Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Layout of R.C.C. Beam & Slab at +16.55 Mt. Height Level

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Schedule of R.C.C. Beam At +16.55 mt.

Height Level (M-25)


4
SIZE BOTTOM STEEL TOP STEEL STIRRUPS
3 5 BEAM NO. MID REMARK
B D FULL BAR CURTAIL BAR FULL BAR LEFT
CURTAIL BAR
RIGHT
CURTAIL BAR STEEL SUPPORT CENTER R0 Discription Date
C/C C/C
Revision

NOTES

SCHEDULE OF LAP LENGTH

MIX TOR
BEAMS,SLABS,TIES,etc.

7 COLUMNS,WALLS,etc.
6
Notes
GENERAL :-

CENTERING :-

SLABS:-

BEAMS SOFIT:-
8 10
WALLS / COLUMNS :-
9
VERTICALSIDE OF BEAMS :-

Layout of R.C.C. Beam & Slab At +16.55 mt. Height Level


CONCRETE :-
STEEL :-

MATERIAL TESTING AND CONCRETE CUBE TEST:-

A B A B A B DRG. TITLE :-

PROJECT PLANNER :-
LOCATION :- FOR :- PROJECT :-

CHECKED:- DRAWN:- SCALE :-


DATE:- DRG. NO. :-
A Beam-B1 B A Beam-B2 B A Beam-B3 B
Typical Details Of Beam
NOTE:-

Typical Details Of Beam Lap Length At Location of Splicing Typical Details Of Top/Bottom Bar Details of
Section A-A Section B-B
Depth Veries At Column Junction of Longitudinal Bars in Beam Discontinues At Column Joint Beam Stirrups

You might also like