Venus 2800 Installationsmanual UK
Venus 2800 Installationsmanual UK
Venus 2800 Installationsmanual UK
Manual
1
07-03-2019
BioKube Venus 2800
Instruction manual
Indhold
1 Introduction ................................................................................................................................... 3
Precautions when Working with Wastewater .................................................................................. 4
Installation ............................................................................................................................................. 5
Foundation........................................................................................................................................ 5
Confirmation of Packing List ........................................................................................................... 5
Inspection of Vital Components .................................................................................................... 5
Unloading and relocating the Venus 2800 unit ........................................................................... 6
Installation of Venus 2800................................................................................................................ 7
2 Installation of settling tank........................................................................................................... 8
Step 1 – Placement ...................................................................................................................... 9
Step 2 – Inlet ................................................................................................................................ 10
Step 3 – Outlet ............................................................................................................................ 11
Step 4 – Phosphorous Removal (Optional) ............................................................................. 11
Step 5 – Power to the control box............................................................................................ 12
Step 6 – External alarm .............................................................................................................. 13
Step 7 – Control Box ................................................................................................................... 15
Control Scheme – Installation....................................................................................................... 16
www.BioKube.dk 2
07-03-2019
BioKube Venus 2800
Instruction manual
1 Introduction
This manual includes the procedures and guidelines for the installation,
commissioning, operation, maintenance and troubleshooting of the BioKube Venus
2800 treatment plant.
The Venus 2800 system is designed to treat ordinary domestic sewage wastewater.
Unless specifically approved by BioKube, no other forms of wastewater, such as
industrial wastewater, can be fed through the treatment system.
The BioKube Venus 2800 system is designed for treating wastewater capacities
specified by BioKube. The plant allows for fluctuations in both concentrations and
volume of the incoming water. However, if the average daily load exceeds the
capacity of the designed system, a larger system or additional units will be required
to be installed.
www.BioKube.dk 3
07-03-2019
BioKube Venus 2800
Instruction manual
www.BioKube.dk 4
07-03-2019
BioKube Venus 2800
Instruction manual
Installation
Foundation
A levelized foundation should be completed prior to arrival of the Venus 2800
system, which will make the installation faster when the equipment is delivered.
www.BioKube.dk 5
07-03-2019
BioKube Venus 2800
Instruction manual
Tank dimensions are found in the Venus 2800 outline and load drawing sheet.
When relocating the unit, sludge must be emptied and disposed of according to
local regulation. (stabilization, landfill, etc.)
The unit is equipped with four lifting eyes used when lifting the system.
Picture 1
Notice: Do not lift the Venus 2800 units with water inside. The unit must
be transported and handled carefully to avoid damage to the
components installed inside. Assess all components for damages after
each transportation.
www.BioKube.dk 6
07-03-2019
BioKube Venus 2800
Instruction manual
2. The buffer tank will even out any fluctuations for the incoming water load. A
float switch placed close to the top of the buffer tank works as an emergency
switch and runs the inlet pump continuously if activated. In case there is ever
a buffer tank pump failure, an overflow ensures that the untreated
wastewater is directed to the outlet and will not run over the edge of the
system.
3. In the biological treatment zone 1 the submerged filter, with a large surface
area for the microbes, is exposed to heavy aeration. The system will never
clog and does not need any maintenance or chemicals.
4. Bio sludge settles in the settling zone. Airlift pumps in bottom keep the settling
zone clean by recirculating the bio sludge to the settling tank.
5. In the biological treatment zone 2 the submerged filter, with a large surface
area for the microbes, is exposed to heavy aeration. The system will never
clog and does not need any maintenance or chemicals.
6. Bio sludge settles in the settling zone. Airlift pumps in bottom keep the settling
zone clean by recirculating the bio sludge to the settling tank.
www.BioKube.dk 7
07-03-2019
BioKube Venus 2800
Instruction manual
The function of the BioKube Venus 2800 system and the flow through the system
Terrain
www.BioKube.dk 8
07-03-2019
BioKube Venus 2800
Instruction manual
Step 1 – Placement
The unit must be placed on a flat and leveled load bearing surface with a
maximum level variation of +/- 1 cm high per 4 meters across. Surface must consist
of either (i) stable compressed gravel, (ii) at least 200mm cast concrete slab built on
stable soil, or (iii) a checker plate capable of handling the load, see Picture 2.
Picture 2
All pipe connections to the unit must have the dimension Ø160mm (External
measure) and all connections from the unit must have the dimension Ø160mm. In
Picture 3 connections, placement and dimensions are shown. For a full overview of
the unit, please see the Outline and Load drawing.
www.BioKube.dk 9
07-03-2019
BioKube Venus 2800
Instruction manual
Picture 3
If the unit is placed in the ground and the water table is high, the unit must be
secured from buoyancy. This is done making an in-situ concrete cast around the
base plate of the unit, see Picture 4. Make sure that necessary pipe connections
have been made before casting the concrete.
Picture 4
Step 2 – Inlet
Sewage water is led from the external septic tank to Venus 2800 Inlet. The
connection is made with an Ø110mm PCV pipe connected to the In-situ
connection at the inlet, see Picture 5.
www.BioKube.dk 10
07-03-2019
BioKube Venus 2800
Instruction manual
Inlet connection
Picture 5
The top of the Venus 2800 is made for a maximum weight of 100 kg/m2
Step 3 – Outlet
The treated sewage leaves the side of the Venus 2800 through an Ø110 mm outlet.
The stub out for the pipe connections are pre-fabricated ready to connect to, see
Picture 6. Remove cover for transportation and connect the outlet pipe to the
discharge point. Outlet pipe is placed inside the Venus 2800 during transportation.
Outlet connection
Picture 6
www.BioKube.dk 11
07-03-2019
BioKube Venus 2800
Instruction manual
All components for the chemical dosing are installed in the chemical tank and
inside the BioKube Mars system.
Only the suction hose and dosing pump cable from the chemical tank to the
controller inside the Mars Treatment System must be connected. The chemical tank
should be installed 200 mm above ground to prevent inflow from surface water into
the chemical tank.
Picture 7
Picture 8
Minimum requirement for the power supply cable to the plant is a 5 x 2.5 mm² core
(for 230V – 50Hz). This cable supplies both power to the plant and connects the
alarm unit. The cables are placed in the steel pipe going to the technical box, see
Picture 9.
www.BioKube.dk 12
07-03-2019
BioKube Venus 2800
Instruction manual
Picture 9
Standard BioKube Venus 2800 is powered with 230/110 Volt, 1 phase power supply.
The maximum current is 2-5 Ampere (5-15 for 110V areas) depending on the number
of pumps installed. The draw of maximum current occurs only while starting the inlet
pump. For the continuous use of blowers, the BioKube Mars only uses 300 - 600 watt.
It’s recommended that the Venus 2800 is connected to a separate fuse in the
electrical panel, which will ensure that issues can easily be isolated in the event
there’s a problem with the power supply to the treatment plant.
Power supply cable is not included. Length of the 5-core supply cable to be
determined on site based on distance to power source.
The alarm must be placed inside a building or be protected from the weather. The
alarm will go off both visually and audibly in case there’s a problem with the inflow
to the system, see Picture 10 and Picture 11.
www.BioKube.dk 13
07-03-2019
BioKube Venus 2800
Instruction manual
Picture 10
Picture 11
www.BioKube.dk 14
07-03-2019
BioKube Venus 2800
Instruction manual
In the center of the control unit the test button is found, see Picture 12. When
holding down the test button the following test sequence will loop the components
in the following steps: Inlet pump, dosing pump (where installed), valve 2, valve 1,
air pump 3, buzzer/alarm. There is a 3 second pause between the steps.
When the test button is released, the plant returns to its normal functions. The test
sequence will also be started whenever power to the system is switched on.
Picture 12
The system is switched on by turning the main switch in the technical box, see
Picture 13.
Picture 13
www.BioKube.dk 15
07-03-2019
BioKube Venus 2800
Instruction manual
ID REFERENCE
(SECTION) TASK DOCUMENTS ACCEPTANCE CRITERIA
Civil works is made according
Follow instructions in
Project specific layout to project specific layout and
3.1 section 3.1 prior to
drawings no cracks or similar
installing the equipment
deviations are observed
Follow instructions in
Supplied equipment is
section 3.2 after Project specific parts
3.2 according to Specific parts
equipment has arrived to list and packing list
list and packing list
customer
Follow instructions in
No damages or errors are
section 3.3 after Project specific parts
3.3 observed on the supplied
equipment has arrived to list and packing list
equipment
customer
www.BioKube.dk 16