIDATION OF ANY DATA PROVIDED
ALONG WITH UTILITY SURVEYS / GEOPHYSICAL SURVEYS SHALL BE UNDER
D&B CONTRACTOR SCOPE OF WORKS AND D&B CONTRACTOR SHALL
MV SWITCHGEAR AND DEVELOP THE DESIGN BASED ON LATEST INFORMATION AND DATA.
STARTER ROOM GLAZED 5. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH ALL
201.9 IWS - 205 RAF. 101 FLOOR PANEL
BATTERY ROOM 222 m² ABOVE ARCHITECTURAL, STRUCTURAL, MEP AND HVAC DRAWINGS.
201.8 TX ROOM 6. D&B CONTRACTOR TO COORDINATE SSJV AND USE LATEST INFORMATION
D 201.11 CONTROL ROOM
54 m² FOR EXTERNAL NETWORK ACCORDINGLY UPDATE THE TIE IN CONNECTION.
127 m² 201.13
60 m²
FL - 901

ELEC PROCESS SERVER ROOM


NOT FOR CONSTRUCTION
201.10 201.14 REFERENCE NUMBER DESCRIPTION
MV RMU ROOM 10 m² 17 m²
03-151340-2500001522-MMD-INF-MDL-700002 MEDIUM VOLTAGE NETWORK
201.7
111 m² PROC COMMS
201.15
4m 8m 12m 16m 20m
C:\Users\ELA91542\ACCDocs\Mott MacDonald\413102075-001 - NEOM Water Oxagon DCP\02_Civil & Infrastructure\02 Drawings\03-151340-2500001522-MMD-INF-DRG-705002.dwg

9 m²
0m
SEE MEP DRAWINGS

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF NEOM. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT FROM NEOM.
ICT FOR PLANT
BLK - 301 WITH
LINTEL OVERHEAD 201.16 EQUIPMENT LAYOUT VISUAL SCALE 1:200 @ A1
TO FORM OPENING 9 m²
STAGE:

STAGE 3A - CONCEPT DESIGN


PROPOSED 13.8kV TIE-IN WITH MEP
BOH ROOM
201.6
21 m²

MAGWAY TUNNEL
INCOMER AND METERING B STAGE 3A - CONCEPT DESIGN F.S. 03.02.23
ROOM A CONCEPT DESIGN F.S. 05.12.22
201.5 REV DESCRIPTION APP DATE
109 m²
C PURPOSE OF ISSUE:

BLK - 301 WITH STRATIFIED CHW FOR INFORMATION


LINTEL OVERHEAD TES TANK CHILLER HALL
TO FORM OPENING 201.17 CLIENT: PROJECT MANAGEMENT CONSULTANT:
FOOTPRINT - 665 m² 1199 m²
VOLUME - 18,954 m³
3 NUMBERS 13.8kV 3Cx500mm² RADIUS - 14.55 m
AL/XLPE/DSTA/PVC RINGS (6 CABLES) FROM HEIGHT - 28.5 m
33/13.8kV SUBSTATION

DRS-301

DESIGN CONSULTANT NAME & LOGO (s): CONTRACTOR NAME & LOGO (s):
STR - 301 12.000
S/BY GENERATOR ROOM
201.4 BAL - 105
46 m²

UP STAIR 3 IWS - 115


SECURITY CONTROL Festival Tower
DRS-301
201.2 Dubai Festival City
13 m² Dubai, UAE
CUSTOMER RELATIONS OFFICE
201.3 T +971 (0)4 206 9111
13 m² DRS-301 dubai@mottmac.com www.mottmac.com
INS - 205 RAF. 101 DESIGN CONSULTANT / CONTRACTOR: NEOM'S REVIEW:
B IWS - 115 INS - 205, FL - 701, FOC ICT ELEC GOODS LIFT
LIN 601 TO ALL 201.25 201.24 201.23 201.18
DRS-301 WCS 9 m² 9 m² DRAWN: A.E. 03.02.23
9 m²
CHECKED: N.T. 03.02.23 CHECKED: XXX DD.MM.YY

EVENTS MEETING ROOM F APPROVED: F.S. 03.02.23 APPROVED: XXX DD.MM.YY


201.27 201.26
SECURE LOBBY
34 m²
201.1
64 m² FX - 901 SCALE: 1:200 SHEET SIZE: A1
DISCIPLINE NAME:
BAL. 101
INFRASTRUCTURE
DRS-301 SERVER
M REFUSE
IWS - 205 RAF. 101 201.22 201.21
6 m²
201.20
21 m² DR-211 MEDIUM VOLTAGE LAYOUT
SEQUENCE 1
PROJECT NAME:

E 750351.805 E 750417.976 NEOM WATER OXAGON DCP


N 3052567.135 N 3052599.980

03-OXAGON
NEOM
A
LEGEND: KINGDOM OF SAUDI ARABIA
PROJECT BOUNDARY
MEDIUM VOLTAGE BY OTHERS REGION ASSET CODE CONTRACT CODE
02/02/2023 5:34:47 PM

PROPOSED MEDIUM VOLTAGE CABLES

ADDITIONAL NOTES:
03 151340 2500001522
1. FIBER OPTIC CABLES SHALL BE LAID IN ACCORDANCE WITH LATEST DRAWING NUMBER
SEC-SDCS-02 CONSTRUCTION STANDARD.
MEDIUM VOLTAGE LAYOUT 2. ALL WORKS SHALL BE AS PER LATEST RELEVANT AUTHORITY
ORIGINATOR DISCIPLINE DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.
SCALE 1:200
STANDARDS AND SPECIFICATION.
MMD INF DRG 705002 B
NEOM-NEN-PRC-010_TMP02_02.00