Booklet 09 Sep 2024
Booklet 09 Sep 2024
Booklet 09 Sep 2024
UNIT PLC
Unit 4 & 5 (Green Belt Facing) Rs. 1,000 PER SQ. FT.
Unit 3 (Near Lift) Rs. 500 PER SQ. FT.
PAYMENT PLAN
At the time of booking 10% of TSP On Start of 16th Floor roof 5% of TSP
Within 30 days of booking 15% of TSP On Start of 20th Floor roof 5% of TSP
On Start of foundation work 5% of TSP On Start of 24th Floor roof 5% of TSP
On Start of lower basement roof 5% of TSP On Start of 26th Floor roof 5% of TSP
On Start of upper basement roof 5% of TSP On Start of External paint 5% of TSP
On Start of stilt Floor roof 5% of TSP On Start of External Windows 5% of TSP
On Start of 4th Floor roof 5% of TSP On Start of tower common area 5% of TSP
On Start of 8th Floor roof 5% of TSP On Offer of Possession 5% of TSP +
On Start of 12th Floor roof 5% of TSP Possession Charges
OTHER CHARGES
- GST AS APPLICABLE (5%)
- EXTRA PARKING SLOT (MECHANICAL) CHARGEABLE OF Rs. 500000/-
- HANDOVER CHARGES TO BE PAID BY THE APPLICANT
(AS APPLICABLE ON OFFER OF POSSESSION)
NOTE: TUC STANDS FOR TOTAL UNIT COST