TRANSFORMER-1
1250 kVA
22/0.415kV, Dyn11
0IL TYPE
Utilization Factor:
74.36%
LVP-N-C-UP-SS2
LOCATION: REEM HILLS, PHASE 2
CL=2673.22kW
DL=914.84kW
0.70 DIV FACTOR @ SS LEVEL
AL/XLPE/SWA/PVC CABLE
4Cx400mm²
N-C-UP-SS2-FP01 (TYPE-B) N-C-UP-SS2-FP02 (TYPE-B) N-C-UP-SS2-FP03 (TYPE-B) N-C-UP-SS2-FP04 (TYPE-B)
TCL=700.02kW TCL=623.08kW TCL=720.01W TCL=630.11KW
TDL=368.41kW TDL=303.45kW TDL=344.36KW TDL=290.68KW
D.F.=0.90 D.F.=0.90 D.F.=0.90 D.F.=0.90
AL/XLPE/SWA/PVC
AL/XLPE/SWA/PVC
AL/XLPE/SWA/PVC
AL/XLPE/SWA/PVC
AL/XLPE/SWA/PVC CABLE
AL/XLPE/SWA/PVC CABLE
AL/XLPE/SWA/PVC CABLE
ISSUED FOR CONSTRUCTION
4C 185mm²
4C 185mm²
4C 185mm²
4C 185mm²
CABLE
CABLE
CABLE
CABLE
4C 25mm²
4C 25mm²
4C 25mm²
N-C-UP-SS2-FP01/ST01 N-C-UP-SS2-FP02/ST01 N-C-UP-SS2-FP03/ST01 N-C-UP-SS2-FP04/ST01
TCL(kW)= 160.77 TCL(kW)= 155.77 TCL(kW)= 101.08 TCL(kW)= 193.08
TDL(kW)= 89.29 TDL(kW)= 84.29 TDL(kW)= 51.90 TDL(kW)= 95.49
D.F.=1.00 D.F.=1.00 D.F.=1.00 D.F.=1.00
AL/XLPE/SWA/PVC CABLE
AL/XLPE/SWA/PVC CABLE
AL/XLPE/SWA/PVC CABLE
PROJECT NAME
4C 25mm²
4C 25mm²
4C 25mm²
4C 25mm²
REEM HILLS DEVELOPMENT - PHASE 2
N-C-UP-SS2-FP01/ST02 N-C-UP-SS2-FP02/ST02 N-C-UP-SS2-FP03/ST02 N-C-UP-SS2-FP04/ST02
INFRASTRUCTURE AND UTILITIES WORKS
TCL(kW)= 156.62 TCL(kW)= 155.77 TCL(kW)= 206.31 TCL(kW)= 193.08
TDL(kW)= 82.85 TDL(kW)= 84.29 TDL(kW)= 110.24 TDL(kW)= 95.49
D.F.=1.00 D.F.=1.00 D.F.=1.00 D.F.=1.00
AL/XLPE/SWA/PVC CABLE
AL/XLPE/SWA/PVC CABLE
AL/XLPE/SWA/PVC CABLE
4C 25mm²
4C 25mm²
4C 25mm²
4C 25mm²
N-C-UP-SS2-FP01/ST04 N-C-UP-SS2-FP01/ST03 N-C-UP-SS2-FP02/ST04 N-C-UP-SS2-FP03/ST03 N-C-UP-SS2-FP04/ST03
TCL(kW)= 105.23 TCL(kW)= 172.17 TCL(kW)= 155.77 TCL(kW)= 206.31 TCL(kW)= 138.72
TDL(kW)= 58.34 TDL(kW)= 120.52 TDL(kW)= 84.29 TDL(kW)= 110.24 TDL(kW)= 73.66
PROJECT DEVELOPER CONSULTANT
D.F.=1.00 D.F.=1.00 D.F.=1.00 D.F.=1.00 D.F.=1.00
MANAGEMENT REPRESENTATIVE
AL/XLPE/SWA/PVC CABLE
AL/XLPE/SWA/PVC CABLE
AL/XLPE/SWA/PVC CABLE
AL/XLPE/SWA/PVC CABLE
AL/XLPE/SWA/PVC CABLE
4C 25mm²
4C 25mm²
4C 25mm²
4C 25mm²
4C 25mm²
AREA : REEM HILLS - PHASE 2
DRAWING TITLE
N-C-UP-SS2-FP03/ST03
PROPOSED ELECTRICAL
TCL(kW)= 206.31
TDL(kW)= 110.24
D.F.=1.00 POWER NETWORK SINGLE LINE DIAGRAM
N-C-UP-SS2
AL/XLPE/SWA/PVC CABLE
A1 NTS 1 OF 1 00
MS MS CM JI