RESUME

Dinesh Kumar Sahu Electrical Engineer


154, V+P-PadmaniyaKhurd Email ID-dineshkumarsahu971@gmail.com
Dist. – Shahdol (M.P.)–484001
Mobile: +917049745038

Objective
To obtain an entry level position as an Electrical Engineer, & be a confident and Successful
Professional to hope up my technical and Management skills through Continuous learning.
Abilities
Focused, Motivated, Decision Making, Goal oriented ,Smart working .Energizing people to work in
harmony & a spirit of team work ,Ability to open new ideas and view point of others ,Deterministic
nature.
Qualifications
University Year CGPA/
Degree/Certificate Institute/School
/Board ofPassi Percentage
ng
Graduation RGPV Bhopal Shri Govindram Seksaria Institute 2018 7.84
(BE In Electrical of Technology &
Egg.) Science ,Indore(M.P.)
Diploma In RGPV Bhopal GOVT .Polytechnic 2015 7.97
ElectricalEngi college ,Shahdol(M.P.)
neering
HSC(PCM) BSEMP GOVT .Raghuraj H .S .School 2012 86.80%
Bhopal No. 2 Shahdol(M.P.)
SSC BSEMP GOVT.RaghurajH.S.School,N 2010 86.83%
Bhopal o2Shahdol(M.P.)

 Current Status: Working in STELMEC LIMITED ODISHA as an


Electrical Engineer, Since March2023to till date.

Project name:-Electrical Distribution System 220/33 KV GIS Substation.


Client Name: - Talcher Fertilizer Limited.

 Experiences
 Before installations work Transportation coordination and site location inspection for GIS work.
 Checking of GIS unit visuals inspection at site as per documentation.
 Checking of module and installed as per drawing, check torque tightness of joint and bolt and
mechanical structure work.
 EOT crane installation & commissioning work.
 Studying contract document, technical Drawing, specification of electrical system.
 Successful installation, testing& commissioning of 50MVA transformer.
 Alignment work of different GIS part like circuit breaker, disconnect or-switch,
earthswitch,fastearthswitch.Gearmechanismbox.
 Electrical wiring checks as per drawing and tightness check.
 Preparation of execution schedule for electrical works.
 Preparation of JMC and certification from client.
 Co-ordination with HO for expediting supplies.
 Site management and supervision of teams involve in electrical works.

Project name:-180MW Devikote Solar Project (33/220Kv Substation)


Client Name:-Adani Solar Energy RJ Two Private Limited.

 Experiences

 Testing of Substation equipment’s i.e.,SF6CB,Isolators,LA,CT and CVT of up to 220kV


 Knowledge of installation and erection work of substation equipment’s LA, CVT, CT, ISOLATOR BPI,
CB up to 220Kv substation.
 Panel installation work like HT, LT, Distribution panel.
 Lighting & illumination work.
 Stringing & installation work up to 220 kv substation as per drawing.
 Ensuring compliance with Electrical Standards and Regulations during works.
 Promoting a safe working culture among contract agencies and ensuring compliance of safety
protocols and practices at workplace.
 Short-term & long-term planning; preparation & execution of monthly work plan sand
DPR .Maintaining quality of executed work.
 Planning of high voltage testing at site up to 220kv substation as per site test report.
 Preparation of billing with client.
 Studying contract document, technical Drawing, specification of electrical system.
 Successful installation, testing & commissioning of 100MVA transformer.
 Successful commissioning of 33/220kv substation.

 Work at HARTEK POWER PRIVATE LIMITED RAJASTHAN as an Electrical Engineer, Since Jan
2022 to March 2023.

 Project name:- 400/220KV GIS Substation Extension Bay-Project in PGCIL Chamera


Himachal Pradesh
 Client Name:- Power Grid Corporation of India Limited

 Installation, testing and commissioning job at site responsibility:


 Before installations work Transportation coordination and site location in section for GIS work.
 Checking of GIS unit visuals inspection at site as per documentation.
 Checking of module and installed as per drawing, check torque tightness of joint and bolt and
mechanical structure work.
 EOT crane installation & commissioning work.
 Alignment work of different GIS part like circuit breaker, disconnect or-switch, earth
switch, fast earth switch .Gear mechanism box.
 Electrical wiringchecksasper drawingandtightnesscheck.
 Arrangements of testing toolbox and co-ordination hi port test kit at site.
 Planning of high voltage testing at site up to 220kv substation as per site test report.
 Charge each modules as per given client schedules and run it.
 As per work order works completion certificate and mom preparation. If any necessary
Modification and rectification work at site after discussion with client and over
Organization.
 Electrical Engineer (250/375MWpCSP (Jodhpur) Solar Power Plant
 Project Name:-250/375MWp CSP JODHPUR POWER PLANT RAJASTHAN
 Client Name:-HERO FUTURE ENERGIES

 Studying technical drawings, specifications ofelectricalsystem.
 Short-term & long- term planning; preparation & execution of monthly work plans.
 Preparation of DPR for Planning work execution & coordinate with customer
 Testing and commissioning of Inverters & LT panel.
 Maintaining quality of executed work and timely completion of project to ensure customer satisfaction
 Preparation of execution schedule for electrical works.
 Preparation of JMC and certification from client.
 Co-ordination with HO for expediting supplies.
 Site management and supervision of teams involve in electrical works.

 Worked at VIKRAN ENGINEERING AND EXIM PVT LIMITED, REWA M.P since May 2019
to Jan 2022
 Project name:- 400/220KV Extension Bay-Project in PGCIL- Rewa M.P.
 Client Name:- Power Grid Corporation of India Limited

 Knowledge of installation & Erection of electrical equipment’s, LT switchgear, Circuit Breaker (SF6)
Cable laying (HT/LT)
 Testing of Substation equipments i.e., SF6CB, Isolators, LA, CTandCVTofupto220kV.
 Erection & Stringing of 400/220kv substation equipment as per drawing.
 Electrical layout drawing knowledge
 Earthing of 220kv substation & HT and LT panel installation knowledge
 Promotingasafeworkingcultureamongcontractagenciesandensuringcomplianceofsafe
 protocols and practices at work place
 Short-term & long-term planning; preparation & execution of monthly work plans and DPR.
 Maintaining quality of executed work and timely completion of project to ensure customer
satisfaction
 Preparation of billing with client.
 Successful testing & commissioning of 220kv substation feeder bay PGCIL.

 Key skills
 Good listening abilities.
 Good communication
 Good leadership abilities
 Good knowledge of M.S.office.
 Good problem solving abilities
 Personal Details
Name: Dinesh Kumar Sahu
DateofBirth 01/05/1995
Gender Male
Nationality Indian
Address V+P- Padmaniya Khurd,Sohagpur,ShahdolMPPIN-484001
LanguagesKnown Hindi,English
Hobbies Cricket

 Declaration

I hereby declare that the above Mentioned information is true and correct to the best of my knowledge.If
we give me Opportunity to serve under your best guidance that will be my pleasure. I assure you my job
sincerely. I will try my level best.

Date:

Sign.