Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Combinepdf

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

PREPARED BY:

ADDIS ABABA SCIENCE AND TECHNOLOGY UNIVERSITY INTEGRATED DESIGN PROJECT III LECTURER: Mr. TAMIRAT MIRGA
COLLEGE OF CIVIL ENGINEERING AND ARCHITECTURE KALKIDAN BANTEWESEN ETS0691/13
DEPARTMENT OF ARCHITECTURE
THEMATIC AREA: EDUCATION
THE HOTEL SKYSCRAPPER
FEBEN GURET ETS0497/13
N
PROJECT DESCRIPTION SITE LOCATION LANDMARK SITE SIZE
KOYE FETCHE
SQUARE
THE STREET PROJECT

This is a new skyscrapper hotel with 45 stories (3 ADDIS ABABA


storey basement + ground + 41 floors) in Koye ETHIOPIA
Feche with a 5000sqm area, which could be a place SHEGAR CITY
80 METERS
that's going to feel like home for visitors and locals
alike.
It would include

• Relaxing Rooms
• Local shops
THE THEMATIC
SITE
77METERS
THE PROJECT
• Outdoor Activities SITE
The site is located or the skyscrapper building hotel will be in Shagar city
• Parking along the street that connects koye fetche square with tulu dimtu square
( a street under the new corridor development project) and infront of
Addis Ababa science and technology university.
This hotel will be a meeting place, a gathering spot
for researchers, teachers, and students too. It is TOPOGRAPHIC AND CONTOUR DATA SUN ANALYSIS
needed to bring people together, share ideas, and
create a sense of community. 2175 m
2175 m
2176 m

2176 m

2176 m
2176 m
2177 m
N
2177 m

2176 m
2177 m

2176 m
2177 m
2177 m

2177 m

Contour Analysis: 2175 m to 2177 m


Gentle Slope: The small difference between the minimum and
maximum elevations indicates a relatively gentle slope.
Low-Lying Area: The contour line likely represents a relatively
low-lying area LEGEND
SITE
Potential for Subtle Terrain Features HARSH SUN
-
-

EAST SUN
NORTHING

CONCEPTUAL FRAMEWORK

The major concept of this specific projrct is work life balance.creating a


space which can both be used as a public and private space is our goal to SITE PLAN our site faces towards west making requiring more
this project.through connecting spaces ,the design will achieve providibg a facade treatment and placement arrangements
comfortable workspace for AASTU researchers and other public use
amenties
-
-

+
1395
DN

Communal

HOTEL
space
HOTEL TOWER
10714
-
-

PODIUM
-

VERTICAL ZONNING

SKY VIEW/ VIEW


DECK TOWER
PRESIDENTIAL SUITE
ROOMS
1000

SAUNA, SPA, LIBRARY,


DINNING, CAFE, OFFICES
DN

DELUXE SUITE
ROOMS
1250

FITNESS CENTER, CINEMA,


MEETING HALL, CONFERENCE
HALL, SAUNA, SPA, CAFE

STANDARD ROOM, SUPERIOR


ROOM, FAMILY ROOM.
-

SITE PLAN
-

COMMERCIAL AREA
SALON, BANK, RETAIL
SHOPS, GARMENT SHOPS, CAFE
AND RESTAURANTS
TULUDIMTU TO KOYE ROAD 20 METERS
BASEMENT PARKING

1
N

-
-
ETS0497/13

-
ETS0691/13

-
105 100 101 97 102 107 106 8 6 94 7
105 100 101 97 102 107 106 8 6 94 7
-
-
---
---
104
104
Room
0 m²
16
552

5th - 16th Floor

Room
55 m² 14
786

400 299 400


300

300

10 m² 10 m²
Room Room
11 m²
Room
14
60

140
800

800

211

681
37 m²
942

699
1020

45 m² Room
13 Room 37 m²
220

500

Room
KALKIDAN BANTEWESEN

810
642

810
90

41 m²
Room 9
211

18TH FLOOR
112

325 m²
Room 1 : 125
220

220

565
7TH FLOOR 9
8 m²
630

12 m²
Room
Room
220
12
100

108
776

220 - -
100
4TH FLOOR

- -

105
plan

Not Enclosed
108 MEETING ROOM
630

63 m²
Room
63 m² 31 m²
Room Room
110
600 600 850
796

10
13 m²
Room
DN
31 m²
Room
220

---
630

-
110
UP
268 319
10 m²
362

JANITOR'S ROOM
109
8 m² 767
180 LINEN ROOM
FEBEN GURET

MECHANICAL ROOM
5972

6 m²
ELECTRICAL ROOM 18 m²
109
200

630

737

100
224

300 300 300


Not Enclosed
ROOM
-
109 CONFERENCE
---
10
300

10 m²
0 1200 GARBAGE SHUTTER
404
0
1200
630
370

404
110
31 m²
Room
PREPARED BY:

699
404 10
270

300

299

UP
12
10 m²
GARBAGE CHUTE
8 m²
630

400 ELECTRICAL ROOM 31 m²


Room
249

250

600 600
400
- -
JANITOR'S ROOM
602

UP
-
21 m²
-
108
MECHANICAL ROOM
699
6 m²

19 m²
3000 STAIR 9 m²
212 LINNEN ROOM
186
12 13

101
5 m²
630
210

220

220

220

Room
280 220 359
280
60 659 699
31 m²
430

300 502 Room


360
570

120 60

699
210

210

640
360

15 m² 699
Room
500
140
60

267
370

9
140

767
220

220

477 16
620

767 30 m²
22 m² 24 m² Room
Room 24 m² Room 13
450

450

450

Room
370
250
230

230

230

5 m² 5 m²
60

Room Room
290 290 290 329 7 m²
Room
552

---
699 767 767 767 600 600 767 767 767 699 -
14
16
860

97
767
-
104 -
7 94 6 8 106 107 102 97 101 100 105

102
-
-
-
-
-
-

107
-
-
-
- ---
- ---
---
Room
0 m² 16
16
-
---
Room
56 m²

106
13 Room
39 m²
Room
Room 39 m²
0 m²
13 WOMENS HAIR
SALON
16 110 m²
FLOORPLAN

Room
50 m² 590
1ST AND 2ND

12
3RD FLOOR

BATHROOM BATHROOM
31 m² 37 m²
12
100

DAY CARE
13 100 89 m²
BATHROOM
31 m² BATHROOM
35 m²
10

17TH FLOOR
10

8
12 DN DN
Room Room Room
Room Room Room 18 m² 6 m² 9 m²
9 m² 6 m² 18 m²
Room Room Room
21 m² Not Enclosed
21 m²
Room
36 m² 109
Room Room
Room Room 8 m² 15 m²
15 m² 8 m²
UP
LECTURER: Mr. TAMIRAT MIRGA

-
Room Room Room Room Room ---
Room Room Room Room Room 7 m² 7 m² 7 m² 10 m²
109
6 m²
10 m² 7 m² 7 m² 7 m² 6 m²
10 DN DN
Room
52 m² -
---
110
FLOOR

Room Room Room Room Room


Room Room Room Room Room 7 m² 7 m² 7 m² 7 m² 10 m²
10 m² 7 m² 7 m² 7 m² 7 m²
110
109 Room Room Room Room Room Room Room Room
5 m²
3 m² 5 m² 5 m²
5 m² 5 m² 3 m²
5 m² - -
Room
Room 21 m²

6
21 m²
Room
108 - -
Room 6 m²
6 m² DN DN
-
---
Room Room
18 m²
18 m²
Room Room Room
Room Room Room 18 m² 8 m² 9 m²
9 m² 8 m² 18 m²
- - GYM
Room 805 m²
204 m²
108 - -
110
9 WASH ROOM AND
TOILET
Room Room CHANGING ROOM 102 m²
- 47 m² AND WASH ROOM
48 m²
82 m²
DN DN ---
- Room Room - -
- 46 m²
46 m²
9
108
Room
41 m²
Room
40 m²
Room
40 m² 14

94
14
9 104
7 94 6 8 106 107 102 97 101 100 105
104
14

7
7 94 6 8 106 107 102 97 101 100 105
104
107 102 97 101 100 105
7 94 6 8 106
-
-

BASEMENT 3
109

110

108

104
16

13

12

10

14
9
-
-
-

1 : 150
-
- -
EDUCATION

-
---

-
1466 767

-
-
THE HOTEL SKYSCRAPPER

16

-
786

786
THEMATIC AREA:

13 1572
786 786 786 786
3145
50
Room
786 786 786 786

ENTRANCE 3
Not Enclosed
26

2359
1 5 72 7 86
786

786
786
Room

105
Not Enclosed

105
12

100
7 86 786 786 3 145 7 86 786
100

100

100
767
767
767
SHOP
800

88 m²
UP UP

800

76 7
101

101
300

767
767
10
ENTRANCE 2

767
97

DN

97
7 67
UP
SHOP
66 m²

102

767
109

102
575

107
7200

2734

1200
mechanical room
-

272 m²
-
--- 786 625
801

196 7
1967

107
106

-
luggage room

-
142 m²

1967

3501
DN

UP
110
3131

106
3131

-
-
8
-
Room ---
SHOP

767
619
767
69 m²
56 m²

8
6
- -

76 7
108 UP UP - -

767
767
SHOP 6289
63 m²

6
SHOP

94
65 m²
ADDIS ABABA SCIENCE AND TECHNOLOGY UNIVERSITY

UP
SHOP
COLLEGE OF CIVIL ENGINEERING AND ARCHITECTURE

767
Room 56 m²

699
69 m²

94
7
9

699
786

7
109

110

108

104
786

16

13

12

10

14
9
786
14 Room
Not Enclosed

109

110

108

104
16

13

12

10

14
9
DEPARTMENT OF ARCHITECTURE

GROUND FLOOR PLAN

ENTRANCE 1
104

-
-

BASEMENT 2
1 : 200
-
7 94 6 8 106 107 102 97 101 100 105

3
-
-
ADDIS ABABA SCIENCE AND TECHNOLOGY UNIVERSITY THEMATIC AREA:EDUCATION LECTURER: Mr. TAMIRAT MIRGA
PREPARED BY:
COLLEGE OF CIVIL ENGINEERING AND ARCHITECTURE THE HOTEL SKYSCRAPPER KALKIDAN BANTEWESEN ETS0691/13
DEPARTMENT OF ARCHITECTURE FEBEN GURET ETS0497/13
N
ELEVATION SECTION

SOUTH ELEVATION(RIGHT ELEVA-


EAST ELEVATION(REAR WEST ELEVATION
TION) (FRONT ELEVATION)
VIEW)

Building services and mechanical structures and material

Rainwater harvest-
ing green roof and
water tanks
1. sub-structure
The hotel skyscrapper building facing various loads it is designed to have
combinations of structural elements with different techniques, phases and
layers of the building.
The foundation: Because the soil type on the site is observed to be a black soil
type and with its high clay content and tendency to swell and shrink with
ELEVATORS changes in moisture content, the building will use a pile foundation type. This
type of foundation is done as follows
• Pile Installation: to increase its bearing capacity
• Under-reaming: to enlarge the base of the pile and create an under-reamed
bulb.
STAIRS
• Concrete Filling: to fill the void and provide structural strength.
EMERGENCY EXIT • Curing: in order to achieve its design strength.
STAIRS WILL BE
SECURITY AND
LOCATED 2. Super structure:
TECH CONTROL • Concrete frame with curtain wall
FLOOR :as it is a skyscrapper building and with its need to have integration in its
Amenity floors structural support, fire safety, protection for seismic load and safe building
GREEN ROOF are ventilated structure system also having a thermal balance with the environment.
through natural
e this type of thick concrete wall is used for the core of the building in order to
systems provide a lateral stifness and strength to the building. The building is designed
to use a dual core system which is located on the sides of the towers or on the
center of the podium of the building
COLD WATER LINE
• Concrete columns:
HOT WATER LINE on this Monumental building comcrete columns are used with solid two way
slab. This concrete columns start from the foundation of the building or the
BOILER sub-structure of the building and raises upto the last floor (41st floor) with a
2007

changing rate of dimensions. The columns on the foundation have a dimen-


ESCALATORS
chiller boiler
CHILLER sion of:
pump • The rectangular column have a cross-sectional dimension of 1.5meters by 2
meters width by breadth respectively.
Basement parking 2 • The circular column have a cross-sectional diameter of 2 metres.
floors
HVAC
We will be using the Centralized Chilled Water System with Fan Coil Units (FCUs) This column changes from floor to floor with interval of floors and rate of
for HVAC.A Centralized Chilled Water System with Fan Coil Units (FCU) is a type percentage.
of HVAC (Heating, Ventilation, and Air Conditioning) system commonly used in
commercial and residential buildings.

It provides efficient and flexible temperature control throughout the building.,since


it is a system which is effective at covering bigger spaces compared to the other
ones. It is also centralized which makes it easier to control too.when it comes to
skyscrapers,buildings are highly likely to get temperature and pressur shocks which
needs a solution which happend to be a suitable system for our hotel X mall design

You might also like