54699 SCR-PCOM0RULE (MNLS)/2/2020-RULES SECTION Date:30.08.2024

DRMs/SC, BZA, GTL, HYB, GNT & NED.

ववषय/Sub: Amendment Slip no. 17 to SCR G&SR - 2020.

***

The following amended SR 9.12.1 to 9.12.5 are given for implementation.

S.R. 9.12.1:- In case of failure of signal or signals between two block stations in
Automatic block system, the train working should normally be done in
accordance with the provisions of Rule 9.02 or 9.07, 9.14, 9.15 as the case
may be.

S.R. 9.12.2:-

S.R. 9.12.2 (A) Failure of signal/s between two block stations in Automatic
block system likely to last for some time or cause serious delay when means
of communications are available:-

In event of all signals between two block stations in Automatic block system
fails, it shall be considered as a prolonged failure.

In the event of conditions mentioned in sub-para (i) or (ii) below, the decision
whether to consider a failure of signal/s as a prolonged failure should be taken
by Sr. Divisional Operations Manager / Divisional Operations Manager (in-
charge).

(i) Failure of signal/s occurring in an area consisting of two or more block


stations worked under Automatic Block system which is likely to last for
some time as advised in writing by the officials of S&T department, with
the approval of Sr. DSTE/ DSTE concerned, to the section controller of
the division; or

1
(ii) In case of the failure of signal/s causing or expected to cause serious
delay in train operations on account of working during such failure in
accordance with rule 9.12.1.

The following procedure shall be adopted for train working in case of


prolonged failure of signal/s.

1.
(a) The intimation of prolonged failure shall be given to concerned duty
station master by Section Controller under exchange of private number
Before any train is allowed to enter the affected section, it shall be
brought to a stand and the Loco Pilot/Motorman and Train Manager of
the train shall be advised of the circumstances by the Station Master.
Section Controller and Station Master concerned ahead of the affected
section shall also be informed.
(b) The section between the two block stations will be treated as a Single
Block Section &train movement in Block Section shall be controlled by
the Station Master of either side.
(c) Before introduction of such working, it shall be ensured that all the
trains dispatched in the affected section have completely arrived at the
station in advance. Additionally, it shall be ensured that, the Semi-
Automatic/Manual Despatch Stop Signal of all stations dispatching
trains in the affected section and the Semi-Automatic/Manual Reception
Stop Signals of all stations receiving trains in the affected section, shall
be put in manual mode and in ON position initially.
(d) The Station Master shall advise the Station Master at the other end
regarding suspension of Automatic Working in the following Format.

From To
Station Master/X Station Master/Y

No.

Automatic Block working suspended between and stations at Hours


minutes due to (Reasons).Train signaling shall be done through
Station-to-Station fixed telephone /Railway Auto Phone/ BSNL phone/Fixed
Telephone with CUG sim or Control Telephone/Very High Frequency set.

Private Number (In figures) __( In words)

2
From To
Station Master/Y Station Master/X
No.

Your No. __Understood that Automatic Block working suspended between


____and ____stations at __Hours______minutes due to____
(Reasons). Train signaling shall be done through Station-to- Station
fixed telephone /Railway Auto Phone/ BSNL phone/Fixed Telephone with
CUG sim or Control Telephone/Very High Frequency set.
Private Number (In figures) _____( In words)_____

2. The Station Master on duty at the Station in rear of the affected section
shall obtain „Line Clear‟ using the forms T/A 1425 and T/B 1425 for the train
by one of the following means of communications viz.

(a) Station to Station fixed telephones wherever available.


(b) Fixed telephone such as Railway auto phone & BSNL/MTNL
phone with caller ID.
(c) Control Telephone.
(d) VHF set under special instructions, but not as the sole means of
communication on sections where passenger trains run.
(e) Fixed Telephone with CUG sim which have been provided to the
station only for official use by the on- duty Station Master.
NOTE:- In all cases where line clear is obtained/granted by a means of
communication other than Track circuit/Axle counter, the system of calling
station name, followed by establishing identity of the Station Master on duty
by cross checking Private numbers given for the last Preceding train shall
be adopted.

3. The Station Master on duty at the station in advance shall not give such
“Line Clear” unless:-
(i) The whole of the last preceding train has arrived complete.
(ii) The Semi-Automatic/Manual Reception Stop Signal has been put
back to „ON‟ behind the last preceding train.
(iii) The line is clear not only up to the Semi-Automatic/Manual
Reception Stop Signal but also for the adequate distance beyond
the Semi-Automatic/Manual Reception Stop signal.
(iv) The private number/s shall be exchanged with on duty gatemen, for
closure of the level crossing gate/s under his control.
(v) The points of outlying sidings/ turnouts under his control are correctly
set and locked.

3
4. (a) The Loco Pilot/Motorman of the first train entering the affected
section on authority form T/D 912 as prescribed in SR 9.12.2 (A) (5)
below shall proceed with utmost caution and must not run at a speed
exceeding 25 KMPH under any circumstances, subject to other speed
restrictions in force. If the view is restricted due to fog, curve or any other
reason, speed shall not exceed 10 KMPH. The speed over facing points,
if any, being restricted to 15 KMPH. The Loco Pilot/Motorman shall
continue to look out for any obstruction until he reaches the station
ahead.

(b) Before any train is allowed to enter the block section by handing over
the authority T/D 912, the station master shall ensure that private
number/s has been received from the gatemen for closure of the gate/s
under his control. It shall also be ensured that all points under control of
train dispatching station over which the train will pass are correctly set,
Clamped and padlocked.

5. The Station Master shall give the Loco Pilot/Motorman and Train
Manager of each train entering the affected section on Automatic block
system, an Authority in form T/D 912, during prolonged failure of signals.
Distinguishing numbers of departure, Automatic, Semi-Automatic/ Manual
and Gate signal/signals required to be passed, shall also be indicated on the
Authority authorising the Loco Pilot/Motorman to pass them at „ON‟ position.
For a Starter / Manual/ Midsection Gate signal, the Loco Pilot/Motorman
shall pass the signal only when he receives a proceed hand signal from a
railway servant in uniform. In the case of midsection gate signals the Loco
Pilot/Motorman shall cautiously pass the level crossing only after ensuring
that the gates are closed and locked for road traffic.

6. When approaching the train receiving Station, the Loco Pilot/Motorman


of the train shall act upon the aspect of the Semi-Automatic/Manual
Reception Stop Signal/Calling-on signal of the receiving station. In case the
Semi-Automatic/Manual Reception Stop Signal/Calling-on signal is not in
working condition then the Station Master shall depute a railway servant in
proper uniform and issue authority on Form No. T/369(3b) for receiving the
train, after ensuring that conditions to take OFF Semi-Automatic/Manual
Reception Stop Signal have been fulfilled.

7. After ensuring that the first train has arrived safely at the station ahead
of the affected section, the Loco Pilots/Motorman of all subsequent trains
may be permitted to run at their sectional speed subject to other speed
restrictions in force. The speed over facing points, if any, being restricted to
15 KMPH.

8. Clearance of the section by each train shall be intimated to the station in


rear under exchange of Private Number. Train Signal Register shall be
4
brought into use and all entries regarding train working recorded there- in.
Section Controller shall be kept advised of all train movements taking place
in the affected section.

9. As soon as the signals are put right by the S&T officials in writing,
section controller‟s permission should be obtained for resuming normal
working of trains on Automatic Block System. A message shall be
exchanged with Private Numbers by the Station Master on duty concerned
in Train Signal Register, assuring that the last train dispatched during the
failure has arrived completely at the station in advance and the section is
clear. Intimation of restoration shall be given to section controller under
exchange of private number.

From To

Station Master/X Station Master/Y

No. Last Train (Number and description) despatched during failure from
your station at _____hours _____mins has arrived completely at my station at hours
mins. Cancel the present method of working of trains.

Private Number (In figures) ( In words)

From To
Station Master/Y Station
Master/X

No. Your No. understood Last Train (Number and description)


despatched during failure from my station at hours mins has arrived
completely at your station at hours mins. Cancel the present method of working of
trains.

Private Number (In figures) ( In words)

10. All the records in connection with train working on this system shall be
retained at the station and the Transportation Inspector of the section must
scrutinize them and submit his report to the Sr. Divisional Operations Manager /
Divisional Operations Manager (in-charge) within 7 days of the resumption of
normal working.
5
S.R. 9.12.2 (B): Failure of all signals likely to last for some time and cause
serious delay when no means of communications are available in Double line:-

In the event of failure of automatic signalling occurring in an area consisting of two


or more stations in Automatic Block System and when line clear cannot be taken
by any of the following means, viz.

a. Track circuit and Axle counter where indication of the section between
two stations is available on VDU panel.
b. Station to Station fixed telephone wherever available.
c. Fixed telephone such as Railway auto phone & BSNL/MTNL phone.
d. Control Telephone.
e. VHF sets under special instructions, but not as the sole means of
communication on sections where passenger trains run.
f. Fixed Telephone with CUG sim which have been provided to the station
only for official use to the on-duty Station Master.

The following procedure shall be adopted for train working:-

(i) The movement between the two block stations shall be controlled by the
Station Master of either side. It shall be ensured that, the Semi-
Automatic/Manual Despatch Stop Signal of all stations dispatching trains in
the affected section and the Semi-Automatic/Manual Reception Stop Signals
of all stations receiving trains in the affected section, shall be put in manual
mode through-out the failure and in ON position initially.

(ii) All the points over which the trains will run within the affected area shall be
correctly set and locked before the movement of any train is authorized over
them.

(iii) Before any train is allowed to leave the station as prescribed in S.R. 9.12.2
(B), it shall be brought to a stand and the Loco Pilot/Motorman and the Train
Manager of the train shall be advised of the circumstances by the Station
Master.

(iv) The Station Master shall give the Loco Pilot/Motorman and Train Manager of
each train an Authority on form T/B 912 (and shall retain the record copy)
which shall consist of-
(a) An authority to proceed without line clear.
(b) Instruction to the Loco Pilot/Motorman to follow rule 9.02 to pass fully
automatic signal when at ON and rule 9.15 to pass automatic signal
interlocked to LC gates in midsection when at ON. For a Starter signal
/ Manual/ Midsection Gate signal, the Loco Pilot/Motorman shall pass
the signal only when he receives a proceed hand signal from a railway

6
servant in uniform. In the case of midsection gate signals the Loco
Pilot/Motorman shall cautiously pass the level crossing only after
ensuring that the gates are closed and locked for road traffic.
(c) A Caution Order restricting the speed to 15 Kmph over the straight line
when view is clear and 10 kmph when approaching or passing any
portion of the line where the view ahead is not clear due to curve,
obstruction, rain, fog or any other cause subject to the observance of
other speed restrictions imposed. Loco Pilot/Motorman must also
ascertain that the points of the outlying siding/ turnouts, if any, are
correctly set and locked before passing over them. Speed over facing
points being restricted to 15 KMPH.

(v) No train shall be allowed to enter an affected section unless there is a clear
interval of 25 minutes between the train about to leave and the preceding
train.

(vi) (a) In the event of a Loco Pilot/Motorman approaching or passing any


portion of a line where view ahead is not clear, the Assistant Loco Pilot or
the Train Manager with hand signals must be sent in advance to guide the
further movement of the train. A sharp look out ahead should be kept and
the engine whistle freely used.

(b) A tunnel shall be entered only after it has been ascertained that it is
clear. If there is any doubt on this point, the train shall be piloted by a
railway employee equipped with hand signals and detonators.

(vii) The Train Manager shall keep a sharp look out in the rear and be prepared
to exhibit a danger signal to prevent the approach of a train from rear side
and to protect it, if necessary, as per extant rules. Before entering a section
where there are tunnels, he shall also switch on the side and tail
lights/lamps on EMUs etc.

(viii) If the train is unable to move further due to any reason, then the train
manager should protect the train in rear by placing one detonator at 250
meters from the train on the way out and 2 detonators, 10 meters apart, at
500 meters from the train.

(ix) When approaching the next station the Loco Pilot/Motorman shall bring his
train to a stand outside the Semi-Automatic/Manual Reception Stop Signal
and sound one long whistle. The Station Master will arrange to depute a
railway servant in proper uniform and issue authority on form no. T/369 (3b)
for receiving the train, after ensuring that conditions to take OFF Semi-
Automatic/Manual Reception Stop Signal have been fulfilled. On arrival, the
Motorman/Loco Pilot of all trains shall make over the form T/B 912 to the
Station Master of the receiving station.
7
(x) Trains must continue to work on this system until either the signals are put
right or any one of the means of communications is restored by the S&T
officials in writing.

(xi) As soon as the signals and communication are put right, normal working of
trains shall be resumed.

(xii) However, where signals continue to remain in-operative but any of the
means of communication is restored, the Station Masters at both end shall
immediately exchange a message in the following format-

From To

Station Master/X Station Master/Y

No. Train (Number and description) arrived complete at


hours. Last Train (Number and description) despatched to your
station at _ _ _ _ hours. Cancel the present system of working of trains. Line Clear shall
be obtained by means of Acknowledge

Private Number (In figures) ( In words)

From To

Station Master/Y Station Master/X

No.. Your No. Understood that Train (Number and understand


description) which was the last train to leave my station has arrived complete at
your station. Train No.

which left your station has arrived complete at my station at


Hours/not arrived. Present system of train working is being/ shall be
cancelled immediately after the complete arrival of train No Line Clear for the next
train shall be obtained by means of

Private Number (In figures) ( In words)

(xiii) In case of any of the means of communication is restored as per condition in


Para (xii) above, working shall be done in accordance with S.R. 9.12.2 (A).
Line Clear shall not be obtained or given by any means of communications

8
which has been restored until both the Station Masters are satisfied that all
trains despatched from their stations have arrived complete at the other
station. When the trains referred above arrived complete at the stations,
their numbers and arrival time will be communicated to the other Station
Master concerned under exchange of Private Numbers. There after
intimation to this effect shall be given to the Section Controller.

(xiv) All the records in connection with train working on this system shall be
retained at the station and the Transportation Inspector of the section must
scrutinize them and submit his report to the Sr. Divisional Operations
Manager / Divisional Operations Manager (in-charge) within 7 days of the
resumption of normal working.

S.R. 9.12.2 (C): Rules and Regulations for Single line sections in Automatic Block
System when means of communications are available but direction of traffic
cannot be established.

In such cases the procedure laid down under SR 9.12.2 (A) shall be followed.

S.R. 9.12.3: Rules and Regulations for working of trains under the Automatic
Block System during obstruction of one line when signals are operative and
communication are available (on Double Line Sections):

1. When it is desired to introduce temporary single line working on double line


on electric communication instruments, the Station Master at one end of the
affected section shall on receipt of reliable information in writing that one line is
clear, take steps to introduce temporary single line working on that line in
consultation with the Section Controller and the Station Master of the station at
the other end of the section. The decision to introduce temporary single line
working should be taken by Sr. Divisional Operations Manager / Divisional
Operations Manager (in-charge). Temporary Single Line Working shall be
introduced between the nearest stations provided with cross-over between Up
and Down lines on either side of obstructions. Nomination of stations at both the
ends of such stations shall be done by Sr. Divisional Operations Manager /
Divisional Operations Manager (in-charge) of the division as mentioned in above.

2. If there is reason to suspect that the line over which temporary single line
working is to be introduced is also fouled or damaged, temporary single line
working shall not be introduced until a responsible engineering official not below
the rank of a SSE/JE (P.Way) has inspected that section and certified that the
track is safe for the passage of trains.

9
3. The movement of trains on the affected section shall be controlled by such
stations and on such lines as are nominated.

4. The Semi-Automatic/Manual Despatch Stop Signal of the Stations at both


the ends of the section where temporary single line working is being introduced,
shall be put in manual mode for the entire duration of temporary single line
working and shall be ensured to be in ON condition during wrong line operations.
The concerned Semi-Automatic/Manual Reception Stop Signals of the stations at
both the ends shall also be put in manual mode for the entire duration of
temporary single line working and in ON position initially, before introduction of
temporary single line working.

5. All trains running in the wrong line shall be worked in accordance with the
rules for the use of electric communication instruments on single line. Line clear
shall be obtained using the forms T/A 1425 and T/B 1425 on the following:
(a) Station to Station fixed telephones wherever available.
(b) Fixed telephone such as Railway auto phone & BSNL/MTNL phone with
caller ID.
(c) Control Telephone.
(d) VHF set under special instructions, but not as the sole means of
communication on sections where passenger trains run.
(e) Fixed Telephone with CUG sim which have been provided to the station
only for official use to the on- duty Station Master.
NOTE:- In all cases where line clear is obtained/granted by a means of
communication other than Track circuit/Axle counter, the system of calling station
name, followed by establishing identity of the Station Master on duty by cross
checking Private numbers given for the last Preceding train shall be adopted.

6. All entries shall be made in RED ink in the Train Signal Register, at stations
on affected section.

7. After ascertaining that one of the lines is clear for the passage of traffic, the
Station Master proposing single line working shall issue a message under
exchange of private Number, containing the following information, to the Station
Master at the other end of the affected section :-
(a) Cause of introduction of single line working;
(b) Place of obstruction;
(c) The line by which single line working is proposed;
(d) The source of information that the said line is clear;
(e) Restriction of speed, if any, on the line;
(f) The number and timings of the last train which arrived/left the station
nominated.

10
8. On receipt of acknowledgement from the Station Master at the other end and
confirmed by a private number single line working may be introduced. Line clear
shall be obtained on available means of communications as mentioned at para -
5 above.

9. The Station Master on duty at the station in advance shall not give such “Line
Clear” unless:-
(a) The line is clear not only up to the Semi-Automatic/Manual Reception
Stop Signal but also for the adequate distance beyond the Semi-
Automatic/Manual Reception Stop signal.
(b) The private number/s has been exchanged with on duty gatemen, for
closure of the level crossing gate/s under his control.
(c) The points of outlying sidings/ turnouts under his control are correctly set
and locked.
(d) For each first train running in the wrong line, line clear shall neither be
asked nor given unless the two Station Masters have assured under
exchange of private numbers that all the trains running in the right line
have already arrived completely at the Station in advance.

10. A written authority (form T/E 912) shall be given to Loco Pilot/Motorman and
Train Manager of all trains in right and wrong line which includes.

a) A „line clear ticket‟ on Automatic block system during temporary single line
working on double line for all wrong line trains and every first right line
train.

b) Instruction to the Loco Pilot/Motorman of right line trains to follow rule


9.02 to pass fully automatic signal when at ON and rule 9.15 to pass
automatic signal interlocked to LC gates in midsection when at ON.
Instruction to the Loco Pilot/Motorman of wrong line trains to pass gates
only when he receives proceed hand signal from a railway servant in
uniform. Authority to pass Semiautomatic / Manual Departure Stop
signals at ON for wrong line trains.

(c) A caution order which shall clearly state:-


(i) The line on which the train or light engine is to run
(ii) The kilometers between which the obstruction exists.
(iii) Any restriction of speed which may have been imposed; and
(iv) The instruction that Automatic signals in the wrong line should be
considered as out of use even though they may be showing
„Proceed‟ or „Caution‟ aspect
(v) The train started on the wrong line shall be piloted out of the station
after all the concerning points have been correctly set and locked.
(vi) Location of the Neutral section if any.

11
11. Before any train in the wrong line is allowed to enter the block section by
handing over the authority T/E 912, the station master shall ensure that private
number/s has been received from the gatemen for closure of the gate/s under his
control. It shall also be ensured that all points under control of train dispatching
station over which the train will pass are correctly set and locked.

12. For every first train in the right line the procedure laid down for the trains
running in the wrong line shall be followed and the authority T/E 912 shall be
issued.

13. The subsequent trains running in the right line may be allowed to follow
each other as per the signal aspect in Automatic Block System, provided that the
station in rear has intimated the station in advance about the fact that he is
permitting particular train/trains to follow and has ascertained the readiness of
station in advance to receive, if following them. Private numbers shall be
exchanged for every such movement.

The written authority (T/E 912) shall also be given to the subsequent trains
following the first train running in the right line, on signals. The station master
shall however strike out the line clear ticket portion in the authority T/E 912.

14. An endorsement shall also be made on the form T/E 912 given to the Loco
Pilot/Motorman of the first train introducing temporary single line working in the
wrong line to stop and inform all Gatemen and Gangmen on the way about the
introduction of temporary single line working. The line, on which the trains shall
run, also be specified. The Loco Pilot should switch “ON” the flasher light of the
train engine while running on the wrong line on proper authority to proceed. In
case, the train engine running on the wrong line without switching on the flasher
light is noticed by the station staff, Gatemen and Gangmen they shall stop the
train immediately.

15. (a) The speed of every first train running in the wrong line shall not exceed 25
kmph subject to other speed restrictions. The subsequent trains in the wrong
line, which would be dispatched on line clear, may be permitted to run on
sectional speed subject to other speed restrictions.

(b) The speed of every first train running in the right line shall not exceed 25
kmph subject to other speed restrictions. The trains which are following the
first train in the right line on the aspects of the signals may be permitted to run
at sectional speed, subject to other speed restrictions in force. However, the
speed over facing points, if any, being restricted to 15 KMPH.

16. (a) When approaching the next station nominated under S.R. 9.12.3, the Loco
Pilot/Motorman of the train running in the wrong line shall bring his train to a
stand before the Semi-Automatic/Manual Despatch Stop Signal pertaining to
the wrong line on which he is running or any Shunt signal protecting the

12
outermost Cross-over, whichever he comes across first, and sound one long
whistle. The Station Master after satisfying himself that all points have been
correctly set and locked, shall arrange for a man in uniform, to pilot the train
from this signal, who shall obey hand signals, if any, relayed from the station
platform. Manual/Semi-Automatic signals, if any, shall, however, be passed
on a written authority on the prescribed form T/510 to be issued by the Station
Master.

(b) When approaching the next station nominated under S.R. 9.12.3, the Loco
Pilot/Motorman of all the trains running in the right line shall be guided by the
aspect of the Semi-Automatic/Manual Reception Stop Signal of the receiving
station. In case the Semi-Automatic/Manual Reception Stop Signal/Calling-On
is not in working condition then the Station Master will arrange to depute a
railway servant in proper uniform and issue authority on Form No. T/369 (3b)
for receiving the train, after ensuring that conditions for taking OFF Semi-
Automatic/Manual Reception Stop Signal have been fulfilled.

17. Resumption of normal working.

(a) On receipt of written certificate from a responsible engineering official that


the obstruction on affected line is removed and obstructed line is free for
passage of trains, the Station Master will issue a message to the other
station/s, as the case may be under exchange of private numbers and
decide, in consultation with Section Controller the train after the passage of
which the normal working has to be introduced.

From To

Station Master/X Station Master/Y

No. Last Train (Number and description) which left from your station at ho

Private Number (In figures) (In words)

From To

Station Master/Y Station Master/X

No. Your No. Understood, that Train No. which left my


station has arrived complete at your station at Hours. Present
system of train working is cancelled

Private Number (In figures) (In words)

13
(b) An entry shall also be made in the Train Signal Register of all stations
concerned showing the time at which double line working was suspended,
single line working was introduced and the time at which normal working
was resumed.

(c) The Loco Pilot of the first train entering the section where obstruction was
removed and normal working is resumed shall not exceed 25 kmph subject
to other speed restrictions and inform all Gatemen and Gangmen on the
way about resumption of normal working. A caution order shall be issued by
the Station master for the same.

18. All the records in connection with the temporary single line working shall be
retained at the station and the Transportation Inspector of the section must
scrutinize them and submit his report to the Sr. Divisional Operations Manager /
Divisional Operations Manager (in-charge) within seven days of the resumption
of normal working.

S.R. 9.12.4 Rules and Regulations for Single line sections in Automatic Block
System when no means of communications are available in case of failure of
Automatic signalling.

(A) In the event of failure of all automatic signals occurring in an area consisting
of two of more stations worked under Automatic Block System in single line and
when line clear cannot be taken by any of the following means, viz.

(i) Track circuiting or Axle Counters;


(ii) Station to station fixed telephones wherever available;
(iii)Fixed telephone such as Railway Auto-phones & BSNL phones.
(iv) Control Telephone;
(v) VHF sets; (under special instructions, but not as the sole means of
communication on section where passenger trains run).
(vi) Fixed Telephone with CUG sim which have been provided to the station
only for official use to the on-duty Station Master.

(B) The Station Master who has a train to despatch through the affected section
shall open communications by establishing contact with the Station Master of the
block station at the other end of the affected section by sending an engine or self-
propelled vehicle or any other vehicle, enumerated below, in the order of
preference laid down: -

(a) Light engine;


(b) Train engine, after it is detached from the train by the Loco Pilot on
instructions from the Station Master on duty;

14
(c) Motor Trolley/Tower Wagon/Trolley/Cycle Trolley/Moped Trolley duly
accompanied by a Train Manager or by a Station Master other than the
Station Master on duty;
(d) Diesel car/Rail Motor Car/EMU Rake after ensuring that all passengers
have detrained.

(C) Before the Light Engine/Train Engine/Motor Trolley/Tower Wagon/ Trolley/


Cycle Trolley/Moped Trolley/Diesel Car/Rail Motor Car/EMU Rake is sent into the
affected section to open communications, the Loco Pilot/Motorman/Train
Manager/Station Master being sent to do so shall be advised by the Station
Master on duty of the circumstances in which and the purpose for which he is
being sent. The Station Master on duty shall also satisfy himself that the Loco
Pilot/Motorman/Train Manager/Station Master being sent to open
communications thoroughly understands the rules for working of trains during
total failure of communications on the single line. If the Loco Pilot/Motorman/
Train Manager/ Station Master who is being sent to open communications, is not
conversant with the Rules for working of trains during total failure of
communications on single line, the Station Master on duty shall explain these
rules to such staff. The Station Master on duty shall also obtain the signature of
the Loco Pilot/Motorman/ Train Manager/Station Master on Form No. T/B 602
„Authority for opening communication during total interruption of communication
on single line section‟, in token of such staff having fully understood the
circumstances in which and the purposes for which he is being sent and the
Rules for Working of Trains during total failure of communications on single line.
The Loco Pilot/Motorman shall follow rule 9.07 to pass fully automatic signal
when at ON and rule 9.15 to pass automatic signal interlocked to LC gates in
midsection when at ON.

(D) (i) Before despatching the Light Engine / Train Engine / Motor Trolley /
Tower Wagon / Trolley / Cycle Trolley / Moped Trolley / Diesel Car / Rail
Motor Car / EMU Rake, the Station Master on duty shall hand over form no.
T/B 602 an „Authority for opening of communication during total interruption
of communication on single line section‟ to the Loco Pilot / Motorman / Train
Manager / Station Master who is being sent to open communications, which
includes:
(a) An „Authority to Proceed Without Line Clear‟,
(b) A Caution Order, specifying the speed up to which the engine or self-
propelled vehicle or other vehicle referred to in para (B) above may run
through the affected section
(c) A Line Clear Enquiry Message addressed to the Station Master of the
block station at the other end of the affected section asking for Line
Clear for the train waiting to be despatched to his station,

15
(d) A conditional Line Clear Message to Station Master of the block station
at the other end of the affected section permitting him-
(1) To return the Light Engine / Train Engine, either light or attached to
a train waiting to be despatched from his station, or attached with
another engine; or
(2) To return Tower Wagon/Diesel Car/Rail Motor Car/EMU Rake
running by itself; or
(3) To return Motor Trolley/ Trolley/ Cycle Trolley/ Moped Trolley
either running by itself or loaded in a train waiting to be
despatched from his station.

(ii) The Loco Pilot/ Motorman/ Train Manager/ Station Master going to open
communications shall, on receipt of form no. T/B 602 „Authority for opening
communication during total interruption of communication on single line
section‟ shall sign on its original and carbon copy in token of his having
understood its contents.

(iii) In case a light engine or an engine and brake van is to be despatched to


proceed to the next block station and then continue its journey onward after
arrival at the next block station and is not meant for opening
communications, the Loco Pilot/ Motorman of engine or the engine and
brake van, shall be given the „Authority for opening communication during
total interruption of communication on single line section‟ and the items „Line
Clear Enquiry Message and Conditional Line Clear Message‟ for its return
journey mentioned in para (i) (c) & (d) above, shall be struck out in form.
Such engines or engine and brake van shall be issued only the „Authority to
Proceed Without Line Clear‟ and Caution Order referred to in para (i)(a) &
(b) above where necessary. When it is necessary to despatch another light
engine or another engine and brake van in the same direction, an interval of
at least 30 minutes shall be allowed to elapse before it is despatched.

(iv) The Semi-Automatic/Manual Despatch Stop Signal shall not be taken „OFF‟,
while permitting an engine or self-propelled vehicle or other vehicle to
proceed to the next station on „Authority for opening communication during
total interruption of communication on single line section‟.

(E) After an engine or self-propelled vehicle or other vehicle is despatched to


the next station to open communications with Line Clear Enquiry Message and a
Conditional Line Clear Message to the next station for the return journey of the
engine or self-propelled vehicle or other vehicle, no other train or engine or self-
propelled vehicle or other vehicle shall be allowed to leave the station and
proceed in the same direction until the engine or self-propelled vehicle or other
vehicle sent to open communications returns.

16
(F) (i) The engine or self-propelled vehicle or other vehicle proceeding on
„Authority for opening communication during total interruption of
communication on single line section‟ shall switch on the Flasher light,
wherever provided and shall proceed at a speed not exceeding 15
kilometers per hour by day when the view is clear and 10 kilometers per
hour during night or when the view is obstructed, making free use of engine
whistle or horn of the self-propelled vehicle, where provided.

In thick, foggy or tempestuous weather or in dust storm etc., when visibility


is impaired, the engine or self propelled vehicle, or other vehicle proceeding
on „Authority for opening communication during total interruption of
communication on single line section‟ shall proceed at walking pace only
making repeated use of the engine whistle or horn of self propelled vehicle,
where provided, preceded at an adequate distance by two men on foot, one
displaying a red light and the other carrying fog signals ready for immediate
use. Normally one of these men will be provided by the Station Master from
pointsman/ gateman and the other from the crew of the engine or the person
whose Motor Trolley/Trolley/Cycle Trolley/Moped Trolley is being used. In
case of single manned self-propelled vehicle, both these men shall be
provided by the Station Master. The Station Master on Duty shall explain to
both of them their duties, in the presence of the Loco Pilot/ Motorman/ Train
Manager/ Station Master in charge of the self-propelled vehicle or other
vehicle being sent to the next station and satisfy himself that they
understand the same.

(ii) Both by day and night, a tunnel must not be entered until the Loco
Pilot/Motorman/Train Manager/ Station Master has ascertained that it is
clear. Should there be any doubt on this point, the engine or other vehicle
etc. should be piloted by a railway servant equipped with hand signal and
detonators. Before entering the tunnel the headlights, side and tail lights and
other lights (where provided) shall also be lit.

(iii) No obstruction of the line beyond the outermost facing points shall be
allowed until the return of the Engine/ Tower Wagon/ Diesel Car/Rail Motor
Car/ EMU Rake/ Motor Trolley/ Trolley/ Cycle Trolley/Moped Trolley.

(G) In the event of an engine/self-propelled vehicle/other vehicle, proceeding on


„Authority for opening communication during total interruption of communication
on single line section‟ meeting in the midsection, an engine/self-propelled
vehicle/other vehicle sent from the other end, the Loco Pilots/Motormen/Train
Managers/Station Masters, as the case may be, shall, taking into consideration
the importance of the train for which they are proceeding to get Line Clear, the
distance from the nearest station, gradients to be encountered, the presence of
catch sidings etc., decide to which of the two stations, the engines/self-propelled
vehicle/vehicles should proceed. Before proceeding, the engines or self-propelled
17
vehicles shall, if possible, be coupled up. If the engines/self-propelled vehicles
cannot be coupled up they should run at a safe speed and adequate distance
apart. In the case of Motor Trolley/Push Trolley/Cycle Trolley/Moped Trolley,
meeting an Engine and brake van/Diesel Car/Rail Motor Car/EMU Rake, the
Motor Trolley/Push Trolley/Cycle Trolley/Moped Trolley shall, if possible, be
loaded in the Brake Van/Diesel Car/ Rail Motor Car/EMU Rake.

(H) On sighting the station to which the engine/self-propelled vehicle/ other


vehicle running by itself or with another similar unit coupled together or
separately, to which it is/they are proceeding, the leading engine/self-propelled
vehicle/other vehicle shall stop outside (i.e. In rear of) the Semi-
Automatic/Manual Reception Stop Signal of the station. The engine or self-
propelled vehicle or other vehicle following the leading engine/self-propelled
vehicle/other vehicle, shall stop at a safe distance behind the leading engine/self-
propelled vehicle/other vehicle. The Station Master shall be advised of the
stoppage outside the Semi-Automatic/Manual Reception Stop Signal either by
using the engine whistle/horn of the self-propelled vehicle, if provided, or by
sending a man if necessary. They shall not enter the station till permitted by the
Station Master to do so either by taking „OFF‟ the relevant signals or otherwise.

(I) When the engine or engines/self-propelled vehicle or self-propelled


vehicles/other vehicle or vehicles have been admitted into the Station, the
„Authority for opening communication during total interruption of communication
on single line section‟ shall be delivered to the Station Master on duty, who shall
keep this document in his safe custody and also post the Line Clear Enquiry
Message and the Conditional Line Clear Message in his Line Clear Books. On
the authority of the Conditional Line Clear Message for the return journey, the
Station Master on duty shall make out a Conditional Line Clear Ticket on Form
T/G 602(UP) or T/H 602(DOWN) as the case may be and hand over it to the
Loco Pilot/Motorman/Train Manager/ Station Master to return to the block station
from where he came with his engine either light or attached to a train or another
engine or a self-propelled vehicle if one is waiting to proceed in that direction.

(J) In case of the engine or self-propelled vehicle or other vehicle returning to


the station from which he was sent without reaching the next station, the
„Authority for opening communication during total interruption of communication
on single line section‟ shall be taken back by the Station Master on duty of the
station from which this was issued and cancelled. The original entries shall also
be cancelled.

(K) Station Master on duty before despatching the engine either light or
attached to a train/self-propelled vehicle/other vehicle, on the return journey shall
hand over to the Loco Pilot/Motorman/ Train Manager/ Station Master,
„Conditional Line Clear Reply Message‟ on Form No. T/F 602 for the „Line Clear
Enquiry Message‟, giving Line Clear for the train waiting at the other station,
18
thereby authorising the Station Master at that station to start the train waiting
there on complete arrival of the engine, either light or attached to a train/self-
propelled vehicle/other vehicle at his end. The Loco Pilot/Motorman shall follow
rule 9.07 to pass fully automatic signal when at ON and rule 9.15 to pass
automatic signal interlocked to LC gates in midsection when at ON.

(L) The particulars of the engine either returning light or attached to a train or
attached to another Engine/ Tower Wagon/Diesel Car/Rail Motor Car/EMU
Rake/Motor Trolley or Trolley/ Cycle Trolley or Moped Trolley running by itself or
loaded in a train as may be applicable shall be correctly filled in on Form No. T/F
602 „Conditional Line Clear Reply Message‟.

(M) On the return journey, the engine either light or attached to a Train/ Diesel
Car/Rail Motor Car/EMU Rake/Train loaded with Motor Trolley/Push
Trolley/Cycle Trolley/Moped Trolley may run at sectional speed observing speed
limits in the Working Time Table and other relevant rules. The Motor Trolley
/Push Trolley/Cycle Trolley/Moped Trolley returning by itself may run at their
normal speed observing the rules governing their running on Line Clear.

(N) On reaching the station, the engine either light or attached to a train/self-
propelled vehicle/other vehicle shall again stop outside (i.e. in rear of) the Semi-
Automatic/Manual Reception Stop Signal of the station and thereafter be guided
by the instructions from the Station Master, who may arrange to receive it by
taking „OFF‟ the relevant signals or otherwise.

(O) On arrival at the station the „Conditional Line Clear Reply Message‟ shall be
handed over to the Station Master who shall record it in the Line Clear Message
Book and on its authority issue a Conditional Line Clear Ticket on Form No. T/G
602 or T/H 602 (as the case may be) for the waiting train.

(P) If there be an even flow of trains in both directions, Line Clear Enquiry
Message on Form No. T/E 602 and Conditional Line Clear Messages for each
succeeding train may be sent through the Train Manager of the preceding train.

(Q) The arrival and departure time of all trains, engines, Trolleys etc. which are
passed under the above rules must be carefully recorded in the Line Clear
Enquiry and Reply Books and also in the record copy of the „Authority for opening
communication during total interruption of communication on single line section‟
and in the Train Signal Register.

(R) If the Station Master at one end of the interrupted section has more than
one train to despatch in the same direction before another train is normally
expected from the opposite direction, he shall, in such cases, send the first
available engine of a train to obtain „Line Clear‟ not only for that train but also for
the following trains which may be waiting or expected at his station. In the Line
Clear Enquiry Message, it shall be stated that these latter trains will be

19
despatched after the first train at intervals of 30 minutes. After the Loco Pilot
returns with the Line Clear for the required number of trains to the station at
which he had left the train, the Station Master shall despatch the first train on the
authority of the Line Clear for the trains and shall also endorse on that Line Clear
that a particular train (giving its number and description in full) shall follow at a
specified interval. The Station Master shall give similar information to the Train
Manager also in writing. The Loco Pilots of the second and subsequent following
trains shall be given a caution order restricting the speed to 25 kilometers per
hour over the straight when the view ahead is clear and to 10 kilometers per hour
when approaching or passing any portion of the line where the view ahead is not
clear due to curve, obstruction, rain, fog, or any other cause. When despatching
a second and subsequent trains, the particulars of the last preceding train along
with its time of departure will be endorsed on the Line Clear as also the
particulars of the train that would follow. The Line Clear for the last train of the
series should be endorsed with the particulars of the proceeding train together
with its time of departure. While adopting this procedure, the Train Manager and
the Loco Pilot should be instructed to keep a sharp look out and be prepared to
stop short of any obstruction.

(S) When a train is stopped in the affected section the Train Manager shall
immediately exhibit a hand danger signal towards the rear and checkup that the
tailboard or the taillight is correctly exhibited. If the stoppage is on account of
accident, failure, obstructions or other exceptional cause and the train cannot
proceed, the Loco Pilot shall sound the prescribed code of whistle to apprise the
Train Manager of the fact, where upon the Train Manager shall protect the train
by placing one detonator at 250 meters from the train on the way out and 2
detonators, 10 meters apart, at 500 meters from the train, irrespective of the
gauge. When a train is detained outside signals and if the detention exceeds or is
likely to exceed 10 minutes it shall also be protected accordingly. In the absence
of the Train Manager, the duty of protecting the train shall devolve on the Loco
Pilot.

(T) When trains follow one another, no train shall be backed. In exceptional
circumstances when it may be unavoidable to back a train, the train shall be
backed only after providing protection by placing one detonator at 250 meters
and 2 detonators, 10 meters apart, at 500 meters from the point up to which the
train is to be backed.

(U) Trains must continue to work on this system until anyone of the means of
communications, mentioned in rule (4) (A) of SR 9.12 is restored by the S&T
officials.

(V) As soon as anyone of the means of communications has been restored, the
Station Master must exchange a message with the Station Master at the other
end of the section, on the Form No. T/I 602. On receipt of the above message,
20
the Station Master at the other end of the section must acknowledge in the Form
No. T/I 602.

(W) Normal working shall not be restored, until both the Station Masters are
satisfied that all trains and engines, etc. despatched from their stations have
arrived complete at the other station. Even if the communication is restored
immediately after the departure of the light engine/self-propelled vehicle/any
other vehicle referred to in Rule (A) above, sent under „Authority for opening
communication during total interruption of communication on single line section‟,
normal working should not be resumed until the light engine/self-propelled
vehicle/any other vehicle reaches the next station and both the Station Masters
are satisfied under exchange of Private Numbers that no light engine/self-
propelled vehicle/any other vehicle is on the section. Thereafter intimation about
this shall be given to Section Controller also, on controlled sections, if
communication with Section Controller has also got restored and normal working
resumed. If, however, communication with Section Controller has not got
restored along with restoration of communication between two stations, the
Section Controller shall be advised of the position immediately on restoration of
communication with him.

(X) On the section where total interruption of communications occurs, the


Transportation Inspector of the section, must scrutinize the train passing records
of the station and submit his report to the Senior Divisional Operations
Manager/Divisional Operations Manager (in-charge) within seven days of the
resumption of communication.

S.R. 9.12.5 Rules and Regulations for single line working on double line sections
in Automatic Block System due to obstruction of one line when no means of
communications are available in case of failure of automatic signalling.

The following rules must, in addition to the rules prescribed in SR 9.12 (4), be
observed by the staff.

(A) Whenever an accident to a train or track or other obstruction, precludes the


use of one line on a double line section during total interruption of
communications, single line working shall be introduced only after a responsible
official of the Engineering Department, not less than SSE/JE(P.Way) in rank, has
certified that the other line on which single line working is to be introduced is free
and safe for passage of trains. Such engineering official shall give the certificate
only to the Station Master of the station at that end of the affected section for
which the unobstructed line shall be the right line for despatching trains. On
receipt of this certificate only the Station Master at the end of the affected station
for which the unobstructed line shall be the right line for dispatching trains will
follow the rules prescribed in SR 9.12(4) for opening of communications.
21
(B) Loco Pilots of trains, including light engines, shall be given a Caution Order
on which, and shall be stated clearly-
(i) The line on which the train is to run;
(ii) Location where the obstruction exists;
(iii) Any restriction of speed, which may be imposed by Way & Works Staff;
(iv) An assurance to the effect that any trap points on the line in question
have been spiked and clamped.

(C) All the cross over points, over which the train shall proceed, while temporary
single line working is in force, shall be clamped and padlocked.

(D) In the case of a train proceeding on the right line:

(i) The Semi-Automatic/Manual Despatch Stop Signal of the station in rear


of the affected section may be passed in the „ON‟ position in the
prescribed form T/369(3b) and hand signals shall also be shown at the
foot of this signal.
(ii) The approach Stop signals, if any, of the station in advance of the
affected section, may be taken „OFF‟.

(E) In the case of a train proceeding on the wrong line:

(i) The train shall be piloted out of the station on a written authority T/511 in
addition to T/G 602 or T/H 602 as the case may be, issued by the
Station Master after all the facing points have been correctly set,
clamped and pad locked and trailing points correctly set over which the
train will pass.
(ii) Loco Pilot/Motorman of wrong line trains shall pass gates only when he
receives proceed hand signal from a railway servant in uniform.
(iii) On reaching the next station, the Loco Pilot shall bring his train to a stop
opposite the first Stop signal pertaining to the right line or at the last Stop
signal pertaining to the wrong line (on which his train is running),
whichever he comes across first.
(iv) The Station Master of the station in advance shall depute a railway
servant in uniform at the foot of the signal (whichever the train would
encounter first) who shall stop the train on hand danger signal and
thereafter pilot it into the station on a written authority T/ 510 issued by
the Station Master.

(F) It will be the responsibility of the person in charge of the first engine or self-
propelled vehicle or other vehicle, sent under „Authority for Opening
Communication during total interruption of communication on single line section‟
to inform all the Gatemen and Gangmen en-route about the introduction of
temporary single line working as also the line on which it is proposed to run the
train. This information shall be conveyed through the Loco Pilot of a subsequent
train also, if necessary.
22
(G) Resumption of normal working: —

(i) If after the introduction of single line working, communications are restored
between two affected stations, the trains will continue to run under special rules
until action is taken in accordance with the instructions contained in these rules
for the cancellation of the procedure. Thereafter, trains will be run in accordance
with the instructions for the movement of traffic during temporary introduction of
single line working on double line.

(ii) If, however, before communications are restored, the other line is released
for the passage of traffic, trains shall be worked, in accordance with the
instructions for running of trains on double line section during total interruption of
communications.

BARMAVATHU Digitally signed by


BARMAVATHU NAGYA
NAGYA Date: 2024.08.30 15:07:14 +05'30'
Principal Chief Operations Manager

Copy to: General Managers, PCOMs & PCSOs/CR, ECR, ECoR, ER, NCR, NER,
NWR, NFR, NR, SECR, SER, SWR, SR, WCR, WR, SCoR& Metro Rly/Kolkatta;
Secretary to GM for kind information to GM;
AGM, SDGM, DGM/G, CPRO;
PED/Safety (A&R); CRS/SCC/SC;
PCCM, CCO, CCM/PS, CCM/FM, CFTM, CPTM, CTPM,
PCE, CTE, CTE/TP, CBE, CGE,
CAO/C, CE/C-I, CE/C-II, CE/C-III, CE/C-IV & CE/C/V,
PCME, CWE, CMPE/Dsl, CRSE, CWM/WS,
PCEE, CEDE, CPM/RE, CEGE, CELE, CESE, CEE/RS, CEE/O & Plng;
PCSTE, CSE, CCE, CSTE/P, CSTE/C, Director, IRISET/LGD;
PCSO, PCSC, PCPO, PFA, Principal Director/Audit, MRA;
Sr.DOMs & DOMs/ SC, BZA, GTL, GNT, HYB & NED;
Sr.DSOs/DSOs/SC, BZA, GTL, GNT, HYB & NED;
Sr.DEN (Co-ord)s/Sr.DENs/DENs/SC, BZA, GTL, GNT, HYB & NED;
Sr.DME/DMEs/DMEs (P)/ SC, BZA, GTL, GNT, HYB & NED;
Sr. DSTE/DSTEs/ SC, BZA, GTL, GNT, HYB & NED;
Sr.DEE/Tr.D/ SC, BZA, GTL & GNT;
Sr.DEE/TRSO/ SC, BZA, GTL & GNT;
Principals/ZRTI/MLY, STTC/MLY, ETTC/BZA, STC/LGD & ZCETC/KCG;
Rajbhasha Adhikari for translation into Hindi.
***

23

You might also like