8 7 6 5 4 3 2 1

D D
1400

200
8D13
700 D10-150 STRS.

200
1 1

PEDESTAL DETAIL
TOP VIEW 2 SCALE 1 : 20
APPROVAL FOR CONSTRUCTION DRAWING
SCALE 1 : 10
APPROVED
APPROVED WITH NOTES
C STATUS BACK WITH NOTES
C
NOT APPROVED
DATE :
CONTRACTOR CONSULTANTS OWNER
PT. UWT PT. BECA PT. FFI INDONESIA

200 800 200 200


200

200
B A A B
750

750
D A
100 250
C AC
200

200
LEAN CONCRETE T=50mm LEAN CONCRETE T=50mm D A
(1Pc : 3Ps : 5Kr) (1Pc : 3Ps : 5Kr)
C
LAPISAN BASEC0ARSE T=300mm LAPISAN BASEC0ARSE T=300mm
DIPADATKAN DIPADATKAN CA A D A
LAPISAN GEOGRID MONOLID 40kN x LAPISAN GEOGRID MONOLID 40kN x
40kN 1 LAPIS 40kN 1 LAPIS
LAPISAN SIRDAM T=300mm DIPADATKAN LAPISAN SIRDAM T=300mm DIPADATKAN D A
COMPACTED SOIL COMPACTED SOIL
1400 700 AC
DA C C
C D A DD A

A
SECTION - 1 SECTION - 2 A
SCALE 1 : 10 SCALE 1 : 10 C A

FOUNDATION DETAIL - PIPE RACK BLOCK 4 ( No.25 s/d 32 ) 5

SCALE 1 : 10