Floor Plan 3
Floor Plan 3
Floor Plan 3
4.20 4.20
3.00 3.00 F.F.L.
0.30 0.30
F.F.L.
N.G.L. N.G.L.
F.F.L. F.F.L.
N.G.L. 0.30 0.30 N.G.L.
A B E
PAVING CONCRETE BLOCK
CLADDING STUCCO WALL
ALUMINUM FASCIA GUTTER RIDGE LINE RIDGE LINE
DOUBLE SLIDER WINDOW
TOP OF BEAM (UPPER) TOP OF BEAM (UPPER)
RIDGE LINE
0.10 0.10
RIDGE LINE
3.80 3.80
TOP OF BEAM (UPPER) TOP OF BEAM (UPPER)
TOP OF BEAM (LOWER)
0.40 0.40
TOP OF BEAM (LOWER) 4.20 3.40 3.40 4.20
F.F.L. F.F.L.
N.G.L. 0.30 0.30
N.G.L.