Project EHS Plan
Project EHS Plan
Project EHS Plan
CONDITIONS
This document is the property of Sumadhura Infracon Pvt Ltd. and may not be reproduced, by any
means, in whole or in part, without prior written permission of Sumadhura Infracon Pvt Ltd.
This document is provided with the understanding that it contains proprietary information of
Sumadhura Infracon Pvt Ltd. and will be confined to its employees and clients, and that no part of its
contents will be disclosed to third parties.
Sumadhura Infracon Pvt Ltd. recognizes copyright, trademarks, registrations and intellectual
property rights of certain third parties whose work is included or may be referred to in this document.
The rights of those parties to express ownership are accepted.
The content of this document does not constitute a contractual agreement and Sumadhura Infracon
Pvt Ltd. accepts no obligations associated with this document except as expressly agreed in writing.
The information contained in this document is subject to change. All rights reserved.
INDEX
[A] Revision History ............................................................................................................................... 5
1. INTRODUCTION ...................................................................................................................................... 6
1.1 Purpose ................................................................................................................................................. 6
1.2 Scope .................................................................................................................................................... 6
1.3 Abbreviations........................................................................................................................................ 6
1.4 Terms & Definitions ............................................................................................................................. 7
1.5 Our purpose, Vision & Mission ............................................................................................................. 8
1.5.1 Our purpose ....................................................................................................................................... 8
1.5.2 Vision ................................................................................................................................................ 8
1.5.3 Mission .............................................................................................................................................. 8
1.5.4 EHS Policy ........................................................................................................................................ 9
1.5.5 Project Detail ..................................................................................................................................... 9
2. PROJECT ORGANIZATION ..................................................................................................................... 9
2.1 Project EHS organization chart.............................................................................................................. 9
2.2 Roles and Responsibility ..................................................................................................................... 10
2.2.1 Roles And Responsibility Of Chairman & Managing Director And Vice Chairman: ......................... 10
2.2.2 Responsibility Of IMS Management Representative: ........................................................................ 10
2.2.3 Responsibility Of EHS Core Committee ........................................................................................... 10
2.2.4 Responsibility Of Director Operations: ............................................................................................. 11
2.2.5 Responsibility Of Management Representative Functions: ................................................................ 11
2.2.6 Responsibility Of President - Technical ............................................................................................ 12
2.2.7 Responsibility Of Head EHS ............................................................................................................ 12
2.2.8 Responsibility Of Cross-Functional Team At Corporate Level: ......................................................... 13
2.2.9 Responsibility Of Audit Team .......................................................................................................... 14
2.2.10 Responsibility Of Project In-Charge .................................................... Error! Bookmark not defined.
2.2.11 Responsibility Of Project EHS Committee: .................................................................................... 14
2.2.12 Responsibility Of EHS Officer’s..................................................................................................... 14
2.2.13 Responsibility Of Construction Work In-Charge............................................................................. 15
2.2.14 Responsibility Of HR & Admin ...................................................................................................... 15
2.2.15 Responsibility Of Store In-Charge .................................................................................................. 16
2.2.16 Responsibility Of Plant & Machinery In-Charge ............................................................................. 16
2.2.17 Responsibility Of Emergency Response Team ................................................................................ 16
2.2.18 Responsibility Of First Aid Team (Nurse) ...................................................................................... 17
1. INTRODUCTION
Sumadhura Infracon Pvt. Ltd. is one of the prominent residential and commercial real
estate developers in Bangalore & Hyderabad. One of the most admired and trusted brands,
Sumadhura has been growing from strength to strength over the past three decades marking its
presence over the skylines of Bengaluru and Hyderabad. Sumadhura so far has delivered over 8
million sft of projects while approximately 20 million sft of projects are under construction and
planning stages. From being prominently a residential developer, Sumadhura has expanded its
horizons into Commercial, Coliving, Plotted Development and other real estate verticals.
We operate with a belief that everyone deserves a better life. Over the past three decades
Sumadhura has delivered more than 45 projects where thousands of happy customers reside.
Our projects are built to provide exceptional life experiences, security and value. Sumadhura
properties have seen the highest rate of capital appreciation and have given our customers an asset
to own for life.
With innovation, quality, and sustainability at the core of our work and a unique customer
centric approach has put us on the league of the best and most trusted developers in the business.
Our expertise in land acquisition, understanding the customer needs, execution capabilities
including the appointment of architects, designers, project managers along with exceptional sales
and after sales service has helped us to be counted among the forerunners in real estate
development.
1.1 Purpose
The project EHS Plan has been prepared and formulated as a summary of the EHS related
activities required, This plan spells out the management practices and describes the EHS
management for this project and This plan acts as a guideline to educate people involved in the
project about the EHS requirements, in devising engineering and administrative controls and to
enforce the same.
1.2 Scope
The contents of this document are applicable to procurement, construction, inspection,
commissioning and testing of this project in a safe manner, which are being carried out and the
finished works that are in conformance with project technical specifications and other relevant
code specification requirements of the project.
1.3 Abbreviations
S.No. Abbreviation Expansion
1 AIA Aspect Impact Assessment
8 Incident Occurrences arising out of, or in the course of, work that
could or does result in injury and ill health
1.5.2 Vision
To be a trusted global real estate brand creating a melodic harmony of customer’s
happiness, environmental preservation, and society’s progress.
1.5.3 Mission
We are on a mission to serve families by enhancing their quality of life through our core
principle of Q.U.E.S.T which is to constantly be in the pursuit of excellence and maximizing
customer happiness. While doing this, we provide a rewarding and challenging environment to
our employees and value to our stakeholders.
Q – Quality – Be the brand that raises the benchmark of the Quality of Life for our customers
U – Unify – Create life spaces that unify the melody between our customer’s life and our nature’s
needs.
E – Engage – Be the extended family of our customers by always being there, hearing them out
fully and serving them with a smile.
S – Sustainability – Build Spaces that makes Mother Earth Smile.
T – Technology – Optimize Quality of Construction and Experience of Customers with use of
cutting -edge technologies.
2. PROJECT ORGANIZATION
To guide, advise and lead the management team in the right direction for growth and
profitability of the Company under the policies implemented
Accountable for defining EHSMS, EHS policy and EHS Objectives
Appoint ISO Management Representative
Approve the EHS System manual and its amendments
Provide necessary resources for promotion and implementation of good EHS practices
across the organization.
Chair the EHS Core committee meetings
Overall, accountable for continual improvement of the EHS Management system
Responsible for ensuring that the EHS management system is established, implemented
and maintained in accordance with the ISO 45001 and ISO 14001 Standards
To report on the performance of the EHS Management System and the need for
improvement of the top management
Responsible for organizing the internal audits and compliance audits
Accountable for liaison with external parties (ex., consultancy organization,
certification bodies, factories inspector, etc) on matters relating to the EHS management
system
Responsible for demonstrating that the organization and its staff are committed to the
continual improvement of EHS performance
Responsible to ensure the compliance of legal and other requirements
Review EHS performance of the organization and establish / update the objectives and
targets on a regular basis
Communicate changes in the EHS Management system to all concerned departments
proactively
The EHS Committee shall meet as often as necessary but at least quarterly.
To assist the Chairman & Managing director and vice Chairman in taking important
decisions pertaining to EHS related matters
Ensure decisions and policies are getting implemented in true spirit to achieve
sustenance in EHS performance of organization
Allocate resources towards EHS management (Budget, Manpower)
Approve EHS SOP OCP as part
Review EHS performance of projects with the management representative, project in-
charge, EHS management representative and head of EHS
Direct/Advice action to management representative, project in-charge on EHS Review
presented /reported
Approve identified training needs of line management and project team in the EHS
domain
Initiate action against non-performing employees & labour contractors
Ensure EHS execution on site is being carried out as per the requirements and standards
are established
Plan & allocate resources towards EHS management (Budget, Manpower etc.,)
Review and approve EHS plan
Review EHS performance of projects with PH and EHS team
Ensure all operational controls pertaining to EHS activities are established and are
being followed to avoid any EHS non-conformance
Ensure all monitoring and measurements (calibration, compliance, EHS performance
etc.) are being carried out as per the EHS plan and periodic reports are generated by all
concerned departments
Direct/ Advice action to PH on EHS Review presented/reported by Head EHS, external
agency or MR- EHS
Resolve conflicts/issues escalated to his level
Initiate/Recommend action against non-performing employees & labour contractors
Reward & Recognize individuals/ team for good EHS performance
Ensure all EHS performance targets are met
Responsible for preparation of management program to comply with the objective and
target of their department
Communicating EHS policy to all staff and ensure that the policy requirements are
adhered
Responsible for conducting departmental reviews in EHS matters
Responsible to coordinating in providing resources for their departmental EHS elements
Accountable for providing direction to their department on the design, implementation
and maintenance of the EHS Management System
Responsible for conducting internal audits for EHS MS as per the audit schedule
Generate audit reports
Verify the closure of audit findings
Responsible to ensure project in-charge closes all NC
Act as internal expert & guide to project head and project team
Responsible to verifying all applicable legal compliance at project
Accountable for conducting induction formalities to all staff and workmen
Responsible for implementing company EHS policy and procedures at project site
Responsible for preparation and implementation of project safety plan, emergency
evacuation plan, monsoon plan and reviewing project logistics plan.
Responsible for developing safety culture at project site through training to project team
and toolbox talks to workmen
Responsible for 100% implementation of PPEs at site
Responsible for verifying that all machinery, equipment, lifting ropes and shackles and
vehicles etc. inspected by a competent person licensed by Dept. of Industries of local
government.
Responsible for ensuring safe working conditions with the help of construction
engineers and supervisors
Accountable to report project EHS performance on a monthly and weekly basis to
project in-charge and corporate head - EHS
Responsible for all EHS documentation
Responsible for preparation of incident reports in coordination with the project manager
and reporting to top management
Responsible to conduct site walk through along with project head - record observations,
recommend action & follow up for closure.
Responsible for providing visual awareness posters on site
Visit worker camp frequently along with nurse and admin - record observations,
recommend action & follow up for closure
Accountable for the implementation of the organization’s EHSMS in his work area
Accountable to ensure his / her working area is safe for workers.
Accountable to ensure all workers working in his command area are EHSMS inducted.
Accountable for providing job specific PPEs to workers as per Operational Control
Procedure .
Responsible for checking whether safety instructions have been prepared and displayed
at relevant places through operation control instruction for use of personal protective
equipment.
Authorized to take disciplinary action on EHSMS violations
Accountable for issuing work permits in his work area
Accountable for preparing EHSMS activity checklists
Accountable for conducting TBT before the start of activity
Responsible to identify and fulfil the applicable legal and other requirements.
Accountable for evaluating all legal compliance once a month
Accountable to communicate the legal non-compliance's to the top management
Responsible to conduct review meetings on legal requirements.
Responsible for updating & communicating in the organization, with the latest
legislation / amendments.
Head-HR &Adm.is accountable for compliance with EHS legal & other requirements.
Accountable to visiting worker camp frequently along with EHS officer and nurse -
taking action against observations and recommendations
Accountable for maintaining legal compliance for all plant & machinery, equipment,
lifting tools and tackles
Accountable for doing the TPI for all the lifting machines, tools and tackles as per the
legal requirements
Accountable for preventive maintenance of plants, machinery & equipment
Accountable for stack monitoring of DG set if deployed
Authorized to raise indent for required maintenance
Accountable for providing qualified operators for the machines used
Accountable for preparing and maintaining preventive maintenance record and
inspection checklist
Accountable for preparing and maintaining all documents related to plant & machinery
The team should regularly monitor medicine availability in the First aid box.
First aid personnel shall take care of the injured people
The first aid persons should take care that the injured persons are shifted to the hospital
in time as decided by the project manager.
Responsible for follow up and updating the project in-charge and EHS officer about the
condition of people admitted to the hospital
The first aid persons should prepare the ambulance checklist, record the first aid
Responsible to visiting the worker camp and site to identify the worker's health and
hygienic condition and report to the EHS officer
Responsible for conducting regular medical camp at site and worker camp
Responsible for conducting pre-employment medical check formalities to all staff and
workmen
3.1 General
This EHS plan is organized into the following sub sections:
The Head EHS will review and approve all the necessary project based on standardized
documentation as prepared by the respective project EHS in-charge and released to the
project sites as necessary.
This standardized project documentation includes but is not limited to:
List of activities to be covered for EHS monitoring in the project
The Project EHS plan includes Hazard Identification & Risk Analysis (HIRA)
Aspect and impact Analysis (AIA)
Required Operation Control Procedures (OCP)
Required project wise emergency preparedness and response plan (EPRP)
Relevant checklists & formats
The documents mentioned above are named as per the document nomenclature system
adopted by the organization
A master list of project EHS records, (Annexure-3) approved by the project manager, is
maintained by the project EHS in-charge.
The EHS Head will train the project EHS team on the project documented information and
it has to be maintained in respective projects
Visitors will be provided visitor identity cards with traceability entered into the visitor’s
register.
An emergency assembly area sufficient for peak labour strength will be earmarked and
clearly identified with signage.
A logistic plan (annexure) will be developed by project EHS in-charge and site planning
from time to time, indicating the salient locations of the project like offices, stores, first
aid room, emergency assembly points and allowing routes for man and material
movements segregated clearly.
Entry and exit of man and material will be monitored using bio-metrics / identity cards /
security registers / gate pass, as the case may be.
Signage boards of information, of caution and of prohibition will be displayed at
appropriate locations of the project
Smoking and use of any intoxicates are strictly prohibited at project site. Any violation
will invite disciplinary action as per the policy of the organization.
Mandatory legal approval and BOCW requirements notice board display have to be
displayed on site entrance
6. ENVIRONMENTAL MANAGEMENT
As part of preventive measures, to minimize the impact of construction activities on the
environment, the following measures will be adopted.
All the construction roads in the project will be sprinkled with water to suppress dust
Fuel filters and exhaust pipes of energy generators will be checked on a periodical basis
All the vehicles plying in the project will be verified for acceptable emissions limits
(checking of pollution under control certificates)
The Diesel generators will be installed in enclosed spaces to reduce noise levels
All the construction chemicals and fuels will be stored on a concreted bed and a tray
will be used to avoid inadvertent spillage directly on to the ground
As a monitoring and control mechanism, noise levels and air quality will be monitored
on a monthly basis and, based on the results, corrective actions will be done (if any)
All the waste generated during project execution will be segregated and disposed of as
per the applicable norms
7. HEALTH MANAGEMENT
The worker will be screened for the pre-employment medical fitness
Periodic medical health surveillance will be conducted to ensure workers’ occupational
health and safety
The trained nurse will be deployed to monitor worker health and provide first aid
facility at the site
The workmen camp will be provided with clean drinking water and sanitation facilities
and potable water for other purposes
At the project site, drinking water tanks will be provided at different locations based on
the number of workmen at the site
The required number of toilets and urinals will be provided at the site based on the
number of workmen at the site
The toilet and urinal facilities will be kept clean and hygienic all the time.
A qualified MBBS doctor will visit the workmen camp once a month to assess the
health of workmen.
All the drinking water tanks will be cleaned once a week.
The workmen who are required to work at heights will be screened for their blood
pressure levels and any history of vertigo, diabetes before being assigned to those
activities
Fogging will be done at project offices and workmen camp at fixed intervals to curb the
mosquito menace.
8. SAFETY MANAGEMENT
If the height of storage required is more, then that should be done on rigid scaffolding
base.
No flammable material shall be stored in the main store
Activity specific HIRA will be prepared and submitted for client approval, 14 days before
the start of each activity listed above
Any unsafe acts observed will be dealt with using educational and administrative
control measures
Cautionary signage will be displayed about unavoidable unsafe conditions, like “high
voltage”, “deep excavation” etc
Signages about do’s and don’ts of safety practices will be displayed to minimize unsafe
acts by workmen
A stringent penalty system will be practiced for repeated unsafe acts by any workmen
or staff
An emergency response plan for the project will be prepared with the below objectives:
Protecting the environment and safeguarding life and property from the consequences
of the emergencies at the project site.
An emergency response team (ERT) shall be formed comprising the following key
personnel of the project:
8.11 Housekeeping
Housekeeping is considered as an integral part of EHS management as poor housekeeping
contributes to poor environmental conditions, poor health of workers and poses safety hazards.
Housekeeping is the act of keeping the working environment cleared of all unnecessary
waste, thereby providing a first line of defence against incidents and injuries.
To clean the waste generated due to their activities at the end of the day before leaving
their work area.
To keep the tools and tackles at a place assigned for that purpose after their usage
To stack all the scaffolding and shuttering material in designated places only.
To keep all the access and emergency exit paths clear of any obstructions
To deposit the garbage in the bins placed at prominent locations
Housekeeping is the responsibility of all the personnel, and line management
commitment shall be demonstrated by the continuous effort of supervising staff towards
this activity.
All stairways, passageways and gangways shall be maintained without any blockages or
obstructions
Wooden pieces with protruding nails shall be either bent or removed & properly stacked.
All surplus earth and debris are removed / disposed of from the working area to
designated dump sites. truck carrying sand, earth and any pulverized materials etc. In
order to avoid dust or odour impact, shall be covered while moving.
Proper and safe stacking of materials is of paramount importance at yards, stores and
such locations where material would be unloaded for future use. The storage area shall
be well laid out with easy access and material stored / stacked in an orderly and safe
manner.
Unused / surplus cables, steel items and steel scrap laying scattered at different places
within the working areas, shall be removed.
All wooden scrap, empty wooden cable drums and other combustible packing materials
shall be removed from the workplace to an identified location(s).
Empty cement bags and other packing materials shall be properly stacked and removed.
Adequate lighting shall be provided in and around the site
Periodical scrap removal shall be done from each section.
Proper storage of Reinforcements and shuttering shall be done.
Standard checklists will be used to cover the inspection of construction activities as well as
machinery and equipment.
Inspection of material lifting equipment, related lifting gear will be inspected by a certified
third-party competent person as per the frequencies set by statutory requirements.
As part of internal audits of the management system, EHS will be audited every 3 months
and the findings will be discussed in the management review meeting for further course of action.
12. ANNEXURE
1) Project Details
*********