SD-AVK01-WP.02-GEN-DR-008
SD-AVK01-WP.02-GEN-DR-008
SD-AVK01-WP.02-GEN-DR-008
homoulcl.AW��
(©))JLL II Turner &Townsend
[A]
Transmittal for Drawings, Documents, etc (TR)
Project Title The Avenues Khobar Supervision Consultant M/s PACE
Engineer/ PMC M/s Jones Lan!-1 LaSalle (JLL) WP Ref./ Contract No. AVK01
Contractor M/s Ahmadiah Contracting & Trading Co. KSA Branch Date _Q§_/_11_/ 2024
Type: ARF - Approval Req uest Form DAW - Drawing MS - Method Statement QlY - Quantity Remeasurement
AB- As-Built I R - Inspection Request MC - Mockup SD - Shop Drawing
BIM - BIM Model M IR - Material nI spection Request NVS - BIM Coordination TAP - Test Report
CAL - Calculation MD - Material Data OT-Other
D Sample is attached A - Approved, B - Approved as Noted, BR - Approved as Noted, Resubmit, DR - Information Required, C - Not Approved
Contractor Compliance Statement:
In accordance with Sub-Clause 4.1 [Contractor's General Obligations] of the conditions of the Contract, the Contractor notifies the Engineer Yes No
that the referenced submittal and the attached documents fully comply with the Employer's Requirements & the Contract.
Ill □
If the answer is 'No", the Contractor must provide details of the non-compliance in the form 'Compliance Statement' and attach to this transmittal,
__! __ / 2024
date
date
__! __! 2024
date