SHALLOW POUNDATION ( 5 ) - 22092022
SHALLOW POUNDATION ( 5 ) - 22092022
SHALLOW POUNDATION ( 5 ) - 22092022
D D
1400
200
8D13
700 D10-150 STRS.
200
1 1
PEDESTAL DETAIL
TOP VIEW 2 SCALE 1 : 20
APPROVAL FOR CONSTRUCTION DRAWING
SCALE 1 : 10
APPROVED
APPROVED WITH NOTES
C STATUS BACK WITH NOTES
C
NOT APPROVED
DATE :
CONTRACTOR CONSULTANTS OWNER
PT. UWT PT. BECA PT. FFI INDONESIA
200
B A A B
750
750
D A
100 250
C AC
200
200
LEAN CONCRETE T=50mm LEAN CONCRETE T=50mm D A
(1Pc : 3Ps : 5Kr) (1Pc : 3Ps : 5Kr)
C
LAPISAN BASEC0ARSE T=300mm LAPISAN BASEC0ARSE T=300mm
DIPADATKAN DIPADATKAN CA A D A
LAPISAN GEOGRID MONOLID 40kN x LAPISAN GEOGRID MONOLID 40kN x
40kN 1 LAPIS 40kN 1 LAPIS
LAPISAN SIRDAM T=300mm DIPADATKAN LAPISAN SIRDAM T=300mm DIPADATKAN D A
COMPACTED SOIL COMPACTED SOIL
1400 700 AC
DA C C
C D A DD A
A
SECTION - 1 SECTION - 2 A
SCALE 1 : 10 SCALE 1 : 10 C A
SCALE 1 : 10
A3
8 7 6 5 4 3 2 1