Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

GEMIII XX AR ID KU DWG XX 211759 Layout1

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

The Grand Egyptian Museum

GRAND The Ministry of state for Antiquities /


EGYPTIAN
MUSEUM Supreme Council of Antiquities /
Engineering Committee

EHAF
Hill International CONSULTING ENGINEERS

heneghan.peng.architects RAAFAT MILLER CONSULTING DAVIS LANGDON SCHUMANN SMITH SITES INTERNATIONAL
OVE ARUP & PARTNERS ARAB CONSULTING ENGINEERS DAVIS LANGDON BARTENBACH LICHT'LABOR
BURO HAPPOLD SHAKER CONSULTANCY WEST 8 BRUCE MAU DESIGN

GENERAL NOTES:
1. Measurements are based on the metric system and are shown
in millimeters unless noted otherwise ( UNO ).
2. All levels are in meter unless noted otherwise.
3. Do not scale this drawing.
DROP BOLT 4. Figured dimensions to be followed.
BULLNOSE STILE 5. Do not use for construction unless expressly permitted.
DROP BOLT BULLNOSE STILE 6. GI Steel Sheet = Galvanized Steel Sheet.
B B 7. Doors as per MAR no. (184053-2060).
8. Doors Location as per DWG no.(from 211752 to 211757).
MATCH LINE
1.5mm THK GI METAL COVER

5 25

5 25
30

30
FIXED TO THE BRACKET BY

3
RIVETS

A A

30
A A STAINLESS
STEEL HINGE

ROW= 1000 mm

ROW= 1000 mm
150 mm 150 mm

NDW= 983 mm

NDW= 983 mm
FW= 1050 mm

FW= 1050 mm
DW= 990 mm

DW= 990 mm
ROW= 930 mm

ROW= 500 mm
REINFORCEMENT DROP BOLT
30x30x3mm Thk. (w/

150 mm
BEARING)

4
MATCH LINE

30 5

25 5
30
25
5mm THK GI
MATCH LINE

B B
MATCH LINE

BRACKET / SPACER

MATCH LINE
1.5mm THK GI METAL 1.5mm THK GI 1.5mm THK

MATCH LINE
COVER FIXED TO THE HORIZONTAL TOP VIEW FRAME GI FRAME HORIZONTAL TOP VIEW
BRACKET BY RIVETS HORIZONTAL SECTION B-B
100 mm 900 mm 710 mm 290 mm
REVITED 1.5mm THK GI 1.5mm THK GI
@ SITE 5 METAL COVER 5 5 5
METAL COVER

5mm THK GI
BRACKET / SPACER

5mm THK GI
4 NDH= 857 mm 4 4 NDH= 667 mm 4
HORIZONTAL SECTION A-A BRACKET / SPACER
95 30 DH= 865 mm 5 25 25 5 DH= 675 mm 30 285 1.5mm THK GI METAL
ROH= 1000 mm ROH= 1000 mm COVER FIXED TO THE
BRACKET BY RIVETS
FH= 925 mm FH= 735 mm

SEALANT ON
1.5mm THK GI METAL COVER BACKING ROD
FIXED TO THE BRACKET BY RIVETS
EXPANSION ANCHOR
46 5mm THK GI 1.5mm. GI THK. 16 5
BRACKET / SPACER FRAME DATE KEY PLAN

DROP BOLT

15
REVITED STAINLESS 1.2mm. GI THK. SINGLE REINFORCEMENT
STEEL HINGE SKIN ACCESS PANEL
@ SITE 30x30x3mm Thk. (w/
16 BULLNOSE STILE BEARING) 16

100
5

75
CONTRACTOR:
45

SUB-CONTRACTOR:
P.O. Box 545, Dammam (31421)
Kingdom of Saudi Arabia
Since 1975
Tel: (03) 847-2777
Fax: (03) 847-2591
Al uhaimi Metal Industries Ltd. email: info@alkuhaimi.com

25 Drawing Title:-
MAIN BUILDING
EXPANSION ANCHOR GUARD BOX ACCESS DOORS - GENERAL DETAILS
30 4 DETAIL C 4 30 FOR IRREGULAR OPENINGS
5mm THK GI
BRACKET / SPACER SCALE SIZE CONTRACT DWG NO. REV.
ABA
1.5mm THK GI METAL 1.5mm. GI THK.
1:12 A1 PMC DWG NO. REV.
COVER FRAME ABA

You might also like