FOUNDATION CALCULATION SHEET

One-Stop Solution for Foundation

TITLE DESCRIPTION
PROJECT/JOB NO. 023_Ba1-16
PROJECT/JOB NAME Piperack BH09-11
CLIENT NAME CMP
SITE NAME Kolaka
DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME CONVEYOR8_1
LOAD COMBINATION GROUP

REV DATE DESCRIPTION PREP'D CHK'D APPR'D APPR'D

Copyright (c) GS E&C. All Rights Reserved


09/07/2024

Project Na. : Piperack BH09-11


Calculation Sheet
of Project No. : 023_Ba1-16

Foundation Client : CMP Page 1

FOUNDATION LISTS
Group Name No. Description No. Description
F1 1 F3

Copyright (c) GS E&C. All Rights Reserved


09/07/2024

Project Na. : Piperack BH09-11


Calculation Sheet
of Project No. : 023_Ba1-16

Foundation Client : CMP Page 2

CONTENTS

1. DRAWING
1.1 LOCATION PLAN & DETAIL SKETCH

2. FOUNDATION DATA
2.1 FOOTING AND SECTION DATA

Copyright (c) GS E&C. All Rights Reserved


09/07/2024 Page 3

1. DRAWING REFERENCE DWGS


NO. DWG NO. DWG TITLE
A01

2
NOTES
* OUTPUT UNIT : mm

01

Piperack BH09-11 PROJECT

FOUNDATION LOCATION PLAN


CONVEYOR8_1

SQUAD CHECK
Y 1
PROCESS PIPING VESSELS STRUCT. ELEC. INST.

F3

Z X SCALE JOB NO. MICROFILM NO.

AS SHOWN 023_Ba1-16

Copyright (c) GS E&C. All Rights Reserved


09/07/2024 Page 4

2.2 DETAIL SKETCH

OUTPUT UNIT : mm

Copyright (c) GS E&C. All Rights Reserved


09/07/2024 Page 5

REFERENCE DWGS
NO. DWG NO. DWG TITLE
CL FOOTING

2200
1100x2

400
2

NOTES
* OUTPUT UNIT : mm
CL FOOTING

4200

3400

Piperack BH09-11 PROJECT


400

1 FOUNDATION DETAIL FOR


F3

SQUAD CHECK
FOUNDATION PLAN

PROCESS PIPING VESSELS STRUCT. ELEC. INST.

SCALE JOB NO. MICROFILM NO.

REV. DATE DESCRIPTION DRWNCHKD APPD APPD APPD


AS SHOWN 023_Ba1-16

Copyright (c) GS E&C. All Rights Reserved


09/07/2024 Page 6

REFERENCE DWGS
NO. DWG NO. DWG TITLE

CL FOOTING

TOP BOTTOM

TYP.
50
NOTES
* OUTPUT UNIT : mm

D10@100

D10@100
Piperack BH09-11 PROJECT

FOUNDATION DETAIL FOR


F3
D10@100
D10@100

SQUAD CHECK
REINFORCEMENT PLAN

PROCESS PIPING VESSELS STRUCT. ELEC. INST.

SCALE JOB NO. MICROFILM NO.

REV. DATE DESCRIPTION DRWNCHKD APPD APPD APPD


AS SHOWN 023_Ba1-16

Copyright (c) GS E&C. All Rights Reserved


09/07/2024 Page 7

600
400
LEAN CONC. 50 THK

1
ELEVATION S1 - X

OUTPUT UNIT : mm

Copyright (c) GS E&C. All Rights Reserved


09/07/2024 F3 Item No. Page 8

1 2
400 400
50 50
106.25 106.25 106.25 106.25
TYP. TYP.
187.5 187.5

106.25 106.25

106.25 106.25
187.5

187.5
400

400
D10 D10

24-D10 24-D10
75 PR.

75 PR.
30 GR.

30 GR.
75

75
D10 100

D10 100
@250

@250
800

800
D10 125 D10

125

Copyright (c) GS E&C. All Rights Reserved


09/07/2024

Project Na. : Piperack BH09-11


Calculation Sheet
of Project No. : 023_Ba1-16

Foundation Client : CMP Page 9

2. FOUNDATION DATA
2.1 FOOTING AND SECTION DATA
( mm ) Ft. Name F3
Ft. Type MAT
2200 Area 9.240 m2
Ft. Thickness 400.00 mm
400 400
Ft. Volume 3.696 m3
2 Ft. Weight 92.400 kN
Soil Height 600.00 mm
Soil Volume 5.352 m3
Soil Weight 85.632 kN
4200

Buoyancy Not Consider


Self Weight (except Pr.SW) 178.032 kN

400 400
800
600

The Origin coordinate


400

The Center of gravity (0,0) mm

Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
3 3
F3 All Direct 3.696 m 5.352 m 6.400 kN

Sec.Name Section Area Ft. Weight Soil Weight Total Weight


S1 9.240 m2 92.400 kN 85.632 kN 184.432 kN

Copyright (c) GS E&C. All Rights Reserved