For Iwan
For Iwan
For Iwan
222178
Description Install scaffolfing and open close insulation cladding for Perform inspection of Superhe
: spray #2 water left side TCV
Locaton : 11TH floor Boiler
Unit : SUPERHEATER DESUPERHEATER SPRAY #2 TCV ( P1LAE61AA181)
0,35
0,0
8
0,73
2
Circle=0,76
2 1
40
,2
=0
,R
12
2,
=
le
rc
Ci
,
=0
,82R
Circle=1,51
=0
e
rcl
Circle=0,76
Ci
0,337
0,15 0,08 1,05 0,08 0,15
1
1,51
DESCRIPTION
No Unit Length (M)Width (M) Volume (M ) 2
Remarks
1 2 0.73 1.51 2.2046 Body
2 4 0.180086 0.04597 0.536464 (End cap body) - (area circle pipe)= (3.14X0,240 2)-(3,14x0,1212)
Total Volume 2.741064 All volume
Notice: All sketch X2
inspection of Superheater desuperheater
Circle=0,76
2
12
2,
=
le
rc
1
,12
Ci
=0
,8 2R
=0
0,121
e
rcl
1.05
Ci
0,337
0,73
Remarks
,240 2)-(3,14x0,1212)
l volume
0.180864
0.045973
0.134891