001 Piping Procedure
001 Piping Procedure
001 Piping Procedure
REV
0
PT.
DATE SHEET
PT CPI - COPY
Page
1.0 Title 3
2. 0 Scope 3
4.0 Unit 3
6.0 Fabrication 3
11.0 Documentation 3
2.0 SCOPE
2.2 Non Metalic Piping as Well as other Spesial Piping which Does not
Comply to ASME 31.3 is not Covered
4.0 UNITS
The Metric units shall be applied as the measurement system Documents and
Drawing. Nominal size of Piping Components shall be measured in Inches.
Which the abbreviation is NPS.
5.1.1 All Drawing and Document which Cover the Piping Construction
Work Shall be listed , issued and Control in accordance with ‘’
Drawing and document Control Procedure.’’
5.1.2 Piping work shall be carried out in Accordance with Drawing and
Document as ‘’ fabrication ‘’ or ‘’ Construction ‘’unless otherwise
instructed.
We, PT. Adhi Karya management and employees at all levels within
organization, have committed in running business cycle to provide the
EXCELLENT SERVICES of our scopes as per contract document to our
customers which have added value for all stakeholders.
9.1 Procedures
9.1.1 The QA/QC Superintendent will assign a QA/QC Inspector who
is responsible for implementation of the Project Quality Plan
(PQP).
The QA/QC Inspector is responsible for establishing and
maintaining Project-specific procedures for construction, quality
control, specific inspection and test plans, site records, non
compliance and test status control.
9.1.2 QA/QC inspector is responsible for implementation of the
Project Quality Plan (PQP), site quality control procedures,
inspection and test plans in line with contractor and owner
specifications and
requirements.
11.0 ATTACHMENTS