Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Irshad CV. 03. 06. 2024 AQME

Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

CURRICULUM VITAE

IRSHAD ANSARI
Village/Post: Sauri
Tehsil: Saidpur
Disst : Ghazipur, (U.P) Email: Irshadansari.ia723@gmail.com
Pin: 275205 Phone: 9682004546

OBJECTIVE:

Intend to build a career with leading corporate of hi-tech environment with committed&
dedicated people which will help me to explore myself fully and realize my potential willing
to work as a key player in challenging & creative environment.

EDUCATIONAL QUALIFICATION:

➢ SSC from UP, Board in 2013


➢ Diploma in Civil Engineering from NIRMT in 2016

EXPERIENCE RECORD:

Having 8.0 Experiences on Project for Road/Bridge Construction. I am working in M/S


MSV International Inc. In association with M/S Vaishnavi Infratech Services Pvt.
Ltd. AQME. I am fully involved in Quality Control Work during Construction of Road
and Structure starting from Borrow area sampling to Testing of Earthwork, GSB, DLC,
PQC, WMM, DBM, BC etc.
Experience:
Company M/s. MSV International Inc. In association with M/s. Vaishnavi Infratech Services Pvt. Ltd.

Position Assitant cum Quality Meaterial Engineer.

Duration Jan.-2024 to till date.

Projects 01 Four laning of Jorhat to Jhanji Section of NH-37 from km 453.000 to km 491.050 (Design
Chainage from Ch. 453.000 to Ch.490.800) in the state of Assam under SARDP-NE on EPC
mode. 220.4

Rehabilitation and Up-gradation of Dergaon Town to 4 Laning from km. 426.800 to km. 437.400
02 on NH-37 in the State of Assam 122.4

Construction of Four laning of Numaligarh to Jorhat section of NH-37 from km 402.500 to km


03 453.00 (Design Chainage from Ch. 403.200 to Ch. 454.240) Excluding Dergaon Bypass from Km
426.800 to Km 437.420 (Design Chainage from Ch. 427.400 to Ch. 438.720) 454.89

Client : NHIDCL (National Highway Infrastructure Development Corporation)

Cost : 797.89 (220.4, 122.6, 454.89)

Designation : Sr.Lab Technician.


EPC Contractor : M/S JKM Keticon (JV)
Client : NHIDCL

Authority Engineer : M/s Sterling Indo (P) LTD.

Name of Project : Rehabilitaion and up-gradation of road from Km. 16+077 to Km.
43+935 of Lalchara Kanchanpur via Shivbari section of Manu-Simlung
road on NH-44A to two lane with paved shoulder in State of Tripura
on EPC basis (Package-II)

Working Period : 26 Aug. 2023 to 30 DEC 2023.

Designation : Lab Technician

EPC Contractor : M/s Sweety Infrastructure Pvt. Ltd.


Client : NHIDCL
Authority Engineer : M/S FP India Project Management Consultancy Service Pvt. Ltd.

Name of Project : Four Laning of Jorhat – Jhanji Section of NH-37 From Km


453.000 to 491.050 (Design Km 453.000 to Km 490.800) in the
State of Assam under SARDP-NE on EPC Basis
Working Period : 13 Jun 2022 to 06 Aug. 2023
Designation : Lab Technician

EPC Contractor : Skylark Infra Engineering Pvt.Ltd.


Client : NHIDCL
Authority Engineer : K&J Project Pvt Ltd.

Name of Project : Widening/Improvement to 4 (Four) Lane with Paved


Shoulder from Km 66+000 to Km 81+000 (design Ch-65+923to 80+930)
of Dokmoka-Bharatmala Pariyojana on EPC modeWorking

Period : 16 Feb 2020 to 29 May 2022.

Designation : ASST. Lab Technician

Name of Project : Construction of Six Laning from existing Km 494.410 (Design Chainage
540.595) to existing Km 509.550 (Design Chainage 555.905) of NH-8 in
the State of Gujarat (Length 15.310 Km) onEPC Mode under NHDP Phase-
V (Package –VII).

EPC Contractor : M/S KCC Buildcon Pvt. Ltd.

Client : NHAI

Working Period : 23 Nov 2016 to 30 Jan 2020

Responsibility:

➢ Conducting laboratory testing for soil, Aggregate, Cement, Concrete and Asphalt work as per
MoRT&H Specification relevant bureau of Indian standard or IRC specification and MS-2
➢ Controlling the quality of concrete at batching plant
➢ Sampling and testing of concrete at site
➢ preparation of monthly progress report
Maintaining quality of borrow area used in the construction of Embankment & Sub-grade

Testing of soil:-

Grain Size Analysis, Atterberg Limit, Modified, Proctor Compaction, Free soil Index, CBR, Moisture
Content Determination, K-value of Soil, Compaction checking at site by Sand Replacement Method as
required and also by nuclear density gauge.
Testing of GSB and WMM Material:-

Gradation, Plasticity Index, Properties, Modified Procter test, Ten percent fine value test
for GSB, Water absorption, CBR for GSB, Field density test by sand Replacement Method or
by Nuclear density gauge.

Testing of Aggregate:-

Aggregate Impact Value, Water Absorption, Flakiness & Elongation index for WMM and
concrete works, Soundness test (if required),Specific Gravity, Deleterious Contents (Clay,
Lumps and soft particles), as per Bureau of Indian Standard, MORTH specification and
Technical specification of the Concrete.

Testing of Cement, Concrete DLC and PQC:-

Fineness, Consistency, Setting Time, Soundness, Workability in terms of slump and


Compressive strength at 3 days and 28 days by Rebound test Hammer, Preparation of mix
design of various grades of concrete and preparation of mix design of DLC, &PQC

Testing of Bituminous & DBM,BC:-

Checking the grade of bitumen by Penetration Test, Softening point, Marshall Stability and
flow value, Specific Gravity, Bituminous extractor, Asphalt content, Viscosity, Elastic
recovery test, Asphalt mix design as per condition of contract and checking of density by
taking core site.

Language Known : English, Hindi

Personal Profile:

Name : IRSHAD ANSARI


Date of Birth : 11/07/1998
Fathers name : Akbal Ansari
Sex : Male
Marital Status : married
Nationality : Indian
Personal Interest : Playing Cricket
Declaration:

I hereby declare that the above information is given by me is correct and complete to the
best of my knowledge and belief and if given an opportunity to serve, I assure that my
performance would be whole hearted dedicated and always to best of my capacity & in the
prestige of the Company.

Place:Jorhat. (Irshad Ansari)

You might also like