WO number : WK220317.

222178
Description Install scaffolfing and open close insulation cladding for Perform inspection of Superhe
: spray #2 water left side TCV
Locaton : 11TH floor Boiler
Unit : SUPERHEATER DESUPERHEATER SPRAY #2 TCV ( P1LAE61AA181)

0,35

0,0
8
0,73
2

Circle=0,76

2 1

40
,2
=0
,R
12
2,
=
le
rc
Ci

,
=0
,82R
Circle=1,51

=0
e
rcl
Circle=0,76

Ci
0,337
0,15 0,08 1,05 0,08 0,15

1
1,51

DESCRIPTION
No Unit Length (M)Width (M) Volume (M ) 2
Remarks
1 2 0.73 1.51 2.2046 Body
2 4 0.180086 0.04597 0.536464 (End cap body) - (area circle pipe)= (3.14X0,240 2)-(3,14x0,1212)
Total Volume 2.741064 All volume
Notice: All sketch X2
inspection of Superheater desuperheater

Circle=0,76

1.51 3.14 2 0.240446 3.14 0.0576


40

0.76 3.14 2 0.121019 3.14 0.014641


,2
=0
,R

2
12
2,
=
le
rc

1
,12
Ci

=0
,8 2R
=0

0,121
e
rcl

1.05
Ci

0,337
0,73
Remarks

,240 2)-(3,14x0,1212)
l volume
0.180864
0.045973