Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

MOM - QA-QC Weekly Meeting 12 Sep 2018

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

PRID No.

: ALL

PROJECT NAME: ALL

Minutes of Meeting

Phase : Phase III


Doc. No. : HFY3-PCH-CONTR-GEN-M-0171 Meeting Date : 12- Sep-2018
Location : PCH Meeting Room #301 Meeting Time : 2:15 pm
Chaired by : Abdul Hannan Prepared By : Abdul Hannan
Subject : QA/QC Weekly Meeting No. 142
ATTENDEES
CONTRACTOR PMC- PETROCHINA HALFAYA
Name Position Name Position

Attached Attached
Attendance List Attendance List

AGREED BY:
CONTRACTOR: COMPANY:
Refer the attached Attendance List PETROCHINA – Halfaya

__________________________ _____________________________
Name: Name: Abdul Hannan
Designation Designation: Sr. QA/QC Engineer
Date: Date: 12- Sep-2018

PMC:
PETROFAC

____________________________
Name: Saroj Das
Designation: Lead - QA / QC
The minutes are hereby duly recorded as follows: Date : 20-June-2018
ITEM
DESCRIPTION ACTION BY DATE
NO.
PMC has raised the Quality negligence at site and inadequate quality
control personnel from Contractor side to monitor and control the
All
1 activities, as per the requirements. Info
Contractors
Contractor relevant discipline QA/QC personnel shall be available with
required Inspection tools during the Inspection (as per the RFI).
All the Contractors are advised to keep all the latest Approved All
2 Info
construction drawings and approved procedures at site. Contractors
PMT/PMC reminded Contractor to protect the project materials by
All
3 providing End covers/ Supports/ Packing etc. at site. All materials shall be Info
Contractors
stored off the ground by proper means.
New WPS & PQR - Status
1. CPECC : Total 24 WPS/PQR =Code A ( @F&C - WPS Library)
2. DPAB : 9 WPS/PQR = Code-A (@F&C - WPS Library)
4 3. HBP : 2 Piping PQR Welding Completed. All
Info
4. SERT : Piping – 2 PQRs have been completed.
Pipeline – 2 PQRs have been completed.

Signed / Closed RFIs are not being submitted by the contractors. RFIs
must be submitted to DCC right after inspection. PMC would stop All
5 Info
inspections unless all previous signed RFIs submitted to DCC. Contractor Contractors
informed sometime the attachment is too large and difficult to send it by
email.
All contractors are requested to conduct Tool Box Talk, at least one per
All
6 week for each area of operation and inform PMT/PMC in advance about Info
Contractors
the location, date & timings; to enable participation by PMT/PMC.
MOC has sent a letter to PCH to stop dealing with BV (TPI). However, PCH
All
7 has requested MOC to allow us to use BV for the ongoing projects and Info
Contractors
we will stop dealing with upcoming new projects.
PMT/PMC has conducted the site audit for PRID-3700 under TAGC. NCRs
8 TAGC Ongoing
& QSRs were raised. All closed except one NCR is still open.
PMT/PMC reminded Contractor to start preparing all related inspection
All
9 document and dossier in advance such as hydrotest, MC, PAC etc. to Info
Contractors
avoid delay incurred to the project schedule.
QUALITY CAMPAIGN:
Following 04 Quality Campaign walk-downs have been completed. 7-Sep to
10 All
07-Sep-18 FSF SERT 14-sep
08-Sep-18 FSF MSK
ITEM
DESCRIPTION ACTION BY DATE
NO.
09-Sep-18 "CPF3 (Water Treatment Area)" CPECC
10-Sep-18 "CPF3 (Oil Process Area)" CPECC

Following Site Quality Issues discussed and photographs shown.


11 03 Quality Campaign walkdown pictures / quality issues shown in the All Info
meeting.

12 Next meeting will be held on 19 Sep 2018. All Info

Attachment: Attendance Sheet

You might also like