BAR BENDING SCHEDULE FOR PILE

PROJECT : TANANE BRIDGE


LOCATION : KONKOURE RIVER
CLIENT : GROUP OF ASHAPURA INDUSTRIES
PMC : GLOBAL ARCH
CONTRACTOR : SARVEKSHA BSTP DATE: 19/06/2024
Drawing No. :
Bottom of Pile cap :- RL (+)43.11 mtr. Pile ID:- A4 Inner Dia of Pile :- 900 mm Pil
Sr. Bar Dia of Bar Spacing No. of Cutting Length
Total Length in Meter Unit
Total weight
Member Bar Shape Weight Remarks
No. Description (mm) C/C (mm) Bar (Mtr.) 8Ø 10 Ø 12 Ø 16 Ø 20 Ø 25 Ø 32 Ø (Kg)
(Kg/m)

Vertical main
1 A 25.00 93.00 23.00 7.25 166.75 3.86 643.32

11750
bar
250

730 5500
3 B Helical 10.00 150.00 48.00 2.30 110.40 0.62 68.12

4 C Master Ring 16.00 1,000.00 7.00 2.04 14.25 1.58 22.51

648

300
5 D Lifting Hook 25.00 2.00 0.80 1.60 3.86 6.17
200

300

FOR SARVEKSHA BSTP FOR PMC FOR CLIENT Total Length (m) - 110.40 - 14.25 - 168.35 - 740.12
Unit Weight (Kg/m) 0.40 0.617 0.89 1.58 2.47 3.86 6.32
Total Weight (Kg) - 68.12 - 22.51 - 649.49 -
BAR BENDING SCHEDULE FOR PILE

PROJECT : TANANE BRIDGE


LOCATION : KONKOURE RIVER
CLIENT : GROUP OF ASHAPURA INDUSTRIES
PMC : GLOBAL ARCH
CONTRACTOR : SARVEKSHA BSTP DATE: / /2024
Drawing No. :
Bottom of Pile cap :- RL (+)43.11 mtr. Pile ID:- A4 Inner Dia of Pile :- 900 mm
Sr. Total Length in Meter Unit Weight
Member Bar Description Bar Shape Dia of Bar (mm) Spacing C/C (mm) No. of Bar Cutting Length (Mtr.) Total weight (Kg) Remarks
No. 8Ø 10 Ø 12 Ø 16 Ø 20 Ø 25 Ø 32 Ø (Kg/m)
11750

1 A Vertical main bar 25.00 93.00 30.00 12.60 378.00 3.86 1,458.32
250
730 5500

3 B Helical 10.00 150.00 74.00 2.30 170.20 0.62 105.01


648

4 C Master Ring 16.00 1,000.00 11.00 2.04 22.39 1.58 35.37

300
5 D Lifting Hook 25.00 4.00 0.80 3.20 3.86 12.35
200

300

FOR SARVEKSHA BSTP FOR PMC FOR CLIENT Total Length (m) - 170.20 - 22.39 - 381.20 - 1,611.05
Unit Weight (Kg/m) 0.40 0.617 0.89 1.58 2.47 3.86 6.32

Total Weight (Kg) - 105.01 - 35.37 - 1,470.67 -


BAR BENDING SCHEDULE FOR PILE

PROJECT : TANANE BRIDGE


LOCATION : KONKOURE RIVER
CLIENT : GROUP OF ASHAPURA INDUSTRIES
PMC : GLOBAL ARCH
CONTRACTOR : SARVEKSHA BSTP DATE: / /2024
Drawing No. :
Bottom of Pile cap :- RL (+)43.11 mtr. Pile ID:- A4 Inner Dia of Pile :- 900 mm
Dia of Total Length in Meter Unit
Sr. Spacing No. of Cutting Length Total weight
Member Bar Description Bar Shape Bar Weight Remarks
No. C/C (mm) Bar (Mtr.) 8Ø 10 Ø 12 Ø 16 Ø 20 Ø 25 Ø 32 Ø (Kg)
(mm) (Kg/m)
11750

1 A Vertical main bar 32.00 72.00 64.00 12.60 - 806.40 6.32 5,096.45
250
730 5500

3 B Helical 10.00 150.00 74.00 2.30 170.20 0.62 105.01


648

4 C Master Ring 16.00 1,000.00 11.00 2.04 22.39 1.58 35.37

300
5 D Lifting Hook 32.00 4.00 0.80 3.20 6.32 20.22
200

300

FOR SARVEKSHA BSTP FOR PMC FOR CLIENT Total Length (m) - 170.20 - 22.39 - - 809.60 5,257.05
Unit Weight (Kg/m) 0.40 0.617 0.89 1.58 2.47 3.86 6.32
Total Weight (Kg) - 105.01 - 35.37 - - 5,116.67