20 100 - Revised BOQ
20 100 - Revised BOQ
20 100 - Revised BOQ
Contract ID : 20FO0100
Contract Name : Construction of Water Supply System Level II, Brgy. Balanac, Cabarian,
Catburawan, Maonon, Palapas, San Vicente (Ligao City), Itaran (Polangui),
Karatagan (Pioduran), Burabod ES and Magallang ES (Libon) , Albay
BILL OF QUANTITIES
Part No. Part Description
(Columns (1), (2), (3), and (4) are to be filled up by the Procuring
(Columns (5) and (6) are to be filled up by the Bidder)
Entity)
Site No. 1 Construction of Water Supply System Level II, Brgy. Balanac, Ligao City, Albay
Project
B.5 each 1.00
Billboard/Signboard
In Figures : Pesos
In Words : Pesos In Figures : Pesos
Occupational Safety
B.7 (1) month 2.00
and Health Program
In Figures : Pesos
Mobilization/
B.9 L.S. 1.00
Demobilization
In Figures : Pesos
Structure Excavation
803 (1) a cu.m. 20.49
(Common Soil)
In Figures : Pesos
Structural Concrete
900 (1) b1 cu.m. 6.80
(Class A, 14 days)
In Figures : Pesos
Reinforcing Steel
902 (1) a kg. 1,045.10
(Deformed), Grade 40
In Figures : Pesos
Formworks and
903 (1) L.S. 1.00
Falseworks
In Figures : Pesos
DIVISION II - BUILDINGS
Part D ELECTRICAL
In Words : Pesos In Figures : Pesos
In Figures : Pesos
Part E MECHANICAL
In Words : Pesos In Figures : Pesos
Water Pumping
1201 (1) L.S. 1.00
System
In Figures : Pesos
In Figures : Pesos
In Figures : Pesos
Polyethylene (PE)
1602 (5) L.S. 1.00
Plastic Pipe
In Figures : Pesos
In Figures : Pesos
Site No. 2 Construction of Water Supply System Level II, Brgy. Cabarian, Ligao City, Albay
Project
B.5 each 1.00
Billboard/Signboard
In Figures : Pesos
In Words : Pesos In Figures : Pesos
Occupational Safety
B.7 (1) month 2.00
and Health Program
In Figures : Pesos
Mobilization/
B.9 L.S. 1.00
Demobilization
In Figures : Pesos
Structure Excavation
803 (1) a cu.m. 20.49
(Common Soil)
In Figures : Pesos
Structural Concrete
900 (1) b1 cu.m. 6.80
(Class A, 14 days)
In Figures : Pesos
Reinforcing Steel
902 (1) a kg. 1,045.10
(Deformed), Grade 40
In Figures : Pesos
Formworks and
903 (1) L.S. 1.00
Falseworks
In Figures : Pesos
DIVISION II - BUILDINGS
Part D ELECTRICAL
In Words : Pesos In Figures : Pesos
In Figures : Pesos
Part E MECHANICAL
In Words : Pesos In Figures : Pesos
Water Pumping
1201 (1) L.S. 1.00
System
In Figures : Pesos
In Figures : Pesos
In Figures : Pesos
Polyethylene (PE)
1602 (5) L.S. 1.00
Plastic Pipe
In Figures : Pesos
In Figures : Pesos
Site No. 3 Construction of Water Supply System Level II, Brgy. Catburawan, Ligao City, Albay
Project
B.5 each 1.00
Billboard/Signboard
In Figures : Pesos
In Words : Pesos In Figures : Pesos
Occupational Safety
B.7 (1) month 2.00
and Health Program
In Figures : Pesos
Mobilization/
B.9 L.S. 1.00
Demobilization
In Figures : Pesos
Structure Excavation
803 (1) a cu.m. 20.49
(Common Soil)
In Figures : Pesos
Structural Concrete
900 (1) b1 cu.m. 6.80
(Class A, 14 days)
In Figures : Pesos
Reinforcing Steel
902 (1) a kg. 1,045.10
(Deformed), Grade 40
In Figures : Pesos
Formworks and
903 (1) L.S. 1.00
Falseworks
In Figures : Pesos
DIVISION II - BUILDINGS
Part D ELECTRICAL
In Words : Pesos In Figures : Pesos
In Figures : Pesos
Part E MECHANICAL
In Words : Pesos In Figures : Pesos
Water Pumping
1201 (1) L.S. 1.00
System
In Figures : Pesos
In Figures : Pesos
In Figures : Pesos
Polyethylene (PE)
1602 (5) L.S. 1.00
Plastic Pipe
In Figures : Pesos
In Figures : Pesos
Site No. 4 Construction of Water Supply System Level II, Brgy. Maonon, Ligao City, Albay
Project
B.5 each 1.00
Billboard/Signboard
In Figures : Pesos
In Words : Pesos In Figures : Pesos
Occupational Safety
B.7 (1) month 2.00
and Health Program
In Figures : Pesos
Mobilization/
B.9 L.S. 1.00
Demobilization
In Figures : Pesos
Structure Excavation
803 (1) a cu.m. 20.49
(Common Soil)
In Figures : Pesos
Structural Concrete
900 (1) b1 cu.m. 6.80
(Class A, 14 days)
In Figures : Pesos
Reinforcing Steel
902 (1) a kg. 1,045.10
(Deformed), Grade 40
In Figures : Pesos
Formworks and
903 (1) L.S. 1.00
Falseworks
In Figures : Pesos
DIVISION II - BUILDINGS
Part D ELECTRICAL
In Words : Pesos In Figures : Pesos
In Figures : Pesos
Part E MECHANICAL
In Words : Pesos In Figures : Pesos
Water Pumping
1201 (1) L.S. 1.00
System
In Figures : Pesos
In Figures : Pesos
In Figures : Pesos
Polyethylene (PE)
1602 (5) L.S. 1.00
Plastic Pipe
In Figures : Pesos
In Figures : Pesos
Site No. 5 Construction of Water Supply System Level II, Brgy. Palapas, Ligao City, Albay
Project
B.5 each 1.00
Billboard/Signboard
In Figures : Pesos
In Words : Pesos In Figures : Pesos
Occupational Safety
B.7 (1) month 2.00
and Health Program
In Figures : Pesos
Mobilization/
B.9 L.S. 1.00
Demobilization
In Figures : Pesos
Structure Excavation
803 (1) a cu.m. 20.49
(Common Soil)
In Figures : Pesos
Structural Concrete
900 (1) b1 cu.m. 6.80
(Class A, 14 days)
In Figures : Pesos
Reinforcing Steel
902 (1) a kg. 1,045.10
(Deformed), Grade 40
In Figures : Pesos
Formworks and
903 (1) L.S. 1.00
Falseworks
In Figures : Pesos
DIVISION II - BUILDINGS
Part D ELECTRICAL
In Words : Pesos In Figures : Pesos
In Figures : Pesos
Part E MECHANICAL
In Words : Pesos In Figures : Pesos
Water Pumping
1201 (1) L.S. 1.00
System
In Figures : Pesos
In Figures : Pesos
In Figures : Pesos
Polyethylene (PE)
1602 (5) L.S. 1.00
Plastic Pipe
In Figures : Pesos
In Figures : Pesos
Site No. 6 Construction of Water Supply System Level II, Brgy. San Vicente, Ligao City, Albay
Project
B.5 each 1.00
Billboard/Signboard
In Figures : Pesos
In Words : Pesos In Figures : Pesos
Occupational Safety
B.7 (1) month 2.00
and Health Program
In Figures : Pesos
Mobilization/
B.9 L.S. 1.00
Demobilization
In Figures : Pesos
Structure Excavation
803 (1) a cu.m. 20.49
(Common Soil)
In Figures : Pesos
Structural Concrete
900 (1) b1 cu.m. 6.80
(Class A, 14 days)
In Figures : Pesos
Reinforcing Steel
902 (1) a kg. 1,045.10
(Deformed), Grade 40
In Figures : Pesos
Formworks and
903 (1) L.S. 1.00
Falseworks
In Figures : Pesos
DIVISION II - BUILDINGS
Part D ELECTRICAL
In Words : Pesos In Figures : Pesos
In Figures : Pesos
Part E MECHANICAL
In Words : Pesos In Figures : Pesos
Water Pumping
1201 (1) L.S. 1.00
System
In Figures : Pesos
In Figures : Pesos
In Figures : Pesos
Polyethylene (PE)
1602 (5) L.S. 1.00
Plastic Pipe
In Figures : Pesos
In Figures : Pesos
Site No. 7 Construction of Water Supply System Level II, Brgy. Itaran, Polangui, Albay
Project
B.5 each 1.00
Billboard/Signboard
In Figures : Pesos
In Words : Pesos In Figures : Pesos
Occupational Safety
B.7 (1) month 2.00
and Health Program
In Figures : Pesos
Mobilization/
B.9 L.S. 1.00
Demobilization
In Figures : Pesos
Structure Excavation
803 (1) a cu.m. 20.49
(Common Soil)
In Figures : Pesos
Structural Concrete
900 (1) b1 cu.m. 6.80
(Class A, 14 days)
In Figures : Pesos
Reinforcing Steel
902 (1) a kg. 1,045.10
(Deformed), Grade 40
In Figures : Pesos
Formworks and
903 (1) L.S. 1.00
Falseworks
In Figures : Pesos
DIVISION II - BUILDINGS
Part D ELECTRICAL
In Words : Pesos In Figures : Pesos
In Figures : Pesos
Part E MECHANICAL
In Words : Pesos In Figures : Pesos
Water Pumping
1201 (1) L.S. 1.00
System
In Figures : Pesos
In Figures : Pesos
In Figures : Pesos
Polyethylene (PE)
1602 (5) L.S. 1.00
Plastic Pipe
In Figures : Pesos
In Figures : Pesos
Site No. 8 Construction of Water Supply System Level II, Brgy. Karatagan, Pioduran, Albay
Project
B.5 each 1.00
Billboard/Signboard
In Figures : Pesos
In Words : Pesos In Figures : Pesos
Occupational Safety
B.7 (1) month 2.00
and Health Program
In Figures : Pesos
Mobilization/
B.9 L.S. 1.00
Demobilization
In Figures : Pesos
Structure Excavation
803 (1) a cu.m. 20.49
(Common Soil)
In Figures : Pesos
Structural Concrete
900 (1) b1 cu.m. 6.80
(Class A, 14 days)
In Figures : Pesos
Reinforcing Steel
902 (1) a kg. 1,045.10
(Deformed), Grade 40
In Figures : Pesos
Formworks and
903 (1) L.S. 1.00
Falseworks
In Figures : Pesos
DIVISION II - BUILDINGS
Part D ELECTRICAL
In Words : Pesos In Figures : Pesos
In Figures : Pesos
Part E MECHANICAL
In Words : Pesos In Figures : Pesos
Water Pumping
1201 (1) L.S. 1.00
System
In Figures : Pesos
In Figures : Pesos
In Figures : Pesos
Polyethylene (PE)
1602 (5) L.S. 1.00
Plastic Pipe
In Figures : Pesos
In Figures : Pesos
Site No. 9 Construction of Water Supply System Level II, Burabod Elementary School, Libon East, Albay
Project
B.5 each 1.00
Billboard/Signboard
In Figures : Pesos
In Words : Pesos In Figures : Pesos
Occupational Safety
B.7 (1) month 2.00
and Health Program
In Figures : Pesos
Mobilization/
B.9 L.S. 1.00
Demobilization
In Figures : Pesos
Structure Excavation
803 (1) a cu.m. 20.49
(Common Soil)
In Figures : Pesos
Structural Concrete
900 (1) b1 cu.m. 6.80
(Class A, 14 days)
In Figures : Pesos
Reinforcing Steel
902 (1) a kg. 1,045.10
(Deformed), Grade 40
In Figures : Pesos
Formworks and
903 (1) L.S. 1.00
Falseworks
In Figures : Pesos
DIVISION II - BUILDINGS
Part D ELECTRICAL
In Words : Pesos In Figures : Pesos
In Figures : Pesos
Part E MECHANICAL
In Words : Pesos In Figures : Pesos
Water Pumping
1201 (1) L.S. 1.00
System
In Figures : Pesos
In Figures : Pesos
In Figures : Pesos
Polyethylene (PE)
1602 (5) L.S. 1.00
Plastic Pipe
In Figures : Pesos
In Figures : Pesos
Site No. 10 Construction of Water Supply System Level II, Magallang Elementary School, Libon East, Albay
Project
B.5 each 1.00
Billboard/Signboard
In Figures : Pesos
In Words : Pesos In Figures : Pesos
Occupational Safety
B.7 (1) month 2.00
and Health Program
In Figures : Pesos
Mobilization/
B.9 L.S. 1.00
Demobilization
In Figures : Pesos
Structure Excavation
803 (1) a cu.m. 20.49
(Common Soil)
In Figures : Pesos
Structural Concrete
900 (1) b1 cu.m. 6.80
(Class A, 14 days)
In Figures : Pesos
Reinforcing Steel
902 (1) a kg. 1,045.10
(Deformed), Grade 40
In Figures : Pesos
Formworks and
903 (1) L.S. 1.00
Falseworks
In Figures : Pesos
DIVISION II - BUILDINGS
Part D ELECTRICAL
In Words : Pesos In Figures : Pesos
In Figures : Pesos
Part E MECHANICAL
In Words : Pesos In Figures : Pesos
Water Pumping
1201 (1) L.S. 1.00
System
In Figures : Pesos
In Figures : Pesos
In Figures : Pesos
Polyethylene (PE)
1602 (5) L.S. 1.00
Plastic Pipe
In Figures : Pesos
In Figures : Pesos
TOTAL
(10 sites)
Submitted by:
Date :
Name & Signature of the Representative of Bidder
Position
Name of Bidder