March 2023 Lab. Monthly Report

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 64

Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector

Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project


It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road

ECDSWCTDSWS Laboratory Monthly Report ETHIOPIAN ROADS


Consultants ADMINISTRATION

Reporting Period May 25,2022 to June 24/2023

APPENDIX 5 - LABORATORY AND INSITU TESTING OF ROADWAY AND CONSTRUCTION MATERIALS

APPENDIX 5.1 - ROAD BED MATERIALS LABORATORY TEST RESULTS

APPENDIX 5.2 - ESISTING ROAD BED, EMBANKMENT FILL, SUB BASE & BASE COURSE MATERIALS LABORATORY TEST RESULTS

APPENDIX 5.3 - BORROW MATERIALS LABORATORY TEST RESULTS

APPENDIX 5.4 - CAPPING MATERIALS LABORATORY TEST RESULTS

APPENDIX 5.5 - SUB BASE MATERIALS LABORATORY TEST RESULTS

APPENDIX 5.6 - SUB BASE AFTER COMPACTION MATERIALS LABORATORY TEST RESULTS

APPENDIX 5.7 - BASE COURSE MATERIALS LABORATORY TEST RESULTS

APPENDIX 5.8 - BASE COURSE AFTER COMPACTION MATERIALS LABORATORY TEST RESULTS

APPENDIX 5.9 - COARSE AGGREGATE FOR CONCRETE LABORATORY TEST RESULTS

APPENDIX 5.10- FINE AGGREGATE (CRUSHED SAND) FOR CONCRETE LABORATORY TEST RESULTS

APPENDIX 5.11 - MASONARY STONE LABORATORY TEST RESULTS

APPENDIX 5.12- CONCRETE MIX DESIGN LABORATORY TEST RESULTS

APPENDIX 5.13 - SITE CONCRETE MATERIALS LABORATORY TEST RESULTS

APPENDIX 5.14 - REINFORCEMENT BAR LABORATORY TEST RESULTS

APPENDIX 5.15 - QUALITY OF WATER LABORATORY TEST RESULTS

APPENDIX 5.16 - FDT FOR ROAD BED MATERIALS LABORATORY TEST RESULTS
APPENDIX 5.17 - FDT FOR UNDER CUT REPLACEMENT FILL MATERIALS LABORATORY TEST RESULTS

APPENDIX 5.18 - FDT FOR EMBANKMENT FILL MATERIALS LABORATORY TEST RESULTS

APPENDIX 5.19 - FDT FOR SUB GRADE MATERIALS LABORATORY TEST RESULTS

APPENDIX 5.20 - FDT FOR CAPPING MATERIALS LABORATORY TEST RESULTS

APPENDIX 5.21 - FDT FOR SUB BASE MATERIALS LABORATORY TEST RESULTS

APPENDIX 5.22 - FDT FOR BASE COURSE MATERIALS LABORATORY TEST RESULTS

APPENDIX 5.23 - FDT FOR BACK FILL MATERIALS LABORATORY TEST RESULTS

Prepared By Lab. Tech. Checked By PME

Name Name

Signature Signature

Date Date
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector

Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project

It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road
Ethiopian Road Adminstration
ECDSWCTDSWS Consultants
APPENDIX 5.1 - ROAD BED MATERIALS LABORATORY TEST RESULTS
Reporting Period May 25,2022 to June 24/2023

Classification
CBR Sieve Analysis

AASHTO Soil
Reprenting
Atterberg Limit (%) Proctor
Station % Passing Sieves
Sampling
No. Side Testing Date Visual Description Swell (mm) Remark

Depth (m)
Station at 95%

Lab No.
MDD
From To LL PL PI MDD OMC 2.00 0.425 0.075

Returned
Project Requirement / Specification Max. 60 - Max. 30 Min. 3 Max. 3 - - - - - Acceptance
back

1 0+000 0+430 RHS Pit 0+210 RHS 6 February 4, 2023 Clayey Soils 62.2 37.0 25.0 2.2 3.83 1.556 22.0 97.2 94.0 90.8 A-7-5(29) Unsuitable Yes
2 0+430 0+680 RHS pit 0+530 RHS 7 February 4, 2023 Clayey Soils 71.0 36.0 35.0 0.7 5.46 1.561 19.5 98.9 95.8 94.0 A-7-5(41) Unsuitable Yes
0.00 -
37.0 10.0 28.0 15.0 2.90 1.686 17.4 75.1 69.7 66.6 A-6(15) Suitable Yes
2.6M
3 0+620 0+680 LHS 0+630 43 May 24, 2023 Clayey Soils
2.6 -
52.0 26.0 26.0 2.6 4.95 1.516 22.3 99.9 99.7 98.8 A-7-6(30) Unsuitable Yes
3.3 M
4 0+680 0+860 RHS pit 0+780 RHS 8 February 4, 2023 Clayey Soils 61.8 39.0 23.0 1.8 4.14 1.374 21.0 99.4 97.9 95.3 A-7-5(29) Unsuitable Yes
5 0+860 1+100 RHS pit 1+930 RHS 4 December 22, 2022 Clayey Soils 58.0 33.5 25.0 8.2 1.30 1.494 25.2 100.0 100.0 99.0 A-7-5(31) Suitable Yes
6 1+100 1+300 RHS pit 1+140 RHS 5 December 22, 2022 Clayey Soils 58.5 45.7 13.0 7.0 0.80 1.443 27.5 100.0 96.0 91.0 A-7-5(19) Suitable Yes
7 1+300 1+740 RHS pit 1+520 LHS 3 December 21, 2022 Clayey Soils 56.0 33.3 23.0 5.2 1.70 1.495 28.5 99.0 98.0 97.0 A-7-5(28) Suitable Yes
8 0+000 0+250 LHS pit 0+220 LHS 1 December 22, 2022 Clayey Soils 52.0 32.0 20.0 5.8 1.60 1.577 19.5 99.0 97.0 93.0 A-7-5(0) Suitable Yes
9 0+250 0+600 LHS pit 0+400 LHS 2 December 22, 2022 Clayey Soils 77.0 35.2 41.0 1.0 6.60 1.629 16.5 99.0 96.0 95.0 A-7-6(23) UnSuitable Yes
10 0+600 1+100 LHS pit 0+840 LHS 10 February 11, 2023 Clayey Soils 58.0 34.0 24.0 7.5 1.22 1.490 24.4 89.9 86.8 84.8 A-7-5(25) Suitable Yes
11 1+100 1+740 LHS pit 1+400 LHS 3660 December 19, 2022 Clayey Soils 57.0 32.6 24.4 10.0 0.75 1.390 34.4 99.9 99.1 98.0 A-7-5(30) Suitable Yes

Prepared By Material Inspector/ Lab. Tech. Checked By PME

Name Name

Signature Signature

Date Date
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector

Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project

It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road
Ethiopian Road Adminstration
ECDSWCTDSWS Consultants
APPENDIX 5.2 - ESISTING ROAD BED, EMBANKMENT FILL, SUB BASE & BASE COURSE MATERIALS LABORATORY TEST RESULTS
Reporting Period May 25,2022 to June 24/2023

Classification
CBR Sieve Analysis

AASHTO Soil
Reprenting
Atterberg Limit (%) Proctor TFV (%)
Station % Passing Sieves Linear
Sampling
No. Purpose Side Testing Date Visual Description Swell (mm) FI (%) ACV GM Shrinkag Remark

Depth (m)
Station
at 95% e (LS)

Lab No.
MDD
From To LL PL PI MDD OMC 2.00 0.425 0.075 Dry Wet Wet/ Dry

Returned
Project Requirement / Specification Max. 60 - Max. 30 Min. 3 Max. 3 - - - - - ≥1.5 Max 6 Acceptance
back

-
Existing
1 0+000 0+080 CL Pit 0+050 CL 45 June 7, 2023 Clayey Soils 53.0 27.0 27.0 5.5 0.57 1.561 27.0 98.9 98.2 96.9 - - - - - - - A-7-6(30) Suitable Yes
Median

Existing
3 0+000 0+500 CL 1.50 0+050 LHS 36 May 20, 2023 Clayey Soils 49.0 24.0 24.0 6.5 1.35 1.513 26.2 91.8 90.5 88.6 - - - - - - - A-7-6(24) Suitable Yes
Road bed

Existing
4 0+500 0+900 CL 1.50 0+500 LHS 37 May 17, 2023 Clayey Soils 51.0 29.0 22.0 3.6 3.45 1.498 24.5 98.3 97.6 96.3 - - - - - - - A-7-6(26) Unsuitable Yes
Road bed

Existing
5 0+500 0+900 CL 1.50 0+780 LHS 46 June 7, 2023 Silty Clayey Soils 60.0 36.0 24.0 1.0 4.10 1.498 27.6 99.6 99.3 98.6 - - - - - - - A-7-5(30) Unsuitable Yes
Road bed

Existing
Silty or Clayey Gravel
6 Embankment 0+000 1+740 CL pit 0+500 LHS 47 June 7, 2023 NP NP NP 70.0 0.08 1.790 15.8 54.7 39.1 23.4 - - - - - - - Suitable Yes
and Sand
fill

Silty Clayey Material


Existing Sub
7 0+000 0+500 CL pit 0+050 LHS 45 June 4, 2023 (Cinder blended with 24.0 19.0 5.0 29.4 0.79 1.774 12.8 50.1 62.3 70.9 - - - - - 1.83 1.0 A-4(2) Unsuitable Yes
base
borrow material)

Silty Clayey Material


Existing Sub
8 0+500 0+900 CL pit 0+500 LHS 43 June 1, 2023 (Cinder blended with 34.0 25.0 9.0 21.0 0.98 1.729 17.0 40.8 26.2 15.0 - - - - - 2.18 4.0 A-4(8) Unsuitable Yes
base
borrow material)

Silty Clayey Material


Existing Sub
9 0+900 1+500 CL pit 1+000 LHS 44 June 5, 2023 (Cinder blended with 31.0 19.0 12.0 24.0 0.38 1.715 16.0 40.7 23.0 14.1 - - - - - 2.22 2.0 A-4(8) Unsuitable Yes
base
borrow material)

Silty Clayey Material


Existing Sub
10 1+500 1+740 CL pit 1+500 LHS 37 June 3, 2023 (Cinder blended with 34.0 25.0 10.0 22.0 0.88 1.811 16.7 54.0 33.0 23.0 - - - - - 1.90 4.0 A-4(8) Unsuitable Yes
base
borrow material)

Existing
11 0+000 1+740 CL pit 0+500 LHS 35 March 27, 2023 Crushed Base course NP NP NP 52.0 0.05 2.207 4.3 19.0 8.8 4.9 33.0 340.0 260.0 76.0 17.0 - - A-4(8) Suitable Yes
Base course

Prepared By Material Inspector/ Lab. Tech. Checked By PME

Name Name

Signature Signature

Date Date
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector
Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project
It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road
Ethiopian Road Adminstration
ECDSWCTDSWS Consultants

APPENDIX 5.16 - FDT FOR ROAD BED MATERIALS LABORATORY TEST RESULTS
Reporting Period May 25,2022 to June 24/2023
Representative Section Material Sources Average Remark
Degree of
Test Pit Degree of

FMC
Side

FDD
No. RFI No. Date Tested Purpose For Compaction
Station Compaction Returned Acceptanc
From To Side Chainage MDD OMC (Min. 95%)
(Min. 95%) back e

28+500-29+000 FW 28+860

1+100 RHS 1.431 26.5 96


Existing 0+500 - 1+000 96
1 00022 January 2, 2023 Road bed 0+940 1+100 RHS 1.494 25.2 Yes Pass
RHS
1+080 LHS 1.441 26.5 96

0+880 CL 1.420 24.7 95


Existing 0+500 - 1+000 95
2 00056 February 14, 2023 Road bed 0+860 0+940 RHS 1.494 25.2 Yes Pass
RHS
0+920 RHS 1.425 25.1 95

1+160 CL 1.381 28.3 96


Existing 1+000 - 1+500 96
3 00024 February 1, 2023 Road bed 1+100 1+260 RHS 1.443 27.5 Yes Pass
RHS
1+220 RHS 1.385 28.7 96

0+880 CL 1.420 24.7 95


Existing 0+500 - 1+000 95
4 00037 February 14, 2023 Road bed 0+860 0+940 RHS 1.494 25.2 Yes Pass
RHS
0+920 RHS 1.425 25.1 95

0+180 LHS 1.529 24.7 97


Existing 1+000 - 1+500 98
5 00424 April 6, 2023 Road bed 0+140 0+250 LHS 1.577 19.5 Yes Pass
LHS 100
0+220 CL 1.576 25.1

Existing 1+000 - 1+500 99 99


6 00423 April 6, 2023 Road bed 0+060 0+100 LHS 1.577 19.5 0+075 RHS 1.557 14.9 Yes Pass
LHS

Existing 0+500 - 1+000 103 103


7 00544 April 26, 2023 Road bed 0+880 0+940 LHS 1.490 24.4 0+910 LHS 1.532 24.7 Yes Pass
LHS

Existing 0+500 - 1+000 102 102


8 00567 April 28, 2023 Road bed 0+700 0+780 LHS 1.490 24.4 0+750 LHS 1.518 23.9 Yes Pass
LHS

Existing 0+500 - 1+000 102 102


9 00600 May 2, 2023 Road bed 0+780 0+880 LHS 1.490 24.4 0+830 LHS 1.513 23.8 Yes Pass
LHS

Existing 0+500 - 1+000 102 102


10 00543 April 26, 2023 Road bed 0+700 0+780 LHS 1.490 24.4 0+750 LHS 1.518 23.9 Yes Pass
LHS

Prepared By Lab. Tech. Checked By PME

Name Name

Signature Signature

Date Date
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector
Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project
It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road
Ethiopian Road Adminstration
ECDSWCTDSWS Consultants
APPENDIX 5.3 - BORROW MATERIALS LABORATORY TEST RESULTS
Reporting Period May 25,2022 to June 24/2023

Quality Requirement

Classification
AASHTO Soil
Depth (m)
Sieve Analysis

Lab No.
Samplin Testing Date CBR
No. g Side Offset Visual Description
Station Atterberg Limit (%) Proctor
Swell % Passing Sieves Remark
at 95% (mm)
MDD
LL PL PI MDD OMC 2.00 0.425 0.075
where no capping Max. 60 - Max. 30 Min. 8 Max. 2 - - - - - -
or selected layer
Project Requirement / Specification
where there is capping Returned
Max. 60 - Max. 30 Min. 5 Max. 2 - - - - - - Acceptance
or selected layer back

Need to
1 0+600 LHS 950 pit 9 December 21, 2022 Silt or Clayey Gravel and Sand 48.0 33.5 15.0 28.0 1.2 1.415 23.5 44.0 27.0 15.0 A-2-7 Yes
produce stock

2 0+600 LHS 950 Stock 9(2) February 12, 2023 Silt or Clayey Gravel and Sand 52.0 30.0 22.0 21.8 1.1 1.468 20.0 86.7 56.2 35.3 A-7-6(3) Suitable Yes

Prepared By Material Inspector/ Lab. Tech. Checked By PME

Name Name

Signature Signature

Date Date
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector

Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project

It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road

Ethiopian Road Adminstration

ECDSWCTDSWS Consultants

APPENDIX 5.17 - FDT FOR UNDER CUT REPLACEMENT FILL MATERIALS LABORATORY TEST RESULTS

Reporting Period May 25,2022 to June 24/2023

Representative Section Material Sources Average Remark


Degree of
Degree of
Test Pit Compactio

FMC
Side

FDD
No. RFI No. Date Tested Purpose For Layer Compactio
Station n (Min.

From
n (Min. Returned Acceptanc

To
Side Chainage MDD OMC 95%) back e
95%)

Under cut 0+780 CL 1.463 18.0 99


0+600 LHS Offset 98
1 000081 February 23, 2023 Replacement 1st layer 0+740 0+860 RHS 1.483 18.5 Yes Pass
950m
Material 0+820 RHS 1.430 18.2 96

Under cut 0+770 LHS 1.422 18.1 96


0+600 LHS Offset 98
2 000193 February 27, 2023 Replacement 2nd layer 0+740 0+860 RHS 1.483 18.5 Yes Pass
950m
Material 0+810 CL 1.478 17.6 100

Under cut 0+770 LHS 1.427 17.0 96


0+600 LHS Offset 97
3 000114 March 1, 2023 Replacement 3rd layer 0+740 0+860 RHS 1.483 18.5 Yes Pass
950m
Material 0+810 CL 1.447 17.1 98

Under cut 0+770 Rrhs 1.445 17.3 97


0+600 LHS Offset 97
4 000134 March 3, 2023 Replacement 1st layer 0+740 0+860 RHS 1.483 18.5 Yes Pass
950m
Material 0+820 lhs 1.440 17.0 97

Under cut 0+560 LHS 1.484 17.3 100


0+600 LHS Offset 100
5 000142 March 4, 2023 Replacement 1st layer 0+520 0+660 RHS 1.483 18.5 Yes Pass
950m
Material 0+610 RHS 1.491 17.0 101

Under cut 0+560 RHS 1.444 16.0 97


0+600 LHS Offset 97
6 000155 March 7, 2023 Replacement 2nd layer 0+520 0+660 RHS 1.483 18.5 Yes Pass
950m
Material 0+630 LHS 1.424 17.0 96

0+440 RHS 1.429 18.1 96


Under cut
0+600 LHS Offset 95 96
7 000169 March 9, 2023 Replacement 1st layer 0+400 0+520 RHS 1.483 18.5 0+460 LHS 1.411 18.1 Yes Pass
950m
Material
0+510 CL 1.426 17.8 96
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector

Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project

It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road

Ethiopian Road Adminstration

ECDSWCTDSWS Consultants

APPENDIX 5.17 - FDT FOR UNDER CUT REPLACEMENT FILL MATERIALS LABORATORY TEST RESULTS

Reporting Period May 25,2022 to June 24/2023

Representative Section Material Sources Average Remark


Degree of
Degree of
Test Pit Compactio

FMC
Side

FDD
No. RFI No. Date Tested Purpose For Layer Compactio
Station n (Min.

From
n (Min. Returned Acceptanc

To
Side Chainage MDD OMC 95%) back e
95%)

0+280 LHS 1.442 17.3 97

Under cut 0+360 CL 1.434 18.3 97


0+600 LHS Offset 96
8 000172 March 9, 2023 Replacement 1st layer 0+250 0+580 LHS 1.483 18.5 Yes Pass
950m
Material 0+440 LHS 1.408 18.2 95

0+520 CL 1.411 16.2 95

0+370 RHS 1.408 18.1 95

Under cut 0+430 LHS 1.449 18.1 98


0+600 LHS Offset 96
9 000180 March 10, 2023 Replacement 2nd layer 0+250 0+580 LHS 1.483 18.5 Yes Pass
950m
Material 0+500 CL 1.411 17.8 95

0+570 RHS 1.411 17.4 95

0+550 LHS 1.407 17.7 95


Under cut
0+600 LHS Offset 95
10 000183 March 11, 2023 Replacement 3rd layer 0+520 0+660 RHS 1.483 18.5 Yes Pass
950m
Material 95
0+620 CL 1.412 18.2

0+430 LHS 1.463 18.1 99


Under cut
0+600 LHS Offset 101 99
11 000184 March 11, 2023 Replacement 2nd layer 0+400 0+520 RHS 1.483 18.5 0+460 CL 1.494 18.1 Yes Pass
950m
Material
0+500 RHS 1.451 17.4 98

Under cut 1+200 RHS 1.432 18.8 97


0+600 LHS Offset 98
12 000197 March 13, 2023 Replacement 7th layer 1+180 1+260 RHS 1.483 18.5 Yes Pass
950m 99
Material 1+250 CL 1.464 16.5
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector

Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project

It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road

Ethiopian Road Adminstration

ECDSWCTDSWS Consultants

APPENDIX 5.17 - FDT FOR UNDER CUT REPLACEMENT FILL MATERIALS LABORATORY TEST RESULTS

Reporting Period May 25,2022 to June 24/2023

Representative Section Material Sources Average Remark


Degree of
Degree of
Test Pit Compactio

FMC
Side

FDD
No. RFI No. Date Tested Purpose For Layer Compactio
Station n (Min.

From
n (Min. Returned Acceptanc

To
Side Chainage MDD OMC 95%) back e
95%)

0+440 LHS 1.403 19.3 95

Under cut
0+600 LHS Offset 98 97
13 000203 March 14, 2023 Replacement 3rd layer 0+400 0+520 RHS 1.483 18.5 0+460 CL 1.449 20.3 Yes Pass
950m
Material

0+500 RHS 1.465 16.6 99

Under cut
0+600 LHS Offset 100 100
14 000204 March 14, 2023 Replacement 1st layer 0+360 0+400 RHS 1.483 18.5 0+380 RHS 1.490 18.5 Yes Pass
950m
Material
Under cut
0+600 LHS Offset 98 98
15 000218 March 18, 2023 Replacement 2nd layer 0+360 0+400 RHS 1.483 18.5 0+380 RHS 1.451 18.8 Yes Pass
950m
Material

0+450 LHS 1.447 20.3 98


Under cut
0+600 LHS Offset 98
16 000215 March 18, 2023 Replacement 4th layer 0+400 0+520 RHS 1.483 18.5 Yes Pass
950m
Material
0+500 CL 1.473 19.6 99

0+470 LHS 1.429 19.0 96


Under cut
0+600 LHS Offset 96
17 000230 April 19, 2023 Replacement 5th layer 0+400 0+520 RHS 1.483 18.5 Yes Pass
950m
Material
0+510 RHS 1.431 16.4 96

Under cut
0+600 LHS Offset 95 95
18 000229 March 19, 2023 Replacement 3rd layer 0+360 0+400 RHS 1.483 18.5 0+380 CL 1.407 19.4 Yes Pass
950m
Material
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector

Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project

It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road

Ethiopian Road Adminstration

ECDSWCTDSWS Consultants

APPENDIX 5.17 - FDT FOR UNDER CUT REPLACEMENT FILL MATERIALS LABORATORY TEST RESULTS

Reporting Period May 25,2022 to June 24/2023

Representative Section Material Sources Average Remark


Degree of
Degree of
Test Pit Compactio

FMC
Side

FDD
No. RFI No. Date Tested Purpose For Layer Compactio
Station n (Min.

From
n (Min. Returned Acceptanc

To
Side Chainage MDD OMC 95%) back e
95%)

Under cut
0+600 LHS Offset 96 96
19 000253 March 22, 2023 Replacement 4th layer 0+360 0+400 RHS 1.483 18.5 0+380 LHS 1.423 20.8 Yes Pass
950m
Material
Under cut
0+600 LHS Offset 97 97
20 000228 March 26, 2023 Replacement 5th layer 0+360 0+400 RHS 1.483 18.5 0+380 RHS 1.437 20.1 Yes Pass
950m
Material

1+440 LHS 1.499 18.4 101

Under cut 1+510 RHS 1.468 19.1 99


0+600 LHS Offset 100
21 000312 March 28, 2023 Replacement 1st layer 1+400 1+640 RHS 1.483 18.5 Yes Pass
950m 102
Material 1+550 CL 1.510 18.8

1+610 RHS 1.450 19.3 98


Under cut
0+600 LHS Offset 97 97
22 000427 April 6, 2023 Replacement 1st layer 0+250 0+300 LHS 1.483 18.5 0+280 LHS 1.445 17.7 Yes Pass
950m
Material
Under cut
0+600 LHS Offset 95 95
23 000452 April 8, 2023 Replacement 2nd layer 0+250 0+300 LHS 1.483 18.5 0+280 RHS 1.415 19.0 Yes Pass
950m
Material
Under cut
0+600 LHS Offset 113 113
24 000453 April 8, 2023 Replacement 1st layer 0+700 0+740 RHS 1.483 18.5 0+760 LHS 1.675 18.5 Yes Pass
950m
Material
Under cut
0+600 LHS Offset 108 108
25 000463 April 9, 2023 Replacement 2nd layer 0+700 0+740 RHS 1.483 18.5 0+720 CL 1.608 20.0 Yes Pass
950m
Material
Under cut
0+600 LHS Offset 105 105
26 000474 April 10, 2023 Replacement 3rd layer 0+250 0+300 LHS 1.483 18.5 0+250 LHS 1.555 19.7 Yes Pass
950m
Material
Under cut
0+600 LHS Offset 98 98
27 000514 April 22, 2023 Replacement 3rd layer 0+250 0+300 LHS 1.483 18.5 0+720 LHS 1.454 19.5 Yes Pass
950m
Material
Under cut
0+600 LHS Offset 103 103
28 000535 April 25, 2023 Replacement 5th layer 0+250 0+300 LHS 1.483 18.5 0+270 RHS 1.522 17.0 Yes Pass
950m
Material
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector

Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project

It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road

Ethiopian Road Adminstration

ECDSWCTDSWS Consultants

APPENDIX 5.17 - FDT FOR UNDER CUT REPLACEMENT FILL MATERIALS LABORATORY TEST RESULTS

Reporting Period May 25,2022 to June 24/2023

Representative Section Material Sources Average Remark


Degree of
Degree of
Test Pit Compactio

FMC
Side

FDD
No. RFI No. Date Tested Purpose For Layer Compactio
Station n (Min.

From
n (Min. Returned Acceptanc

To
Side Chainage MDD OMC 95%) back e
95%)

Under cut 0+350 LHS 1.479 20.2 100


Replacement 0+600 LHS Offset 99
29 000680 May 10, 2023 1st layer 0+300 0+420 LHS 1.483 18.5 Yes Pass
Longitudinal 950m
Side Drainage 0+400 RHS 1.454 20.2 98
Under cut
Replacement 0+600 LHS Offset 98 98
30 000702 May 12, 2023 2nd layer 0+340 0+420 LHS 1.483 18.5 0+370 RHS 1.460 20.0 Yes Pass
Longitudinal 950m
Side Drainage
Under cut
Replacement 0+600 LHS Offset 99 99
31 000764 May 18, 2023 3rd layer 0+310 0+420 LHS 1.483 18.5 0+380 LHS 1.462 19.8 Yes Pass
Longitudinal 950m
Side Drainage
Under cut 0+460 LHS 1.460 18.3 98
Replacement 0+600 LHS Offset 99
32 000793 May 23, 2023 Final layer 0+420 0+580 LHS 1.483 18.5 Yes Pass
Longitudinal 950m
0+520 RHS 1.480 20.5 100
Side Drainage

Prepared By Lab. Tech. Checked By PME

Name Name

Signature Signature

Date Date
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector

Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project

It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road

Ethiopian Road Adminstration

ECDSWCTDSWS Consultants

APPENDIX 5.18 - FDT FOR EMBANKMENT FILL MATERIALS LABORATORY TEST RESULTS

Reporting Period May 25,2022 to June 24/2023

Representative Section Material Sources Average Remark


Degree of
Degree of
Test Pit Compactio

FMC
Side

FDD
No. RFI No. Date Tested Purpose For Layer Compactio
Station n (Min.

From
n (Min. Returned

To
Side Chainage MDD OMC 95%) back
Acceptance
95%)

0+600 LHS 1+050 LHS 1.405 18.3 96


1 000030 February 5, 2023 Embankment fill 1st layer 0+940 1+100 RHS 1.468 20.0 96 Yes Pass
Offset 950m 0+950 LHS 1.417 19.2 97

0+600 LHS 0+150 RHS 1.397 18.4 95


2 000033 February 6, 2023 Embankment fill 1st layer 1+100 1+260 RHS 1.468 20.0 96 Yes Pass
Offset 950m 1+210 LHS 1.416 19.9 96

0+600 LHS 1+060 RHS 1.448 18.5 99


3 000039 February 7, 2023 Embankment fill 2nd layer 0+940 1+100 RHS 1.468 20.0 99 Yes Pass
Offset 950m 0+970 RHS 1.465 19.8 100

0+600 LHS 1+130 LHS 1.434 18.3 98


4 000043 February 8, 2023 Embankment fill 2nd layer 1+100 1+260 RHS 1.468 20.0 97 Yes Pass
Offset 950m 1+195 CL 1.413 18.1 96

0+600 LHS 0+960 RHS 1.423 19.8 97


5 000046 February 9, 2023 Embankment fill 3rd layer 0+940 1+100 RHS 1.468 20.0 97 Yes Pass
Offset 950m 0+980 LHS 1.428 20.1 97

0+600 LHS 1+130 LHS 1.487 20.0 101


6 000050 February 10, 2023 Embankment fill 3rd layer 1+100 1+180 RHS 1.468 20.0 102 Yes Pass
Offset 950m 1+160 CL 1.494 19.6 102

1+130 RHS 1.411 19.9 96

0+600 LHS 1+180 CL 1.397 19.3 95 96


7 000052 February 11, 2023 Embankment fill 1st layer 1+100 1+300 LHS 1.468 20.0 Yes Pass
Offset 950m
1+220 LHS 1.402 19.8 96
1+260 RHS 1.407 20.1 96

0+600 LHS 0+960 RHS 1.479 19.8 101


Offset 950m
8 000059 February 14, 2023 Embankment fill 4th layer 0+940 1+100 RHS (and Sampled 1.462 19.8 99 Yes Pass
from road way
after placing) 1+030 LHS 1.426 20.2 98
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector

Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project

It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road

Ethiopian Road Adminstration

ECDSWCTDSWS Consultants

APPENDIX 5.18 - FDT FOR EMBANKMENT FILL MATERIALS LABORATORY TEST RESULTS

Reporting Period May 25,2022 to June 24/2023

Representative Section Material Sources Average Remark


Degree of
Degree of
Test Pit Compactio

FMC
Side

FDD
No. RFI No. Date Tested Purpose For Layer Compactio
Station n (Min.

From
n (Min. Returned

To
Side Chainage MDD OMC 95%) back
Acceptance
95%)

1+190 CL 1.461 18.6 99


0+600 LHS 99
9 000065 February 15, 2023 Embankment fill 2nd layer 1+160 1+220 LHS 1.483 18.5 Yes Pass
Offset 950m
1+200 LHS 1.469 18.5 99

0+890 CL 1.412 18.6 95


0+600 LHS 97
10 000066 February 16, 2023 Embankment fill 1st layer 0+860 0+940 RHS 1.483 18.5 Yes Pass
Offset 950m
0+930 RHS 1.464 17.0 99

0+880 RHS 1.441 18.0 97


0+600 LHS 98
11 000069 February 17, 2023 Embankment fill 2nd layer 0+860 0+940 RHS 1.483 18.5 Yes Pass
Offset 950m
0+920 LHS 1.476 18.3 100

7th layer, 1+120 CL 1.480 18.2 100


0+600 LHS 100
12 000156 March 7, 2023 Embankment fill 12m offset 1+100 1+180 RHS 1.483 18.5 Yes Pass
Offset 950m
from cl 1+150 LHS 1.478 17.5 100

6th layer, 1+210 RHS 1.438 18.2 97


0+600 LHS 103
13 000157 March 7, 2023 Embankment fill 12m offset 1+180 1+260 RHS 1.483 18.5 Yes Pass
Offset 950m
from cl 1+220 LHS 1.629 17.5 110

8th layer, 1+130 CL 1.590 17.9 107


0+600 LHS 104
14 000196 March 13, 2023 Embankment fill 12m offset 1+100 1+180 RHS 1.483 18.5 Yes Pass
Offset 950m
from cl 1+160 RHS 1.504 16.2 101

0+870 LHS 1.453 17.9 98


0+600 LHS 97
15 000073 February 19, 2023 Embankment fill 3rd layer 0+860 0+940 RHS 1.483 18.5 Yes Pass
Offset 950m
0+910 RHS 1.436 18.2 97

1+130 RHS 1.512 17.4 102


0+600 LHS 102
16 000091 February 24, 2023 Embankment fill 4th layer 1+100 1+180 RHS 1.483 18.5 Yes Pass
Offset 950m
1+160 LHS 1.510 8.0 102
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector

Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project

It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road

Ethiopian Road Adminstration

ECDSWCTDSWS Consultants

APPENDIX 5.18 - FDT FOR EMBANKMENT FILL MATERIALS LABORATORY TEST RESULTS

Reporting Period May 25,2022 to June 24/2023

Representative Section Material Sources Average Remark


Degree of
Degree of
Test Pit Compactio

FMC
Side

FDD
No. RFI No. Date Tested Purpose For Layer Compactio
Station n (Min.

From
n (Min. Returned

To
Side Chainage MDD OMC 95%) back
Acceptance
95%)

3rd layer, 1+200 RHS 1.432 18.2 97


0+600 LHS 98
17 000092 February 24, 2023 Embankment fill 12m offset 1+180 1+260 RHS 1.483 18.5 Yes Pass
Offset 950m
from cl 1+240 LHS 1.471 18.1 99

1+210 RHS 1.432 18.8 97


0+600 LHS 98
18 000107 February 28, 2023 Embankment fill 4th layer 1+180 1+260 RHS 1.483 18.5 Yes Pass
Offset 950m
1+240 CL 1.471 18.7 99

0+560 RHS 1.502 17.0 101


0+600 LHS 101
19 000326 March 29, 2023 Embankment fill 6th layer 0+520 0+660 RHS 1.483 18.5 Yes Pass
Offset 950m
0+620 CL 1.484 20.0 100

5th layer, 1+200 RHS 1.454 17.9 98


0+600 LHS 103
20 000129 March 3, 2023 Embankment fill 12m offset 1+180 1+260 RHS 1.483 18.5 Yes Pass
Offset 950m
from cl 1+220 RHS 1.593 18.6 107

6th layer, 1+110 RHS 1.462 18.1 99


0+600 LHS 99
21 000134 March 3, 2023 Embankment fill 12m offset 0+110 1+180 RHS 1.483 18.5 Yes Pass
Offset 950m
from cl 1+510 CL 1.484 17.8 100

1+150 RHS 1.397 18.4 94


0+600 LHS 95
22 000033 February 6, 2023 Embankment fill 6th layer 1+100 1+260 RHS 1.483 18.5 Yes Pass
Offset 950m
1+210 LHS 1.416 19.9 95

0+570 RHS 1.443 20.0 97


0+600 LHS 99
23 000206 March 16, 2023 Embankment fill 6th layer 0+520 0+660 RHS 1.483 18.5 Yes Pass
Offset 950m
0+630 LHS 1.486 19.8 100

0+780 LHS 1.477 18.2 100


0+600 LHS 101
24 000202 March 17, 2023 Embankment fill 6th layer 0+740 0+860 RHS 1.483 18.5 Yes Pass
Offset 950m
0+820 CL 1.518 18.1 102

0+580 LHS 1.395 17.2 94


0+600 LHS 95
25 000220 March 18, 2023 Embankment fill 2nd layer 0+520 0+660 RHS 1.483 18.5 Yes Pass
Offset 950m
0+640 CL 1.437 17.2 97
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector

Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project

It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road

Ethiopian Road Adminstration

ECDSWCTDSWS Consultants

APPENDIX 5.18 - FDT FOR EMBANKMENT FILL MATERIALS LABORATORY TEST RESULTS

Reporting Period May 25,2022 to June 24/2023

Representative Section Material Sources Average Remark


Degree of
Degree of
Test Pit Compactio

FMC
Side

FDD
No. RFI No. Date Tested Purpose For Layer Compactio
Station n (Min.

From
n (Min. Returned

To
Side Chainage MDD OMC 95%) back
Acceptance
95%)

0+440 RHS 1.442 17.1 97


0+600 LHS 98
26 000232 March 20, 2023 Embankment fill 1st layer 0+340 0+580 LHS 1.483 18.5 Yes Pass
Offset 950m
0+540 LHS 1.458 20.6 98

0+550 CL 1.487 18.3 100


0+600 LHS 99
27 000231 March 20, 2023 Embankment fill 3rd layer 0+520 0+660 RHS 1.483 18.5 Yes Pass
Offset 950m
0+600 LHS 1.448 18.8 98

0+440 CL 1.411 20.8 95


0+600 LHS 96
28 000252 March 22, 2023 Embankment fill 1st layer 0+400 0+520 RHS 1.483 18.5 Yes Pass
Offset 950m
0+510 LHS 1.425 17.3 96

0+540 LHS 1.465 20.8 99


0+600 LHS 98
29 000251 March 22, 2023 Embankment fill 4th layer 0+520 0+660 RHS 1.483 18.5 Yes Pass
Offset 950m
0+600 CL 1.431 17.3 96

0+790 LHS 1.486 19.6 100


0+600 LHS 98
30 000258 March 24, 2023 Embankment fill 4th layer 0+520 0+660 RHS 1.483 18.5 Yes Pass
Offset 950m
0+810 RHS 1.432 20.4 97

0+580 LHS 1.467 16.8 99


0+600 LHS 102
31 000278 March 25, 2023 Embankment fill 5th layer 0+520 0+660 RHS 1.483 18.5 Yes Pass
Offset 950m
0+620 RHS 1.554 17.8 105

1+120 RHS 1.472 18.1 99


0+600 LHS 99
32 000108 February 28, 2023 Embankment fill 5th layer 1+100 1+180 RHS 1.483 18.5 Yes Pass
Offset 950m
1+160 CL 1.454 19.9 98

0+730 LHS 1.488 18.3 100


0+600 LHS 100
33 000290 March 27, 2023 Embankment fill 5th layer 0+740 0+860 RHS 1.483 18.5 Yes Pass
Offset 950m
0+800 RHS 1.469 17.4 99
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector

Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project

It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road

Ethiopian Road Adminstration

ECDSWCTDSWS Consultants

APPENDIX 5.18 - FDT FOR EMBANKMENT FILL MATERIALS LABORATORY TEST RESULTS

Reporting Period May 25,2022 to June 24/2023

Representative Section Material Sources Average Remark


Degree of
Degree of
Test Pit Compactio

FMC
Side

FDD
No. RFI No. Date Tested Purpose For Layer Compactio
Station n (Min.

From
n (Min. Returned

To
Side Chainage MDD OMC 95%) back
Acceptance
95%)

2nd layer 0+430 RHS 1.487 20.5 100


12m offset
0+600 LHS 98
34 000327 March 29, 2023 Embankment fill from cl12m 0+400 0+520 RHS 1.483 18.5 Yes Pass
Offset 950m
offset from
cl 0+500 LHS 1.410 18.0 95

1st layer
12m offset
0+600 LHS 107 107
35 000328 March 29, 2023 Embankment fill from cl12m 0+360 0+400 RHS 1.483 18.5 0+380 CL 1.584 19.1 Yes Pass
Offset 950m
offset from
cl

0+750 LHS 1.567 19.2 106


0+600 LHS 104
36 000338 March 30, 2023 Embankment fill 6th layer 0+740 0+880 RHS 1.483 18.5 Yes Pass
Offset 950m
0+820 RHS 1.511 19.1 102

9th layer 107


0+570 CL 1.583 19.9
12m offset
0+600 LHS 103
37 000410 April 5, 2023 Embankment fill from cl12m 0+520 0+660 RHS 1.483 18.5 Yes Pass
Offset 950m
offset from
0+620 RHS 1.470 19.5 99
cl

7th layer 101


0+550 CL 1.498 18.3
12m offset
0+600 LHS 100
38 000363 April 1, 2023 Embankment fill from cl12m 0+520 0+660 RHS 1.483 18.5 Yes Pass
Offset 950m
offset from
0+630 RHS 1.466 17.1 99
cl

7th layer 96
0+790 CL 1.422 19.7
12m offset
0+600 LHS 98
39 000360 April 1, 2023 Embankment fill from cl12m 0+740 0+880 RHS 1.483 18.5 Yes Pass
Offset 950m
offset from
0+850 RHS 1.489 18.6 100
cl
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector

Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project

It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road

Ethiopian Road Adminstration

ECDSWCTDSWS Consultants

APPENDIX 5.18 - FDT FOR EMBANKMENT FILL MATERIALS LABORATORY TEST RESULTS

Reporting Period May 25,2022 to June 24/2023

Representative Section Material Sources Average Remark


Degree of
Degree of
Test Pit Compactio

FMC
Side

FDD
No. RFI No. Date Tested Purpose For Layer Compactio
Station n (Min.

From
n (Min. Returned

To
Side Chainage MDD OMC 95%) back
Acceptance
95%)

3rd layer 0+420 CL 1.573 19.7 106


12m offset
0+600 LHS 108
40 000362 April 1, 2023 Embankment fill from cl12m 0+400 0+520 RHS 1.483 18.5 Yes Pass
Offset 950m
offset from
cl 0+490 LHS 1.639 18.6 111

2nd layer
12m offset
0+600 LHS 102 102
41 000361 April 1, 2023 Embankment fill from cl12m 0+360 0+400 RHS 1.483 18.5 0+370 RHS 1.520 20.1 Yes Pass
Offset 950m
offset from
cl

4th layer 0+440 CL 1.463 19.0 99


12m offset
0+600 LHS 103
42 000377 April 2, 2023 Embankment fill from cl12m 0+400 0+520 RHS 1.483 18.5 Yes Pass
Offset 950m
offset from
cl 0+480 LHS 1.581 19.0 107

3rd layer
12m offset
0+600 LHS 105 105
43 000376 April 2, 2023 Embankment fill from cl12m 0+360 0+400 RHS 1.483 18.5 0+380 RHS 1.561 17.9 Yes Pass
Offset 950m
offset from
cl

8th layer 0+560 LHS 1.549 18.2 104


12m offset
0+600 LHS 106
44 000378 April 2, 2023 Embankment fill from cl12m 0+520 0+660 RHS 1.483 18.5 Yes Pass
Offset 950m
offset from
cl 0+620 RHS 1.583 17.7 107
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector

Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project

It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road

Ethiopian Road Adminstration

ECDSWCTDSWS Consultants

APPENDIX 5.18 - FDT FOR EMBANKMENT FILL MATERIALS LABORATORY TEST RESULTS

Reporting Period May 25,2022 to June 24/2023

Representative Section Material Sources Average Remark


Degree of
Degree of
Test Pit Compactio

FMC
Side

FDD
No. RFI No. Date Tested Purpose For Layer Compactio
Station n (Min.

From
n (Min. Returned

To
Side Chainage MDD OMC 95%) back
Acceptance
95%)

5th layer 0+450 CL 1.476 17.2 100


12m offset
0+600 LHS 99
45 000410 April 5, 2023 Embankment fill from cl12m 0+400 0+520 RHS 1.483 18.5 Yes Pass
Offset 950m
offset from
cl 0+500 RHS 1.450 17.3 98

0+170 CL 1.583 19.9 107

0+600 LHS 103


46 000451 April 8, 2023 Embankment fill 1st layer 0+140 0+250 LHS 1.483 18.5 Yes Pass
Offset 950m

0+220 RHS 1.470 19.5 99

1st layer
12m offset
0+600 LHS 97 97
47 000450 April 8, 2023 Embankment fill from cl12m 0+060 0+100 LHS 1.483 18.5 0+080 CL 1.436 16.6 Yes Pass
Offset 950m
offset from
cl

0+600 LHS 102 102


48 000412 April 5, 2023 Embankment fill 4th layer 0+360 0+400 RHS 1.483 18.5 0+380 LHS 1.517 19.9 Yes Pass
Offset 950m

2nd layer
12m offset
0+600 LHS 99 99
49 000476 April 10, 2023 Embankment fill from cl12m 0+060 0+100 LHS 1.483 18.5 0+080 LHS 1.464 17.4 Yes Pass
Offset 950m
offset from
cl
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector

Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project

It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road

Ethiopian Road Adminstration

ECDSWCTDSWS Consultants

APPENDIX 5.18 - FDT FOR EMBANKMENT FILL MATERIALS LABORATORY TEST RESULTS

Reporting Period May 25,2022 to June 24/2023

Representative Section Material Sources Average Remark


Degree of
Degree of
Test Pit Compactio

FMC
Side

FDD
No. RFI No. Date Tested Purpose For Layer Compactio
Station n (Min.

From
n (Min. Returned

To
Side Chainage MDD OMC 95%) back
Acceptance
95%)

0+180 CL 1.434 19.1 97


0+600 LHS 96
50 000509 April 21, 2023 Embankment fill 3rd layer 0+140 0+250 LHS 1.483 18.5 Yes Pass
Offset 950m
0+210 RHS 1.409 20.7 95

0+600 LHS 100 100


51 000510 April 21, 2023 Embankment fill 4th layer 0+250 0+300 LHS 1.483 18.5 0+270 CL 1.485 18.1 Yes Pass
Offset 950m

1st layer 0+160 CL 1.435 18.7 97


12m offset
0+600 LHS 96
52 000508 April 21, 2023 Embankment fill from cl12m 0+140 0+220 RHS 1.483 18.5 Yes Pass
Offset 950m
offset from
cl 0+200 RHS 1.421 8.6 96

3rd layer
12m offset
0+600 LHS 102 102
53 000512 April 22, 2023 Embankment fill from cl12m 0+060 0+100 LHS 1.483 18.5 0+090 CL 1.512 18.8 Yes Pass
Offset 950m
offset from
cl

0+250 LHS 1.530 17.0 103

0+600 LHS 103 102


54 000541 April 25, 2023 Embankment fill 1st layer 0+220 0+360 RHS 1.483 18.5 0+300 CL 1.521 18.2 Yes Pass
Offset 950m

0+340 RHS 1.499 17.8 101


Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector

Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project

It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road

Ethiopian Road Adminstration

ECDSWCTDSWS Consultants

APPENDIX 5.18 - FDT FOR EMBANKMENT FILL MATERIALS LABORATORY TEST RESULTS

Reporting Period May 25,2022 to June 24/2023

Representative Section Material Sources Average Remark


Degree of
Degree of
Test Pit Compactio

FMC
Side

FDD
No. RFI No. Date Tested Purpose For Layer Compactio
Station n (Min.

From
n (Min. Returned

To
Side Chainage MDD OMC 95%) back
Acceptance
95%)

0+160 RHS 1.420 19.7 96


0+600 LHS 98
55 000536 April 25, 2023 Embankment fill 4th layer 0+140 0+220 LHS 1.483 18.5 Yes Pass
Offset 950m
0+200 LHS 1.489 17.5 100

2nd layer 0+160 CL 1.533 18.1 103


12m offset
0+600 LHS 103
56 000540 April 25, 2023 Embankment fill from cl12m 0+140 0+220 RHS 1.483 18.5 Yes Pass
Offset 950m
offset from
cl 0+200 RHS 1.524 18.9 103

5th layer 0+170 CL 1.517 17.3 102


12m offset
0+600 LHS 103
57 000564 April 27, 2023 Embankment fill from cl12m 0+140 0+220 LHS 1.483 18.5 Yes Pass
Offset 950m
offset from
cl 0+210 LHS 1.548 16.2 104

5th layer
12m offset
0+600 LHS 106 106
58 000565 April 27, 2023 Embankment fill from cl12m 0+060 0+100 LHS 1.483 18.5 0+080 LHS 1.571 19.2 Yes Pass
Offset 950m
offset from
cl

0+600 LHS 109 109


59 000546 April 26, 2023 Embankment fill 4th layer 0+060 0+100 LHS 1.483 18.5 0+080 CL 1.615 17.7 Yes Pass
Offset 950m
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector

Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project

It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road

Ethiopian Road Adminstration

ECDSWCTDSWS Consultants

APPENDIX 5.18 - FDT FOR EMBANKMENT FILL MATERIALS LABORATORY TEST RESULTS

Reporting Period May 25,2022 to June 24/2023

Representative Section Material Sources Average Remark


Degree of
Degree of
Test Pit Compactio

FMC
Side

FDD
No. RFI No. Date Tested Purpose For Layer Compactio
Station n (Min.

From
n (Min. Returned

To
Side Chainage MDD OMC 95%) back
Acceptance
95%)

1st layer
12m offset
0+600 LHS 111 111
60 000563 April 27, 2023 Embankment fill from cl12m 0+250 0+300 LHS 1.483 18.5 0+280 LHS 1.648 18.7 Yes Pass
Offset 950m
offset from
cl

0+600 LHS 102 102


61 000566 April 28, 2023 Embankment fill 2nd layer 0+700 0+740 RHS 1.483 18.5 0+720 CL 1.516 20.2 Yes Pass
Offset 950m

0+600 LHS 102 102


62 000604 May 2, 2023 Embankment fill 3rd layer 0+700 0+740 LHS 1.483 18.5 0+720 LHS 1.517 17.3 Yes Pass
Offset 950m

0+600 LHS 100 100


63 000631 May 4, 2023 Embankment fill 1st layer 0+780 0+880 LHS 1.483 18.5 0+830 LHS 1.481 20.2 Yes Pass
Offset 950m

0+600 LHS 102 102


64 000590 May 1, 2023 Embankment fill 2nd layer 8+800 0+940 LHS 1.483 18.5 0+910 RHS 1.508 20.2 Yes Pass
Offset 950m

0+240 CL 1.474 18.9 100


2nd layer,
0+600 LHS 103 100
65 000593 May 1, 2023 Embankment fill 12m offset 0+220 0+360 RHS 1.468 20.0 0+280 LHS 1.510 16.7 Yes Pass
Offset 950m
from cl
1+260 RHS 1.441 19.6 98

0+600 LHS 100 100


66 000581 April 29, 2023 Embankment fill 5th layer 0+880 0+940 LHS 1.483 18.5 0+900 LHS 1.490 18.8 Yes Pass
Offset 950m

0+600 LHS 99 99
67 000651 May 6, 2023 Embankment fill 3rd layer 0+700 0+780 LHS 1.483 18.5 0+740 LHS 1.470 20.4 Yes Pass
Offset 950m

0+600 LHS 100 100


68 000650 May 6, 2023 Embankment fill 2nd layer 0+780 0+880 LHS 1.483 18.5 0+840 RHS 1.481 20.0 Yes Pass
Offset 950m

0+600 LHS 98 98
69 000582 April 29, 2023 Embankment fill 1st layer 0+700 0+780 LHS 1.483 18.5 0+740 LHS 1.448 19.8 Yes Pass
Offset 950m
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector

Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project

It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road

Ethiopian Road Adminstration

ECDSWCTDSWS Consultants

APPENDIX 5.18 - FDT FOR EMBANKMENT FILL MATERIALS LABORATORY TEST RESULTS

Reporting Period May 25,2022 to June 24/2023

Representative Section Material Sources Average Remark


Degree of
Degree of
Test Pit Compactio

FMC
Side

FDD
No. RFI No. Date Tested Purpose For Layer Compactio
Station n (Min.

From
n (Min. Returned

To
Side Chainage MDD OMC 95%) back
Acceptance
95%)

0+600 LHS 104 104


70 000625 May 4, 2023 Embankment fill 3rd layer 0+880 0+940 LHS 1.483 18.5 0+910 CL 1.549 19.2 Yes Pass
Offset 950m

0+230 CL 1.447 17.8 99


3rd layer,
0+600 LHS 97 98
71 000639 May 5, 2023 Embankment fill 12m offset 0+220 0+360 RHS 1.468 20.0 0+270 RHS 1.419 18.0 Yes Pass
Offset 950m
from cl
0+320 CL 1.437 18.3 98

4th layer, 0+170 LHS 1.419 20.0 97


0+600 LHS 97
72 000638 May 5, 2023 Embankment fill 12m offset 0+140 0+220 RHS 1.468 20.0 Yes Pass
Offset 950m
from cl 0+200 RHS 1.441 20.3 98

0+150 CL 1.443 20.0 97


0+600 LHS 97
73 000592 May 1, 2023 Embankment fill 3rd layer 0+140 0+220 RHS 1.483 18.5 Yes Pass
Offset 950m
0+180 LHS 1.448 17.9 98

0+600 LHS 97 97
74 000630 May 4, 2023 Embankment fill 2nd layer 0+700 0+780 LHS 1.483 18.5 0+750 CL 1.442 18.1 Yes Pass
Offset 950m

0+600 LHS 98 98
75 000634 May 5, 2023 Embankment fill 4th layer 0+700 0+740 LHS 1.483 18.5 0+720 CL 1.454 20.2 Yes Pass
Offset 950m

3rd layer
0+600 LHS 103 103
76 000673 May 9, 2023 Embankment fill 12m offset 0+780 0+880 LHS 1.483 18.5 0+830 LHS 1.533 20.0 Yes Pass
Offset 950m
from cl

0+600 LHS 99 99
77 000672 May 9, 2023 Embankment fill 4th layer 0+700 0+780 LHS 1.483 18.5 0+750 CL 1.475 19.8 Yes Pass
Offset 950m

5th layer
0+600 LHS 97 97
78 000671 May 9, 2023 Embankment fill 12m offset 0+700 0+740 RHS 1.483 18.5 0+710 LHS 1.445 18.4 Yes Pass
Offset 950m
from cl

4th layer
0+600 LHS 98 98
79 000711 May 13, 2023 Embankment fill 12m offset 0+880 0+940 LHS 1.483 18.5 0+900 CL 1.459 19.7 Yes Pass
Offset 950m
from cl
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector

Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project

It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road

Ethiopian Road Adminstration

ECDSWCTDSWS Consultants

APPENDIX 5.18 - FDT FOR EMBANKMENT FILL MATERIALS LABORATORY TEST RESULTS

Reporting Period May 25,2022 to June 24/2023

Representative Section Material Sources Average Remark


Degree of
Degree of
Test Pit Compactio

FMC
Side

FDD
No. RFI No. Date Tested Purpose For Layer Compactio
Station n (Min.

From
n (Min. Returned

To
Side Chainage MDD OMC 95%) back
Acceptance
95%)

4th layer
0+600 LHS 98 98
80 000712 May 13, 2023 Embankment fill 12m offset 0+780 0+880 LHS 1.483 18.5 0+820 RHS 1.447 19.7 Yes Pass
Offset 950m
from cl

5th layer
0+600 LHS 100 100
81 000713 May 13, 2023 Embankment fill 12m offset 0+700 0+780 LHS 1.483 18.5 0+740 CL 1.478 20.0 Yes Pass
Offset 950m
from cl

Prepared By Lab. Tech. Checked By PME

Name Name

Signature Signature

Date Date
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector

Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project

It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road

Ethiopian Road Adminstration

ECDSWCTDSWS Consultants

APPENDIX 5.19 - FDT FOR SUB GRADE MATERIALS LABORATORY TEST RESULTS

Reporting Period May 25,2022 to June 24/2023

Representative Section Material Sources Remark

Average
Degree
Degree
of
Test Pit of

FMC
Side

FDD
No. RFI No. Date Tested Purpose For Compacti
Station Compacti Returned Accepta

From
on (Min.

To
Side Chainage MDD OMC on (Min. back nce
95%)
95%)

0+920 LHS 1.427 17.9 96

1 000087 February 23, 2023 Sub grade 0+880 1+080 RHS 0+600 LHS Offset 950m 1.483 18.5 0+980 CL 1.442 18.4 97 97 Yes Pass

1+060 RHS 1.432 18.3 97

0+140 RHS 1.431 17.7 96

2 000375 February 24, 2023 Sub grade 1+060 1+240 RHS 0+600 LHS Offset 950m 1.483 18.5 1+190 CL 1.457 18.5 98 97 Yes Pass

1+220 LHS 1.420 18.3 96

1+120 CL 1.421 17.3 96


3 000104 February 27, 2023 Sub grade 1+100 1+200 LHS 0+600 LHS Offset 950m 1.483 18.5 97 Yes Pass
1+180 LHS 1.449 17.2 98

1+300 RHS 1.450 17.0 98


4 000109 February 28, 2023 Sub grade 1+260 1+380 RHS 0+600 LHS Offset 950m 1.483 18.5 97 Yes Pass
1+350 LHS 1.419 16.9 96

1+220 CL 1.422 19.7 96


5 000117 March 1, 2023 Sub grade 1+200 1+280 LHS 0+600 LHS Offset 950m 1.483 18.5 97 Yes Pass
1+250 LHS 1.452 17.2 98
1+120 CL 1.461 17.3 99

6 000104 February 27, 2023 Sub grade 1+100 1+200 LHS 0+600 LHS Offset 950m 1.483 18.5 98 Yes Pass

1+180 LHS 1.449 17.2 98

1+030 RHS 1.415 17.7 95


7 000151 March 6, 2023 Sub grade 1+000 1+100 LHS 0+600 LHS Offset 950m 1.483 18.5 95 Yes Pass
1+080 LHS 1.414 17.7 95

0+790 LHS 1.451 20.2 98


8 000239 March 21, 2023 Sub grade 0+760 0+880 RHS 0+600 LHS Offset 950m 1.483 18.5 97 Yes Pass
0+840 CL 1.439 20.5 97

0+110 LHS 1.511 17.1 102


9 000268 March 21, 2023 Sub grade 0+060 0+240 LHS 0+600 LHS Offset 950m 1.483 18.5 102 Yes Pass
0+200 CL 1.503 19.4 101

0+260 CL 1.444 18.5 97

0+310 RHS 1.444 17.2 97


10 000277 March 25, 2023 Sub grade 0+240 0+420 LHS 0+600 LHS Offset 950m 1.483 18.5 98 Yes Pass
0+360 LHS 1.450 18.9 98

0+410 RHS 1.460 20.2 98

0+440 LHS 1.417 19.9 96


11 000286 March 26, 2023 Sub grade 0+420 0+580 LHS 0+600 LHS Offset 950m 1.483 18.5 95 Yes Pass
0+500 RHS 1.414 16.9 95

0+430 LHS 1.520 17.0 102

0+500 RHS 1.525 19.3 103


12 000303 March 28, 2023 Sub grade 0+360 0+660 RHS 0+600 LHS Offset 950m 1.483 18.5 104 Yes Pass
0+590 CL 1.521 16.8 103

0+650 RHS 1.614 17.4 109

13 000351 March 31, 2023 Sub grade 1+160 1+720 RHS 0+600 LHS Offset 950m 1.483 18.5 1+690 LHS 1.519 23.0 102 102 Yes Pass

1+450 CL 1.406 20.1 95

1+510 RHS 1.464 18.6 99


14 000350 March 31, 2023 Sub grade 1+400 1+640 RHS 0+600 LHS Offset 950m 1.483 18.5 96 Yes Pass
1+580 LHS 1.412 18.1 95

1+610 RHS 1.440 19.9 97

15 000513 April 22, 2023 Sub grade 1+300 1+400 LHS 0+600 LHS Offset 950m 1.483 18.5 1+350 LHS 1.471 18.1 99 99 Yes Pass
0+190 CL 1.486 17.6 100

0+250 RHS 1.637 17.2 110


16 000539 April 25, 2023 Sub grade 0+140 0+360 RHS 0+600 LHS Offset 950m 1.483 18.5 107 Yes Pass
0+300 LHS 1.629 19.5 110

1+340 RHS 1.596 19.1 108

0+770 CL 1.424 19.8 96


0+810 RHS 1.443 20.3 97
17 000701 May 12, 2023 Sub grade 0+720 0+940 LHS 0+600 LHS Offset 950m 1.483 18.5 97 Yes Pass
0+880 LHS 1.422 19.5 96
0+920 RHS 1.450 19.1 98
1+440 CL 1.425 20.5 96
18 000745 May 16, 2023 Sub grade 1+400 1+600 LHS 0+600 LHS Offset 950m 1.483 18.5 1+500 RHS 1.418 19.2 96 96 Yes Pass
1+580 LHS 1.436 19.5 97
0+420 CL 1.438 19.3 97
1+500 RHS 1.412 18.8 95
19 000772 May 19, 2023 Sub grade 1+380 1+640 LHS 0+600 LHS Offset 950m 1.483 18.5 97 Yes Pass
1+550 LHS 1.454 20.0 98
1+610 CL 1.448 19.1 98

Prepared By Lab. Tech. Checked By PME

Name Name

Signature Signature

Date Date
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector
Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project
It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road
Ethiopian Road Adminstration
ECDSWCTDSWS Consultants
APPENDIX 5.4 - CAPPING MATERIALS LABORATORY TEST RESULTS
Reporting Period May 25,2022 to June 24/2023

Quality Requirement

Grading Modulus

Classification
AASHTO Soil
Depth (m)
Sieve Analysis

Lab No.
Samplin Testing Date CBR
No. g Side Offset Visual Description
Station Atterberg Limit (%) Proctor
Swell % Passing Sieves Remark
at 95% (mm)
MDD
LL PL PI MDD OMC 2.00 0.425 0.075

Upper capping layers Max. 60 - Max. 30 Min. 15 Max. 2 - - - - - Min -


Project Requirement / Specification
Returned
Lower capping layer Max. 60 - Max. 30 Min. 8 Max. 2 - - - - - 0.75 - Acceptance
back

1 0+600 LHS 950 pit 12 February 21, 2023 Silt or Clayey Gravel and Sand 50.0 30.0 19.0 46.5 0.6 1.483 18.5 55.6 36.9 14.1 1.9 A-2-7(0) Suitable Yes

Average GM is
70.9 41.7 26.0 1.7 A-2-7(0) Yes
1.82

2 0+600 LHS 950 pit 58 June 25, 2023 Silt or Clayey Material 39.0 22.0 17.0 27.5 1.0 1.610 18.5 65.1 51.7 36.1 1.5 A-6(10) Suitable Yes

Prepared By Material Inspector/ Lab. Tech. Checked By PME

Name Name

Signature Signature

Date Date
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector

Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project

It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road

Ethiopian Road Adminstration

ECDSWCTDSWS Consultants

APPENDIX 5.20 - FDT FOR CAPPING MATERIALS LABORATORY TEST RESULTS

Reporting Period May 25,2022 to June 24/2023

Representative Section Material Sources Remark


Average
Degree
Degree
of
Test Pit of

FMC
Side

FBD
No. RFI No. Date Tested Purpose For Compacti
Station Compacti Returned Accepta

From
on (Min.

To
Side Chainage MDD OMC on (Min. back nce
95%)
95%)

1+090 CL 1.489 19.9 100


1+120 LHS 1.478 18.4 100
1 000237 March 21, 2023 Capping Layer 1+080 1+240 RHS 0+600 LHS Offset 950m 1.483 18.5 98 Yes Pass
1+180 RHS 1.410 19.9 95
1+220 CL 1.428 17.4 96
1+130 LHS 1.499 18.7 101
1+180 RHS 1.403 18.3 95
2 000238 March 21, 2023 Capping Layer 0+110 1+280 LHS 0+600 LHS Offset 950m 1.483 18.5 98 Yes Pass
1+240 RHS 1.494 19.8 101
1+260 CL 1.416 20.3 95

3 000526 April 23, 2023 Capping Layer 1+160 1+720 RHS 0+600 LHS Offset 950m 1.483 18.5 0+690 LHS 1.417 16.8 96 96 Yes Pass

1+020 RHS 1.485 19.0 100


4 000310 March 28, 2023 Capping Layer 1+000 1+100 LHS 0+600 LHS Offset 950m 1.483 18.5 98 Yes Pass
1+090 CL 1.408 19.9 95

1+800 LHS 1.427 17.4 96


5 000308 March 28, 2023 Capping Layer 0+760 0+900 RHS 0+600 LHS Offset 950m 1.483 18.5 97 Yes Pass
1+850 RHS 1.442 19.6 97

1+310 LHS 1.547 17.7 104


6 000309 March 28, 2023 Capping Layer 1+280 1+380 RHS 0+600 LHS Offset 950m 1.483 18.5 102 Yes Pass
1+360 RHS 1.471 19.8 99

0+440 RHS 1.403 20.6 95

0+500 CL 1.450 16.5 98


7 000357 March 30, 2023 Capping Layer 0+380 0+660 RHS 0+600 LHS Offset 950m 1.483 18.5 102 Yes Pass
0+570 LHS 1.510 19.9 102

0+640 RHS 1.671 20.3 113


0+950 CL 1.446 19.9 98

8 000635 May 5, 2023 Capping Layer 0+900 1+080 LHS 0+600 LHS Offset 950m 1.483 18.5 1+000 LHS 1.448 18.4 98 97 Yes Pass

1+060 RHS 1.438 19.9 97

1+300 LHS 1.421 19.7 96


9 000792 May 23, 2023 Capping Layer 1+260 1+380 LHS 0+600 LHS Offset 950m 1.483 18.5 96 Yes Pass
1+350 RHS 1.415 20.2 95

1+420 LHS 1.759 19.7 99

1+480 RHS 1.714 11.6 97


0+600 LHS Offset 1.2km Sub 98
10 000852 May 31, 2023 Capping Layer 1+380 1+620 LHS 1.768 12.0 Yes Pass
base Material 1+560 RHS 1.722 12.8 97

1+620 CL 1.761 12.1 100

1+410 LHS 1.761 12.1 100

1+470 RHS 1.776 11.0 100


0+600 LHS Offset 1.2km Sub 99
11 000811 May 25, 2023 Capping Layer 1+380 1+640 RHS 1.768 12.0 Yes Pass
base Material 1+550 RHS 1.762 12.7 100

1+610 CL 1.728 11.5 98

0+760 LHS 1.465 16.5 99

0+800 RHS 1.436 19.7 97


12 000771 May 19, 2023 Capping Layer 0+720 0+940 LHS 0+600 LHS Offset 950m 1.483 18.5 97 Yes Pass
0+850 RHS 1.421 19.4 96

0+910 CL 1.421 19.8 96

0+190 RHS 1.526 19.8 103

0+240 CL 1.597 18.0 108


13 000960 June 14, 2023 Capping Layer 0+160 0+320 RHS 0+600 LHS Offset 950m 1.483 18.5 107 Yes Pass
0+280 LHS 1.578 19.2 106

0+310 RHS 1.622 20.5 109

14 000973 June 16, 2023 Capping Layer 0+700 0+740 RHS 0+600 LHS Offset 950m 1.483 18.5 0+720 LHS 1.704 19.1 115 115 Yes Pass

Prepared By Lab. Tech. Checked By PME

Name Name

Signature Signature

Date Date
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector
Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project

It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road

Ethiopian Road Adminstration

ECDSWCTDSWS Consultants

APPENDIX 5.5 - SUB BASE MATERIALS LABORATORY TEST RESULTS

Reporting Period May 25,2022 to June 24/2023

Specification Requirement

Specification

Grading▲
Plasticity Linear
Lab No. 63 37.5 20 4.75 2.00 1.00 0.425 0.075 MDD OMC CBR Swell Product Shrinkag FI
Sampling (PP) e (LS)
Depth (m)

No. Side Offset LL (%) PL (%) PI (%) GM AASHTO Remark


Station
Soil
Testing Date Visual Description 100 70 50 30 - 17.00 11 5 (g/cm3 % (%) (%)
Classificati
on
A 100 100 100 100 - 75 56 25

<45 - ≤12 ≥1.5 - - ≥30% Max 500 Max 6 Mx 35


Returned
- Acceptance
back

Bahir dar city


1
Around Lideta
Stock 20 February 14, 2023 Red clay soil for blending 96.7 93.7 93.7 81.5 55 32 23 0.28 1.435 21 2.5 3.9 1880 A-7-5(21) Yes

Cinder from
0+600 LHS &
2 Clay from Bahir LHS 1.2km Stock 19 February 14, 2023 1 Clay and 5 Cinder Ratio 100 95 75 38 30 27 22 17 26 20 6 2.31 1.768 12 48 0.02 100.8 1.43 5 A-4(4) Suitable Yes
dar aropund
Ledeta 1:5 Ratio

Cinder from
0+600 LHS &
3 Clay from Bahir LHS 1.2km Stock 25 February 14, 2023 1 Clay and 6 Cinder Ratio 100 92 69 34 28 24 20 15 21 18 3 2.38 1.820 10.8 58 0.02 40.7 0.71 5 A-4(0) Suitable Yes
dar aropund
Ledeta 1:6 Ratio

Cinder from
0+600 LHS &
4 Clay from Bahir LHS 1.2km Stock 26 February 14, 2023 1 Clay and 7 Cinder Ratio Np Np Np 1.920 11 Yes
dar aropund
Ledeta 1:7 Ratio

Prepared By Lab. Tech. Checked By PME


Name Name
Signature Signature
Date Date
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector

Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project

It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road

Ethiopian Road Adminstration

ECDSWCTDSWS Consultants

APPENDIX 5.21 - FDT FOR SUB BASE MATERIALS LABORATORY TEST RESULTS

Reporting Period May 25,2022 to June 24/2023

Representative Section Material Sources Remark


Average
Degree
Degree
of
Test Pit of

FMC
Side

FDD
No. RFI No. Date Tested Purpose For Compacti
Station Compacti Returned Accepta

From
on (Min.

To
Side Chainage MDD OMC on (Min. back nce
95%)
95%)

Sub base trial 104 104


1 000494 April 20, 2023 0+220 0+320 RHS km 0+600 LHS Offset 1.2km 1.768 12.0 0+270 CL 1.841 13.1 Yes Pass
section

0+780 LHS 1.771 9.8 99


0+780 - 1+180 RHS Road way
2 000800 May 24, 2023 1st Layer Sub base 0+720 0+900 LHS (Source from km 0+600 LHS 1.795 11.6 0+850 LHS 1.777 10.5 99 99 Yes Pass
Offset 1.2km )
0+910 LHS 1.763 11.5 98

0+400 LHS 1.820 12.2 98

0+400 - 0+620 RHS Road way 0+450 RHS 1.833 11.0 99


3 000812 May 25, 2023 1st Layer Sub base 0+400 0+660 RHS (Source from km 0+600 LHS 1.855 13.5 99 Yes Pass
Offset 1.2km ) 0+540 CL 1.833 13.4 99

0+630 LHS 1.830 11.0 99

1+090 RHS 1.976 11.6 110


0+780 - 1+180 RHS Road way
4 000791 May 23, 2023 1st Layer Sub base 1+000 1+260 LHS (Source from km 0+600 LHS 1.795 11.6 1+150 LHS 1.895 13.3 106 105 Yes Pass
Offset 1.2km )
1+220 CL 1.784 13.2 99

0+780 - 1+180 RHS Road way 1+300 LHS 1.969 12.2 110
5 000819 May 26, 2023 1st Layer Sub base 1+260 1+380 LHS (Source from km 0+600 LHS 1.795 11.6 108 Yes Pass
Offset 1.2km ) 1+340 CL 1.905 12.7 106

1+420 LHS 1.894 12.8 102

0+400 - 0+620 RHS Road way 1+480 RHS 1.850 11.5 100
6 000871 June 2, 2023 1st Layer Sub base 1+380 1+620 RHS (Source from km 0+600 LHS 1.855 13.5 101 Yes Pass
Offset 1.2km ) 1+520 CL 1.869 15.1 101

1+600 LHS 1.873 12.8 101

0+400 - 0+620 RHS Road way 1+200 LHS 1.934 11.9 104
7 000855 May 31, 2023 1st Layer Sub base 1+180 1+280 RHS (Source from km 0+600 LHS 1.855 13.5 103 Yes Pass
Offset 1.2km )
0+400 - 0+620 RHS Road way
7 000855 May 31, 2023 1st Layer Sub base 1+180 1+280 RHS (Source from km 0+600 LHS 1.855 13.5 103 Yes Pass
Offset 1.2km ) 1+250 RHS 1.901 12.7 102

0+400 - 0+620 RHS Road way


8 000856 May 31, 2023 1st Layer Sub base 1+160 1+720 RHS (Source from km 0+600 LHS 1.855 13.5 1+700 RHS 1.848 13.7 100 100 Yes Pass
Offset 1.2km )

0+860 LHS 1.780 13.3 99

0+780 - 1+180 RHS Road way 0+940 RHS 1.762 12.0 98


9 000777 May 19, 2023 1st Layer Sub base 0+780 1+180 RHS (Source from km 0+600 LHS 1.795 11.6 99 Yes Pass
Offset 1.2km ) 1+060 CL 1.767 11.6 98

1+180 LHS 1.765 12.8 98

0+840 LHS 1.822 13.3 98

0+400 - 0+620 RHS Road way 0+930 RHS 1.853 12.0 100
10 000888 June 5, 2023 2nd Layer Sub base 0+780 1+180 RHS (Source from km 0+600 LHS 1.855 13.5 99 Yes Pass
Offset 1.2km ) 1+070 CL 1.844 11.6 99

1+130 LHS 1.848 12.8 100

1+090 RHS 1.954 14.1 105

0+400 - 0+620 RHS Road way 1+130 LHS 1.953 13.2 105
11 000944 June 12, 2023 2nd Layer Sub base 1+020 1+360 LHS (Source from km 0+600 LHS 1.855 13.5 105 Yes Pass
Offset 1.2km ) 1+240 CL 1.966 14.8 106

1+310 LHS 1.940 13.6 105

1+410 LHS 1.859 13.4 100


0+780 - 1+180 RHS Road way
12 000906 June 7, 2023 1st Layer Sub base 1+380 1+550 LHS (Source from km 0+600 LHS 1.855 13.5 1+460 RHS 1.815 11.6 98 99 Yes Pass
Offset 1.2km )
1+500 CL 1.846 12.7 100

0+190 CL 1.850 14.1 100


0+780 - 1+180 RHS Road way
13 000919 June 9, 2023 1st Layer Sub base 0+140 0+280 LHS (Source from km 0+600 LHS 1.855 13.5 101 Yes Pass
Offset 1.2km ) 102
0+240 RHS 1.894 14.5

1+430 LHS 1.838 15.2 99

0+400 - 0+620 RHS Road way 1+490 RHS 1.839 13.3 99


14 000961 June 14, 2023 2nd Layer Sub base 1+440 1+600 RHS (Source from km 0+600 LHS 1.855 13.5 101 Yes Pass
Offset 1.2km ) 1+540 CL 1.871 16.4 101

1+590 LHS 1.913 15.2 103

0+400 - 0+620 RHS Road way 0+430 CL 1.941 13.4 105


15 001001 June 20, 2023 2nd Layer Sub base 0+400 0+540 RHS (Source from km 0+600 LHS 1.855 13.5 105 Yes Pass
Offset 1.2km ) 0+500 LHS 1.937 15.3 104

0+780 - 1+180 RHS Road way


16 001007 June 21, 2023 1st Layer Sub base 0+700 0+760 RHS (Source from km 0+600 LHS 1.855 13.5 0+730 LHS 1.933 15.3 104 104 Yes Pass
Offset 1.2km )

0+400 - 0+620 RHS Road way 0+570 RHS 1.921 15.2 104
17 001021 June 22, 2023 2nd Layer Sub base 0+540 0+620 RHS (Source from km 0+600 LHS 1.855 13.5 106 Yes Pass
Offset 1.2km ) 0+600 CL 2.006 13.9 108

0+400 - 0+620 RHS Road way 0+200 LHS 1.997 15.4 108
18 001017 June 22, 2023 2nd Layer Sub base 0+160 0+280 LHS (Source from km 0+600 LHS 1.855 13.5 107 Yes Pass
Offset 1.2km ) 0+260 CL 1.960 14.6 106

0+400 - 0+620 RHS Road way 1+200 LHS 2.008 15.2 108
19 001029 June 23, 2023 2nd Layer Sub base 0+180 0+260 RHS (Source from km 0+600 LHS 1.855 13.5 111 Yes Pass
Offset 1.2km ) 1+240 RHS 2.092 12.8 113
0+780 - 1+180 RHS Road way
20 001037 June 24, 2023 1st Layer Sub base 0+620 0+660 RHS (Source from km 0+600 LHS 1.855 13.5 0+640 CL 1.916 13.3 103 103 Yes Pass
Offset 1.2km )

Prepared By Lab. Tech. Checked By PME

Name Name

Signature Signature

Date Date
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector
Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project

It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road

Ethiopian Road Adminstration

ECDSWCTDSWS Consultants

APPENDIX 5.6 - SUB BASE AFTER COMPACTION MATERIALS LABORATORY TEST RESULTS

Reporting Period May 25,2022 to June 24/2023

Specification Requirement

Specification

Grading▲
Plasticity Linear
Lab No.

Sampli 63 37.5 20 4.75 2.00 1.00 0.425 0.075 MDD OMC CBR Swell Product Shrinkag FI

Depth (m)
No. ng Side Side LL PL (PP) e (LS) AASHT Remark
PI (%) GM
Station Represent (%) (%) (g/ O Soil
Testing Date Visual Description 100 70 50 30 - 17.00 11 5 % (%) (%)
Section cm3 Classifi
cation
A 100 100 100 100 - 75 56 25
<45 - ≤12 ≥1.5 - - ≥30% Max 500 Max 6 Mx 35
Returned
- Acceptance
back

38 0+980 RHS May 26, 2023 100 100 84 53 37 31 22 13 22 18 4 2.23

38 0+790 LHS May 25, 2023 Sub base 1st Layer ( Cinder from 100 93 80 60 47 41 30 19 21 18 3 2.04
1 0+780 1+180 RHS 0.2 0+600 LHS & Clay from Bahir dar 1.795 11.6 Suitable Yes
38 0+880 CL May 25, 2023 aropund Ledeta 1:5 Ratio 100 94 82 60 45 39 30 19 22 18 4 2.06

38 1+080 LHS May 25, 2023 100 96 83 59 43 37 28 18 22 18 4 2.09

38 1+160 CL May 25, 2023 100 99 84 53 38 31 22 12 21 17 4 2.25

Sub base 1st Layer ( Cinder from


2 49 0+790 LHS 0+720 0+900 LHS 0.2 April 6, 2023 0+600 LHS & Clay from Bahir dar 100 88 72 47 32 26 17 25 20 5 2.21 Suitable Yes
aropund Ledeta 1:5 Ratio

Sub base 1st Layer ( Cinder from


3 48 0+500 RHS 0+400 0+620 RHS 0.2 June 5, 2023 0+600 LHS & Clay from Bahir dar 100 95 81 54 34 26 15 20 16 3 2.18 1.855 13.5 Suitable Yes
aropund Ledeta 1:5 Ratio

Sub base 1st Layer ( Cinder from


4 51 1+126 LHS 1+000 1+280 CL 0.2 June 6, 2023 0+600 LHS & Clay from Bahir dar 100 87 72 49 31 23 10 26 22 4 2.3 Suitable Yes
aropund Ledeta 1:5 Ratio

Sub base 1st Layer ( Cinder from


5 50 1+340 LHS 1+280 1+380 LHS 0.2 June 4, 2023 0+600 LHS & Clay from Bahir dar 100 94 84 57 36 27 14 19 16 3 2.16 Suitable Yes
aropund Ledeta 1:5 Ratio

Sub base 1st Layer ( Cinder from


6 54 1+500 CL 1+380 1+620 RHS 0.2 June 12, 2023 0+600 LHS & Clay from Bahir dar 100 90 75 18 28 22 10 21 18 3 2.31 Suitable Yes
aropund Ledeta 1:5 Ratio

Sub base 1st Layer ( Cinder from


7 56 1+220 CL 1+180 1+270 RHS 0.2 June 12, 2023 0+600 LHS & Clay from Bahir dar 100 97 83 59 40 32 20 22 18 4 1.95 Suitable Yes
aropund Ledeta 1:5 Ratio

Sub base 1st Layer ( Cinder from


8 53 1+680 CL 1+660 1+700 RHS 0.2 June 12, 2023 0+600 LHS & Clay from Bahir dar 100 86 70 43 28 21 13 20 16 4 2.3 Suitable Yes
aropund Ledeta 1:5 Ratio
0+900 RHS June 10, 2023 Sub base 2nd Layer ( Cinder from 100 95 87 62 39 30 17 24 18 6 2 Suitable Yes
9 52 0+780 1+180 RHS 0.2 0+600 LHS & Clay from Bahir dar
aropund Ledeta 1:5 Ratio
1+100 CL June 12, 2023 100 88 68 44 28 21 11 14 12 2 2.3 Suitable Yes

11
Prepared By Lab. Tech. Checked By PME
Name Name
Signature Signature
Date Date
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector
Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project
It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road
Ethiopian Road Adminstration
ECDSWCTDSWS Consultants
APPENDIX 5.7 - BASE COURSE MATERIALS LABORATORY TEST RESULTS
Reporting Period May 25,2022 to June 24/2023

Wet Sieve Analysis (% Passing)


CBR @

Testing Date
TFV (%) MDD OMC Swell

Specification▲
Sampling 98% MDD
Side Offset 20 5 2.36 FI (%) PI (%) ACV Remark
Station Depth (m) Lab No. Visual Description 50 mm 37.5 mm mm 10 mm mm mm 2.00 425 µm 75 µm

Dry Wet Wet/ Dry (g/cc) (%) (%) (%)

Returned
Acceptance
back

Meshent Crusher
Offset 18km 18km from Bahir 10
LHS Stock 27 19/04/2023 Crushed Base course 100 100 71.6 44.2 25.4 16.1 9.1 6.4 19 NP 380 320 2.247 8.2 185 0.04 Suitable Yes
from Bahir dar dar City
City 84

Prepared By Lab. Tech. Checked By PME

Name Name

Signature Signature

Date Date
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector

Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project

It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road

Ethiopian Road Adminstration

ECDSWCTDSWS Consultants

APPENDIX 5.22 - FDT FOR BASE COURSE MATERIALS LABORATORY TEST RESULTS

Reporting Period May 25,2022 to June 24/2023

Representative Section Material Sources Remark


Average
Degree
Degree
of
Test Pit of

FMC
Side

FBD

FDD
No. RFI No. Date Tested Purpose For Compacti
Station Compacti Returned Accepta

From
on (Min.

To
Side Chainage MDD OMC on (Min. back nce
95%)
95%)

Prepared By Lab. Tech. Checked By PME

Name Name

Signature Signature

Date Date
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector
Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project
It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road
Ethiopian Road Adminstration
ECDSWCTDSWS Consultants
APPENDIX 5.8 - BASE COURSE AFTER COMPACTION MATERIALS LABORATORY TEST RESULTS
Reporting Period May 25,2022 to June 24/2023

Wet Sieve Analysis (% Passing)


CBR @

Lab No.
TFV (%) MDD OMC Swell

Testing Date
Sampling 98% MDD
Side Offset Depth (m) 20 5 2.36 Remark

Specification▲
FI (%) PI (%) ACV
Station
50 mm 37.5 mm mm 10 mm mm mm 2.00 425 µm 75 µm
Visual Description
Dry Wet Wet/ Dry (g/cc) (%) (%) (%)

Returned
Acceptance
back

N
o

Prepared By Lab. Tech. Checked By PME

Name Name

Signature Signature

Date Date
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector

Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project

It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road

Ethiopian Road Adminstration

ECDSWCTDSWS Consultants

APPENDIX 5.23 - FDT FOR BACK FILL MATERIALS LABORATORY TEST RESULTS

Reporting Period May 25,2022 to June 24/2023

Representative Section Material Sources Average Remark


Degree of
Degree of
Test Pit Compactio

FMC
Side

FDD
No. RFI No. Date Tested Purpose For Layer Compactio
Station n (Min.

From
n (Min. Returned Acceptan

To
Side Chainage MDD OMC 95%) back ce
95%)

0+820 LHS 1.650 13.3 93


0+600 LHS Offset 0+940 RHS 1.560 12.1 88
1 000844 May 29, 2023 Back fill 2nd layer 0+760 1+220 RHS 1.2km Sub base 1.768 12.0 91 Yes Failed
Material 1+220 RHS 1.661 13.2 94
1+180 CL 1.578 10.4 89
1+090 LHS 1.747 13.4 99
0+600 LHS Offset 1+190 RHS 1.772 12.6 100
2 000858 May 31, 2023 Back fill 2nd layer 1+000 1+380 LHS 1.2km Sub base 1.768 12.0 99 Yes Pass
Material 1+260 RHS 1.732 13.4 98
1+340 CL 1.715 13.2 97
0+440 LHS 1.734 10.9 98
0+600 LHS Offset 0+500 RHS 1.773 10.4 100
3 000859 May 31, 2023 Back fill 2nd layer 0+380 0+630 RHS 1.2km Sub base 1.768 12.0 99 Yes Pass
Material 0+560 RHS 1.737 10.9 98
0+610 CL 1.754 10.4 99
0+820 LHS 1.650 13.3 93
0+600 LHS Offset 0+940 RHS 1.560 12.1 88
4 000909 June 7, 2023 Back fill 2nd layer 0+760 1+220 RHS 1.2km Sub base 1.768 12.0 91 Yes Failed
Material 1+120 RHS 1.661 13.2 94
1+180 CL 1.578 10.4 89
1+070 RHS 1.792 11.6 101
0+600 LHS Offset 1+180 CL 1.806 11.5 102
5 000949 June 13, 2023 Back fill 3rd layer 1+000 1+380 LHS 1.2km Sub base 1.768 12.0 101 Yes Pass
Material 1+250 RHS 1.772 13.4 100
1+350 CL 1.748 13.4 99
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector

Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project

It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road

Ethiopian Road Adminstration

ECDSWCTDSWS Consultants

APPENDIX 5.23 - FDT FOR BACK FILL MATERIALS LABORATORY TEST RESULTS

Reporting Period May 25,2022 to June 24/2023

Representative Section Material Sources Average Remark


Degree of
Degree of
Test Pit Compactio

FMC
Side

FDD
No. RFI No. Date Tested Purpose For Layer Compactio
Station n (Min.

From
n (Min. Returned Acceptan

To
Side Chainage MDD OMC 95%) back ce
95%)

Prepared By Lab. Tech. Checked By PME

Name Name

Signature Signature

Date Date
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector
Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project
It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road
Ethiopian Road Adminstration
ECDSWCTDSWS Consultants
APPENDIX 5.9 - COARSE AGGREGATE FOR CONCRETE LABORATORY TEST RESULTS
Reporting Period May 25,2022 to June 24/2023
Specific Gravity

Offset
Blending Unit Weight light
& Water Wet Seive Analysis (% Passing) ACV FI Adh.C
Proportion (%)
Absorption
(gm/cc) weigh Organi
Sampli Sample Visual c Clay Other oatin
No. Sample Side Test Date t impuriti lumps deletrio Passin
LAA SSS
g
Remark
ng No. Description
Source Oven materi es us g Value
Station (Km) 20mm 10mm SSD W.A. Rodded Loose 25 19 9.5 4.75 0.075 (%) (%)
Dry al substa 0.075m (%)
nces m sieve

Returned
Project Requirement / Specification - - - - Acceptance
back

5-25mm
IFH Main Meshenti Yes
1
comp Crusher
19km RHS March 2, 2023 15 Crushed 75.0 25.0 1,676 0.47 0,31 100.0 82.6 22.2 3.8 0.2 Suitable
Aggregate

13 - 25mm
IFH Main Meshenti
2
comp Crusher
19km RHS March 2, 2023 15 Crushed 2.64 2.62 0.60 1,469 100.0 76.8 1.3 0.1 0.0 Suitable Yes
Aggregate

5-25mm
IFH Main Meshenti
3
comp Crusher
19km RHS March 2, 2023 15 Crushed 2.56 2.54 0.75 1,413 100.0 100.0 84.7 15.1 0.9 Suitable Yes
Aggregate

Prepared By Lab. Tech. Checked By PME


Name Name
Signature Signature
Date Date
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector
Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project
It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road
Ethiopian Road Adminstration
ECDSWCTDSWS Consultants
APPENDIX 5.10- FINE AGGREGATE (CRUSHED SAND) FOR CONCRETE LABORATORY TEST RESULTS
Reporting Period May 25,2022 to June 24/2023
Specific Gravity Unit

Offset
light

Equivalent
& Water Weight FM Wet Sieve Analysis ( % Passing)
Absorption (gm/cc) weigh Organi

Sand
Sampli Sample Visual c Clay Other
No. Sample Side Test Date t impuriti lumps deletrio Passin
LAA SSS Remark
ng No. Description
Source materi es us g
Station (Km) SSD
Oven
W.A.
Rodde
Loose (%) 9.50 4.75 2.36 1.18 0.60 0.30 0.15 0.075
Dry d al substa 0.075m
nces m sieve

Returned
Project Requirement / Specification - - Acceptance
back

IFH Main Meshenti 0-4.75mm


1
comp Crusher
19km RHS March 2, 2023 16 Crushed Sand
2.66 2.61 1.7 ### No. 5 1.0 1.52 7.0 92.9 100.0 98.7 81.0 51.6 29.0 12.1 2.9 1.4 Suitable Yes

Prepared By Lab. Tech. Checked By PME


Name Name
Signature Signature
Date Date
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector
Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project
It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road
Ethiopian Road Adminstration
ECDSWCTDSWS Consultants
APPENDIX 5.11 - MASONARY STONE LABORATORY TEST RESULTS
Reporting Period May 25,2022 to June 24/2023

Offset
Specific Gravity & Compressive
ACV LAA FI SSD EI TFV
Water Absorption Strength
No. Station Side Sample No. Testing Date Visual Description Remark
Oven Dry Wet Wet/Dry
(Km) SSD
Dry
W.A. (MPA) (%) (%) (%) (%) (%)
(KN) (KN) Ratio

Project Requirement / Specification - - - - - - - - - - - - Acceptance Returned back

Bahir dar City around


1
Ledeta
17 4-Mar-23 Masonery Stone - - 1.72 24 - - - - - - - - Suitable Yes

2 Bahir darAir port 17 4-Mar-23 Masonery Rock - - 1.06 31 - - - - - - - - Suitable Yes

1+740 LHS Offset


3 3.5km to Kunzela 3.50 LHS 57 14/06/23 Masonery Rock - - 1.85 17 - - - - - - - - Suitable Yes
Road

1+100 - 1+600 BS
3
Road way
32 15/5/2023 Masonery Rock - - 1.32 17 - - - - - - - - Suitable Yes

Prepared By Material Inspector/ Lab. Tech. Checked By PME


Name Name
Signature Signature
Date Date
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector

Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project

It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road

Ethiopian Road Adminstration

ECDSWCTDSWS Consultants

APPENDIX 5.12- CONCRETE MIX DESIGN LABORATORY TEST RESULTS

Reporting Period May 25,2022 to June 24/2023

Crushed sand from KM.18, Bhirdar city (Meshenti Crusher Plant) and stock pilled at production
SOURCE OF SAND 0.003375m3
yard VOLUME OF MOLD

SOURCE OF AGGREGATE Produced at KM.18 from Bhirdar city (Meshenti Crusher Plant) and stock pilled at production yard 0.0225m2
AREA OF CRUSHING FACE

Actual Batch Mass of Ingredients 7th Days 28th Days Remark


Average
Type of Slump Water/
Ttpe of Coarse Coarse Crushed Sand Slump Average Average
No. Mix Required Cement Cement Cast Date
Cement Aggregate 20 Aggregate 10 Sand (Fine Corrected Com. Correcte Com. Returned
Design (mm) Ratio Content/ Water (L) Test Date Test Date Acceptance
back
mm Nominal mm Nominal Aggregate (mm) Load Strength d Load Strength
kgm3
Size (kg/M3) Size (kg/M3) (kg/M3) (Mpa) (Mpa)

Dangote
1 C-25 25-75 0.59 358 155.9 842.9 281.8 968.9 April 25, 2023 40 May 2, 2023 943.0 42 May 23, 2023 1308.0 58 Accepted Yes
OPC

Dangote
2 C-25 25-75 0.59 358 155.9 842.9 281.8 968.9 April 25, 2023 40 May 2, 2023 644.0 29 May 23, 2023 1071.0 48 Accepted Yes
PPC

Dangote
3 C-30 25-75 0.5 470.9 174.8 834 278.8 819.3 March 3, 2023 37.5 March 10, 2023 1033.0 46 March 31, 2023 1414.0 64 Accepted Yes
OPC

Dangote
4 C-30 25-75 0.5 414.2 173 833.7 278.7 878.1 March 10, 2023 37.5 March 17, 2023 1331.0 58 April 7, 2023 1385.0 62 Accepted Yes
OPC

Dangote
5 C-30 25-75 0.5 414.2 173 833.7 278.7 878.1 March 9, 2023 35 March 16, 2023 702.0 31 April 6, 2023 1076.0 48 Accepted Yes
PPC

6 C-30 East OPC 25-75 0.5 414.2 173 833.7 278.7 878.1 March 9, 2023 30 March 16, 2023 1103.0 49 April 6, 2023 1397.0 62 Accepted Yes

7 C-30 East PPC 25-75 0.5 414.2 173 833.7 278.7 878.1 March 9, 2023 35 March 16, 2023 858.0 38 April 6, 2023 1123.0 50 Accepted Yes

Prepared By Material Inspector/ Lab. Tech. Checked By PME

Name Name

Signature Signature

Date Date

Page 44
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector

Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project

It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road

Ethiopian Road Adminstration

ECDSWCTDSWS Consultants

APPENDIX 5.13 - SITE CONCRETE MATERIALS LABORATORY TEST RESULTS

Reporting Period May 25,2022 to June 24/2023


Test Date Compressive Strength
Cement Remark
Request Concrete Slump Number 7 Days 28 Days 45 Days 90 Days
No. Date Casted Content Structure Type Station Casted
No. Class (mm) of Cube
(Kg/m3)
Returned
7 Days 28 Days 45 Days 90 Days Load Mpa Load Mpa Load Mpa Load Mpa Acceptance
back

1 000174 March 9, 2023 C-25 471 kg/m3 40 6 March 9, 2023 April 6, 2023 - - Drainage Bottom Slab 0+920 - 0+935 RHS 913 41 1153 51 - - - - Accepted Yes

2 000179 March 10, 2023 C-25 471 kg/m3 43 6 March 17, 2023 April 7, 2023 - - Drainage Bottom Slab 0+935 - 0+970 RHS 941 42 1005 45 - - - - Accepted Yes

with admixture
3 000186 March 12, 2023 C-25 471 kg/m3 45 6 March 19, 2023 - - - Drainage Bottom Slab 0+970 - 1+070 RHS 992 44 - - - - - -
Accepted
Yes

4 000186 March 12, 2023 C-25 471 kg/m3 45 6 March 19, 2023 April 9, 2023 - - Drainage Bottom Slab 0+970 - 1+070 RHS 900 40 1077 48 Accepted Yes

5 000265 March 24, 2023 C-25 471 kg/m3 42 6 March 31, 2023 April 21, 2023 - - Drainage Bottom Slab 1+150 - 1+190 LHS 683 49 1052 47 - - - - Accepted Yes

6 000274 March 25, 2023 C-25 414 kg/m3 42 6 April 1, 2023 April 22, 2023 - - Drainage Bottom Slab 1+190 - 1+240 LHS 598 27 1119 50 - - - - Accepted Yes

7 000288 March 26, 2023 C-25 414 kg/m3 42 6 April 2, 2023 April 23, 2023 - - Drainage Bottom Slab 1+225 - 1+265 LHS 1054 47 937 42 - - - - Accepted Yes

8 000294 March 27, 2023 C-25 414 kg/m3 40 6 April 3, 2023 April 24, 2023 - - Drainage Bottom Slab 1+268 - 1+300 LHS 382 17 941 42 - - - - Accepted Yes

9 000311 March 28, 2023 C-25 414 kg/m3 45 6 April 4, 2023 April 25, 2023 - - Drainage Bottom Slab 1+115 - 1+150 LHS 530 24 612 27 - - - - Accepted Yes

10 000323 March 29, 2023 C-25 414 kg/m3 44 6 April 5, 2023 April 26, 2023 - - Drainage Bottom Slab 1+100 - 1+115 LHS 688 20 666 30 - - - - Accepted Yes

11 000334 March 31, 2023 C-25 414 kg/m3 40 6 April 7, 2023 April 28, 2023 - - Drainage Bottom Slab 1+070 - 1+095 RHS 523 23 790 35 - - - - Accepted Yes

12 000365 April 1, 2023 C-25 414 kg/m3 45 6 April 8, 2023 April 29, 2023 - - Drainage Bottom Slab 1+095 - 1+155 RHS 737 33 1259 56 - - - - Accepted Yes

Vehicular Crossing of
13 000404 April 4, 2023 C-25 414 kg/m3 43 6 April 11, 2023 May 2, 2023 - -
Drainage Bottom Slab
1+108 - 1+114 RHS 572 30 648 29 - - - - Accepted Yes

14 000461 April 9, 2023 C-25 414 kg/m3 43 6 April 16, 2023 May 7, 2023 - - Drainage Bottom Slab 0+820 - 0+880 RHS 556 26 569 25 - - - - Accepted Yes

15 000477 April 11, 2023 C-25 414 kg/m3 45 6 April 11, 2023 May 9, 2023 - - Drainage Bottom Slab 0+830 - 0+850 RHS 530 24 792 35 - - - - Accepted Yes

Vehicular Crossing of
16 000470 April 10, 2023 C-25 414 kg/m3 45 6 April 17, 2023 May 8, 2023 - -
Drainage Bottom Slab
0+981 - 0+990 RHS 551 24 588 26 - - - - Accepted Yes

17 000486 April 13, 2023 C-25 414 kg/m3 48 6 April 20, 2023 May 11, 2023 - - Drainage Bottom Slab 0+760 - 0+830 RHS 352 16 564 25 - - - - Accepted Yes

18 000496 April 20, 2023 C-25 414 kg/m3 50 6 April 27, 2023 May 18, 2023 - - Drainage Bottom Slab 1+280 - 1+300 RHS 380 17 569 25 - - - - Accepted Yes

19 000505 April 21, 2023 C-25 414 kg/m3 47 6 April 28, 2023 May 19, 2023 - - Drainage Bottom Slab 1+360 - 1+380 RHS 267 12 811 36 - - - - Accepted Yes

20 000504 April 21, 2023 C-25 414 kg/m3 47 6 April 28, 2023 May 19, 2023 - - Drainage Bottom Slab 1+300 - 1+326 RHS 267 12 811 36 - - - - Accepted Yes

21 000517 April 22, 2023 C-25 414 kg/m3 48 6 April 29, 2023 May 20, 2023 - - Drainage Bottom Slab 1+342 - 1+360 RHS 317 14 780 35 - - - - Accepted Yes
Vehicular Crossing of
22 000525 April 23, 2023 C-25 414 kg/m3 45 6 April 30, 2023 May 21, 2023 - -
Drainage Bottom Slab
1+326 - 1+342 RHS 346 15 714 32 - - - - Accepted Yes

23 000557 April 27, 2023 C-25 414 kg/m3 45 6 May 4, 2023 May 25, 2023 - - Drainage Bottom Slab 0+510 - 0+565 RHS 419 19 717 32 - - - - Accepted Yes

24 000571 April 28, 2023 C-25 414 kg/m3 43 6 May 5, 2023 May 26, 2023 - - Drainage Bottom Slab 0+445 - 0+510 RHS 671 30 871 39 - - - - Accepted Yes

25 000577 April 29, 2023 C-25 414 kg/m3 42 6 May 6, 2023 May 27, 2023 - - Drainage Bottom Slab 0+380 - 0+445 RHS 705 31 814 36 - - - - Accepted Yes

26 000542 April 25, 2023 C-25 358 kg/m3 43 6 May 2, 2023 May 23, 2023 - - Drainage Bottom Slab 0+607 - 0+650 RHS 232 10 1005 45 - - - - Accepted Yes

27 000548 April 26, 2023 C-25 414 kg/m3 47 6 May 3, 2023 May 24, 2023 - - Drainage Bottom Slab 0+565 - 0+607 RHS 349 16 1078 48 - - - - Accepted Yes

28 000614 May 3, 2023 C-25 358 kg/m3 40 6 May 10, 2023 May 31, 2023 - - Drainage Bottom Slab 1+475 - 1+560 RHS 484 28 601 27 - - - - Accepted Yes

29 000627 May 4, 2023 C-25 358 kg/m3 42 6 May 11, 2023 June 1, 2023 - - Drainage Bottom Slab 1+380 - 1+475 RHS 455 20 623 28 - - - - Accepted Yes

30 000643 May 5, 2023 C-25 358 kg/m3 43 6 May 12, 2023 June 2, 2023 - - Drainage Bottom Slab 1+560 - 1+620 RHS 353 16 570 25 - - - - Accepted Yes

31 000654 May 6, 2023 C-25 358 kg/m3 45 6 May 13, 2023 June 3, 2023 - - Drainage Bottom Slab 1+300 1+380 LHS 604 27 617 27 - - - - Accepted Yes

32 000661 May 7, 2023 C-25 358 kg/m3 47 6 May 14, 2023 June 4, 2023 - - Drainage Bottom Slab 0+215 - 0+0+280 LHS 422 19 634 28 - - - - Accepted Yes

33 000663 May 8, 2023 C-25 358 kg/m3 40 6 May 15, 2023 June 5, 2023 - - Drainage Bottom Slab 0+150 - 0+215 LHS 599 27 685 30 - - - - Accepted Yes

34 000689 May 11, 2023 C-25 358 kg/m3 45 6 May 18, 2023 June 8, 2023 - - Drainage Bottom Slab 0+265 - 0+330 RHS 462 21 623 28 - - - - Accepted Yes

35 000729 May 11, 2023 C-25 358 kg/m3 45 6 May 18, 2023 June 8, 2023 - - Drainage Bottom Slab 0+329 - 0+338.5 RHS 462 21 623 28 Accepted Yes

Vehicular Crossing of
36 000725 May 14, 2023 C-25 414 kg/m3 38 6 May 21, 2023 June 11, 2023 - -
Drainage Bottom Slab
0+338.5 - 0+343.5 RHS 606 27 795 35 - - - - Accepted Yes

Vehicular Crossing of
37 000726 May 14, 2023 C-25 414 kg/m3 38 6 May 21, 2023 June 11, 2023 - -
Drainage Bottom Slab
0+352.2 - 0+357.2 RHS 606 27 795 35 - - - - Accepted Yes

38 000727 May 14, 2023 C-25 358 kg/m3 38 6 May 21, 2023 June 11, 2023 - - Drainage Bottom Slab 0+357.2 - 0+372 RHS 606 27 795 35 - - - - Accepted Yes

39 000728 May 14, 2023 C-25 358 kg/m3 48 6 May 21, 2023 June 11, 2023 - - Drainage Bottom Slab 0+343.5 - 0+352.2 RHS 540 24 704 31 - - - - Accepted Yes

40 000730 May 15, 2023 C-25 358 kg/m3 48 6 May 21, 2023 June 11, 2023 - - Drainage Bottom Slab 0+372 - 0+380 RHS 540 24 704 31 - - - - Accepted Yes

41 000738 May 15, 2023 C-25 358 kg/m3 48 6 May 22, 2023 June 12, 2023 - - Drainage Bottom Slab 0+247 - 0+260 RHS 445 20 639 28 - - - - Accepted Yes

Vehicular Crossing of
42 000739 May 15, 2023 C-25 414 kg/m3 47 6 May 22, 2023 June 12, 2023 - -
Drainage Bottom Slab
0+240 - 0+247 RHS 735 33 974 43 - - - - Accepted Yes

43 000740 May 15, 2023 C-25 358 kg/m3 47 6 May 22, 2023 June 12, 2023 - - Drainage Bottom Slab 0+230 - 0+240 RHS 735 33 974 43 - - - - Accepted Yes

44 000754 May 16, 2023 C-25 358 kg/m3 48 6 May 23, 2023 June 13, 2023 - - Drainage Bottom Slab 0+200 - 0+226 HS 476 21 660 29 - - - - Accepted Yes

45 000756 May 16, 2023 C-25 358 kg/m3 48 6 May 23, 2023 June 13, 2023 - - Drainage Bottom Slab 0+175 - 0+185 RHS 476 21 660 29 Accepted Yes

46 000755 May 16, 2023 C-25 358 kg/m3 48 6 May 23, 2023 June 13, 2023 - - Drainage Bottom Slab 0+200 - 0+226 RHS 476 21 660 29 Accepted Yes

Vehicular Crossing of
47 000763 May 17, 2023 C-25 414 kg/m3 45 6 May 24, 2023 June 14, 2023 - -
Drainage Bottom Slab
0+185 - 0+200 RHS 523 23 729 32 Accepted Yes

48 000758 May 17, 2023 C-25 358 kg/m3 45 6 May 24, 2023 June 14, 2023 - - Drainage Bottom Slab 0+150 - 0+175 RHS 523 23 729 32 Accepted Yes

49 000758 May 17, 2023 C-25 414 kg/m3 45 6 May 24, 2023 June 14, 2023 - - Drainage Bottom Slab 0+150 - 0+175 RHS 523 23 729 32 - - - - Accepted Yes

50 000790 May 22, 2023 C-25 6 - - Drainage Bottom Slab 0+710 - 0+746 RHS - - - -
Lean concrete for
51 000807 May 24, 2023 C-15 6 - - Longitudinal Side Drainage 0+330 - 0+390 LHS - - - -
Outer Side
Lean concrete for
52 000810 May 24, 2023 C-15 6 - - Longitudinal Side Drainage 0+330 - 0+360 LHS - - - -
Inner Side
Lean concrete for
53 000818 May 25, 2023 C-15 6 - - Longitudinal Side Drainage 0+360 - 0+410 LHS - - - -
Inner Side

Vehicular Crossing of
54 000814 May 25, 2023 C-25 6 - -
Drainage Bottom Slab
0+746.5 - 0+761.5 RHS - - - -

Lean concrete for


55 000823 May 26, 2023 C-15 6 - - Longitudinal Side Drainage 0+390 - 0+410 LHS - - - -
Outer Side
Lean concrete for
56 000826 May 26, 2023 C-15 6 - - Longitudinal Side Drainage 0+310 - 0+330 LHS - - - -
Both Side
Lean concrete for
57 000835 May 26, 2023 C-15 6 - - Longitudinal Side Drainage 0+440 - 0+510 LHS - - - -
Inner Side
Lean concrete for
58 000834 May 26, 2023 C-15 6 - - Longitudinal Side Drainage 0+440 - 0+510 LHS - - - -
Outer Side
Lean concrete for
59 000838 May 27, 2023 C-15 6 - - Longitudinal Side Drainage 0+510 - 0+570 LHS - - - -
Both Side

60 000841 May 28, 2023 C-25 6 - - Drainage Bottom Slab 1+545 - 1+620 LHS - - - -

61 000868 June 1, 2023 C-25 6 - - Drainage Bottom Slab 1+452 - 1+545 LHS - - - -

62 000869 June 1, 2023 C-25 6 - - Drainage Bottom Slab 1+425 - 1+445 LHS - - - -

Vehicular Crossing of
63 000877 June 2, 2023 C-25 6 - -
Drainage Bottom Slab
1+448 - 1+452 LHS - - - -

Vehicular Crossing of
64 000883 June 3, 2023 C-25 6 - -
Drainage Bottom Slab
1+326 - 1+342 RHS - - - -

65 000898 June 5, 2023 C-25 6 - - Drainage Bottom Slab 1+380 - 1+383 LHS - - - -

Vehicular Crossing of
66 000897 June 5, 2023 C-25 6 - -
Drainage Bottom Slab
1+383 - 1+388 LHS - - - -

67 000896 June 5, 2023 C-25 6 - - Drainage Bottom Slab 1+388 - 1+425 LHS - - - -

Longitudinal Side Drainage


68 000911 June 8, 2023 C-30 6 - -
External pad
0+340 - 0+410 LHS

69 000923 June 9, 2023 C-25 6 - - Drainage Bottom Slab 1+620 - 1+735 RHS - - - -

Longitudinal Side Drainage


70 000927 June 10, 2023 C-25 6 - -
Internal pad
0+340 - 0+410 LHS - - - -

Vehicular Crossing of
71 000947 June 11, 2023 C-30 6 - -
Drainage Bottom Slab
0+118 - 0+122 LHS - - - -

72 000959 June 14, 2023 C-25 6 - - Drainage Bottom Slab 1+230 - 1+180 RHS

73 000972 June 15, 2023 C-25 6 - - Drainage Bottom Slab 1+700 - 1+720 LHS

Longitudinal Side Drainage


74 000963 June 15, 2023 C-30 6 - -
External pad
0+440 - 0+490 LHS - - - -

75 000971 June 15, 2023 C-25 6 - - Drainage Bottom Slab 1+750 - 1+660 LHS - - - -

76 000970 June 15, 2023 C-25 6 - - Drainage Bottom Slab 1+620 - 1+643 LHS - - - -

Vehicular Crossing of
77 000976 June 16, 2023 C-25 6 - -
Drainage Bottom Slab
0+643 - 0+650 LHS - - - -

78 000978 June 16, 2023 C-25 6 - - Drainage Bottom Slab 1+660 - 1+700 LHS - - - -

79 000992 June 16, 2023 C-25 6 - - Drainage Bottom Slab 0+1380 - 0+150 RHS
Longitudinal Side Drainage
80 000981 June 17, 2023 C-30 6 - -
External pad
0+490 - 0+570 LHS

81 000993 June 17, 2023 C-25 6 - - Drainage Bottom Slab 0+100 - 0+132 RHS

Vehicular Crossing of
82 000991 June 18, 2023 C-25 6 - -
Drainage Bottom Slab
0+132 - 0+138 RHS

83 001000 June 19, 2023 C-25 6 - - Drainage Bottom Slab 0+035 - 0+060 LHS - - - -

Vehicular Crossing of
84 001003 June 20, 2023 C-25 6 - -
Drainage Bottom Slab
0+225 - 0+231 RHS

0+184.25 - 0+200.25
85 001019 June 22, 2023 C-25 6 - - Drainage Top Slab
LHS

Longitudinal Side Drainage


86 001024 June 23, 2023 C-30 6 - -
Internal pad
0+490 - 0+560 LHS

87 001044 June 25, 2023 C-25 6 - - Drainage Top Slab 0+000 - 0+030 LHS

Lean concrete for


88 001053 June 26, 2023 C-15 6 - - Longitudinal Side Drainage 0+410 - 0+420 LHS - - - -
Both Side
Lean concrete for
89 001057 June 26, 2023 C-15 6 - - Longitudinal Side Drainage 0+425 - 0+440 LHS - - - -
Both Side
Lean concrete for
90 001061 June 27, 2023 C-15 6 - - Longitudinal Side Drainage 0+420 - 0+425 LHS - - - -
Both Side
Lean concrete for
91 001066 June 27, 2023 C-15 6 - - Longitudinal Side Drainage 0+570 - 0+600 LHS
Both Side
Lean concrete for
92 001071 June 28, 2023 C-15 6 - - Longitudinal Side Drainage 0+610 - 0+650 LHS
Both Side
Lean concrete for
93 001077 June 29, 2023 C-15 6 - - Longitudinal Side Drainage 0+600 - 0+610 LHS
Both Side
Lean concrete for
94 001084 June 30, 2023 C-15 6 - - Longitudinal Side Drainage 0+650 - 0+670 LHS
Both Side
Lean concrete for
95 001085 June 30, 2023 C-15 6 - - Longitudinal Side Drainage 0+410 - 04+20 LHS
Both Side
Lean concrete for
96 001086 June 30, 2023 C-15 6 - - Longitudinal Side Drainage 0+420 - 0+425 LHS
Both Side
Lean concrete for
97 001087 June 30, 2023 C-15 6 - - Longitudinal Side Drainage 0+425 - 0+440 LHS
Both Side

Vehicular Crossing of
98 001094 July 1, 2023 C-25 6 - -
Drainage Bottom Slab
0+620 - 0+654.3 RHS

99 001095 July 1, 2023 C-25 6 - - Drainage Top Slab 0+654.3 - 0+660 RHS

Longitudinal Side Drainage


100 001100 July 3, 2023 C-30 6 External pad both side
0+570 - 0+600 LHS

Vehicular Crossing of
101 001098 July 3, 2023 C-25 6 - -
DrainageTop Slab
0+240 - 0+247 RHS

102 011009 July 5, 2023 C-25 6 - - Drainage Bottom Slab 1+083 - 1+100 LHS

Vehicular Crossing of
103 001126 July 6, 2023 C-25 6 - -
DrainageTop Slab
1+108 - 1+114 RHS

Longitudinal Side Drainage


104 001138 July 8, 2023 C-30 6 External pad
0+610 - 0+660 LHS

Vehicular Crossing of
105 001140 July 9, 2023 C-30 6 - -
DrainageTop Slab
1+383 - 1+388 LHS

Curb stone Insitu casting


106 001176 July 13, 2023 C-25 6 - -
type 1 outer edge
0+820 - 1+020 RHS

Longitudinal Side Drainage


107 001188 July 14, 2023 C-30 6 External pad
0+610 - 0+640 LHS

Longitudinal Side Drainage


108 001194 July 15, 2023 C-30 6 Vecular crossing External 0+600 - 0+610 LHS
side pad
Longitudinal Side Drainage
109 001199 July 16, 2023 C-30 6 pedistrian crossing cover
0+300 - 0+340 LHS

Longitudinal Side Drainage


110 001197 July 16, 2023 C-30 6 - - Vecular crossing External 0+600 - 0+610 LHS
side pad

Vehicular Crossing of
111 001206 July 16, 2023 C-30 6 - -
DrainageTop Slab
0+132 - 0+138 RHS

Longitudinal Side Drainage


112 001224 July 19, 2023 C-30 6 Iternal pad
0+650 - 0+670 LHS

Longitudinal Side Drainage


113 001220 July 19, 2023 C-30 6 pedistrian crossing cover
0+300 - 0+340 LHS

Longitudinal Side Drainage


114 001229 July 20, 2023 C-30 6 pedistrian crossing cover
0+300 - 0+340 LHS

Longitudinal Side Drainage


115 001233 July 21, 2023 C-30 6 pedistrian crossing cover
0+300 - 0+340 LHS

Pedistrian crossing for minor


116 001233 July 21, 2023 C-25 6 ditch cover
Pre - cast

Longitudinal Side Drainage


117 001238 July 22, 2023 C-30 6 pedistrian crossing cover
0+300 - 0+340 LHS

Longitudinal Side Drainage


118 001249 July 24, 2023 C-30 6 pedistrian crossing cover
0+340 - 0+420 LHS

Longitudinal Side Drainage


119 001252 July 25, 2023 C-30 6 pedistrian crossing cover
0+340 - 0+420 LHS

120 001253 July 25, 2023 C-25 6 Tiles for Walkway Pre - cast

Longitudinal Side Drainage


121 001268 July 26, 2023 C-30 6 pedistrian crossing cover
0+340 - 0+420 LHS

122 001276 July 27, 2023 C-25 6 Tiles for Walkway Pre - cast

Longitudinal Side Drainage


123 001273 July 27, 2023 C-30 6 - -
External side pad
0+640 - 0+660 LHS

Longitudinal Side Drainage


124 001286 July 28, 2023 C-30 6 pedistrian crossing cover
0+340 - 0+420 LHS

125 001285 July 28, 2023 C-25 6 Tiles for Walkway Pre - cast

126 001293 July 29, 2023 C-25 6 Tiles for Walkway Pre - cast

Longitudinal Side Drainage


127 001292 July 29, 2023 C-30 6 pedistrian crossing cover
0+340 - 0+420 LHS

128 001295 July 31, 2023 C-25 6 Tiles for Walkway Pre - cast

Longitudinal Side Drainage


129 001299 July 31, 2023 C-30 6 pedistrian crossing cover
0+340 - 0+420 LHS

130 001313 August 1, 2023 C-25 6 Tiles for Walkway Pre - cast

Longitudinal Side Drainage


131 001311 August 1, 2023 C-30 6 pedistrian crossing cover
0+340 - 0+420 LHS

Longitudinal Side Drainage


132 001318 August 2, 2023 C-30 6 pedistrian crossing cover
0+340 - 0+420 LHS

133 001319 August 2, 2023 C-25 6 Tiles for Walkway Pre - cast

134 001324 August 3, 2023 C-25 6 Tiles for Walkway Pre - cast
Prepared By Lab. Tech. Checked By PME

Name Name

Signature Signature

Date Date
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector
Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project
It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road
Ethiopian Road Adminstration
ECDSWCTDSWS Consultants
APPENDIX 5.14 - REINFORCEMENT BAR LABORATORY TEST RESULTS
Reporting Period May 25,2022 to June 24/2023

Yield
Nominal Cross sectional Elongatio
No. Station Side Test Date Sample No. Visual Description Purpose Mass/me Strength Test Remark
Diameter (mm) Area (mm2) n(%) Permissab
ter(kg/m) (Mpa)
Ultimate le Varation Conducted at
Strength in Weight
(Mpa) (%)
Project Requirement / Specification - - Acceptance Returned back

Tested on
IFH Main
1 13-Mar-23 15/RB/168 Reinforcement Bar Concrete 8 50.265 0.387 632.647 700.388 10.05 central Accepted Yes
comp
laboratory

Tested on
2 IFH Main comp 13-Mar-23 15/RB/168 Reinforcement Bar Concrete 12 113.1 0.840 568.037 663.057 14.404 central Accepted Yes
laboratory

Tested on
IFH Main
3 14-Mar-23 15/RB/169 Reinforcement Bar Concrete 16 201.1 1.500 585.839 686.430 14.953 central Accepted Yes
comp
laboratory

Tested on
IFH Main
4 15-Mar-23 15/RB/170 Reinforcement Bar Concrete 20 314.2 2.443 610.413 711.294 18.373 central Accepted Yes
comp
laboratory

Prepared By Lab. Tech. Checked By PME

Name Name

Signature Signature

Date Date
Ethiopian Construction Design and Supervision Works Corporation, Transport Design and Supervision Works Sector
Project: Mekaneyesus/Estie-Simada –Saint Road ,Contract I: Mekaneyesus/Estie-Simada Road Project
It’s Supplementary agreement No.01 Construction works of 1.75 km from Kunzila Junction - Amhara Roads Authority Road
Ethiopian Road Adminstration
ECDSWCTDSWS Consultants

APPENDIX 5.15 - QUALITY OF WATER LABORATORY TEST RESULTS


Reporting Period May 25,2022 to June 24/2023

28+500-29+000 FW 28+860

Prepared By Lab. Tech. Checked By PME

Name Name

Signature Signature

Date Date
Construction Supervision of Melkasa – Sodere – Nurera – Metahara Road Pro
ETHIOPIAN ROAD ADMINISTRATION
TRANSNATIONAL ENGINEERS PLC
APPENDIX 8.25 - ASPHALT AGGREGATE MATERIALS LABORATORY TEST RESULTS

Wet Sieve Analysis (% of

25 19.5 9.5

Specification▲
mm mm mm
Station Offset Side Sample No. Test Date Source of Material Agg.Size (mm) Visual Description

100 90-100 56-80

Page59of64
hara Road Project (94Km)

For the Month of June 25,2022 - September 25,2022


Sieve Analysis (% of Passing) TFV, % Bulk
Wat. Sand
ACV,% Specific FI LAA SSS
4.75 2.36 0.3 0.075 Dry Wet Wet/ Dry Abson.% Equivalent AIV (%)
Gravity
mm mm mm mm
Test Conducted at Remark

max max max12


35-65 23-49 5--15 2--8 max25 min160 75 max2 max50 MAX50
25 30 BYSODIUM

Page60of64
Construction Supervision of Melkasa – Sodere – Nurera – Metahara Road Project (94Km)
ETHIOPIAN ROAD ADMINISTRATION
TRANSNATIONAL ENGINEERS PLC
APPENDIX 8.29 -ASPHALT MIX DESIGN LABORATORY TEST RESULTS
For the Month of June 25,2022 - September 25,2022

Specification
Optimum Specific gravity Air Filler to
VFA Stability in Flow in Retained
Description/ Location bitumen content Void VMA (%) binder
(%) Kn mm stability Test
Date paved (%) (%) ratio Remark
Conducted at
GMM Bulk Aggregate
From To Side < 5.5 0.05 >13 65-75 >8 2-3.5 0.6-1.2 > 75%

page61of64
Construction Supervision of Melkasa – Sodere – Nurera – Metahara Road Project (94Km)
ETHIOPIAN ROAD ADMINISTRATION
TRANSNATIONAL ENGINEERS PLC
APPENDIX 8.26- PRIME COAT (MC 30) MATERIALS LABORATORY TEST RESULTS

For the Month of June 25,2022 - September 25,2022

Specific
Gravity of Sample taken Rate of Average Rate of
Req. No. Inspectoin Date From To Side Tempreture Bitumen Kerosene Remark
prime coat from spray spray
g/cc

17+760 0.99
17+890 1.00
29416/WOR/22 June 27, 2022 17+700 18+270 F/W 55 C
o
58% 42% 0.924 18+000 1.02 1.01
18+120 1.06
18+240 1.01
Construction Supervision of Melkasa – Sodere – Nurera – Metahara Road Project (94Km)
ETHIOPIAN ROAD ADMINISTRATION
TRANSNATIONAL ENGINEERS PLC
APPENDIX 8.27 -MARSHAL LABORATORY TEST RESULTS
For the Month of June 25,2022 - September 25,2022

Specification
Optimum Specific gravity Air Filler to
VFA Stability in Flow in Retained
Description/ Location bitumen content Void VMA (%) binder
(%) Kn mm stability Test
Sr.N0 Date paved (%) (%) ratio Remark
Conducted at
GMM Bulk Aggregate
From To Side < 5.5 0.05 >13 65-75 >8 2-3.5 0.6-1.2 > 75%

1 march 31 2022 31+430 32+160 FW 5.2 2.34 3.9 15 74 13 2.2


2 march 30 2022 32+160 32+920 FW 5.2 2.345 4.7 15 69 13 2.1

page63of64
Construction Supervision of Melkasa – Sodere – Nurera – Metahara Road Project (94Km)
ETHIOPIAN ROAD ADMINISTRATION
TRANSNATIONAL ENGINEERS PLC
APPENDIX 8.28 - 60/70 GRADE BITUMEN TEST RESULTS
For the Month of June 25,2022 - September 25,2022

Min 0 0 0 0 0 0 0 0 0 0 0
Max 0 0 0 0 0 0 0 0 0 0 0
Ave 0 0 0 0 0 0 0 0 0 0 0

page64of64