Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
35 views9 pages

Test Case ID Test Case Title Description Preconditions Test Data Steps To Execute Expected Result Actual Result Status Comments

Download as docx, pdf, or txt
Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1/ 9

 Test Case ID: A unique identifier for the test case.

 Test Case Title: A brief description of what the test case will
validate.
 Description: Detailed information about the purpose of the
test case and what it will verify.
 Preconditions: Any setup or conditions that need to be met
before executing the test case.
 Test Data: Specific data or inputs required for the test case.
 Steps to Execute: A sequence of actions to perform during
testing.
 Expected Result: The anticipated outcome of the test case.
 Actual Result: The outcome observed after execution (filled
in during testing).
 Status: The result of the test case (e.g., Pass, Fail, Not
Executed).
 Comments: Any additional information or notes related to
the test case.
Example Test Cases

Example 1: Login Functionality with Valid Credentials

Test Case ID: TC001


Test Case Title: Verify Login Functionality with Valid Credentials
Description: This test case verifies that users can log in successfully with valid credentials.
Preconditions: User has a registered account and is on the login page.
Test Data:

 Username: testuser
 Password: Password123

Steps to Execute:

1. Open the login page.


2. Enter the username "testuser" into the username field.
3. Enter the password "Password123" into the password field.
4. Click the "Login" button.

Expected Result: The user should be successfully logged in and redirected to the homepage.
Actual Result: (To be filled in during testing)
Status: (To be filled in during testing)
Comments: (Any additional notes)

Example 2: Add New Item to Shopping Cart

Test Case ID: TC002


Test Case Title: Verify Adding New Item to Shopping Cart
Description: This test case verifies that users can add a new item to their shopping cart.
Preconditions: User is logged in and on the product page.
Test Data:

 Product: Widget A
 Quantity: 1

Steps to Execute:

1. Navigate to the product page for "Widget A".


2. Select the quantity "1".
3. Click the "Add to Cart" button.

Expected Result: The item "Widget A" should be added to the shopping cart with the specified
quantity.
Actual Result: (To be filled in during testing)
Status: (To be filled in during testing)
Comments: (Any additional notes)

Example 3: Password Reset Functionality

Test Case ID: TC003


Test Case Title: Verify Password Reset Functionality
Description: This test case verifies that users can reset their password using the password reset
feature.
Preconditions: User is on the password reset page.
Test Data:

 Registered Email: user@example.com

Steps to Execute:

1. Open the password reset page.


2. Enter the registered email "user@example.com".
3. Click the "Reset Password" button.
4. Check the email for the password reset link.
5. Click the password reset link.
6. Enter a new password and confirm it.
7. Click the "Submit" button.

Expected Result: The user should receive a password reset email, follow the link, and
successfully reset the password.
Actual Result: (To be filled in during testing)
Status: (To be filled in during testing)
Comments: (Any additional notes)

Best Practices for Writing Test Cases

1. Clear and Concise: Ensure that each test case is easy to understand and follow.
2. Specific and Detailed: Provide all necessary details, including test data and
preconditions.
3. Independent: Write test cases that can be executed independently of each other.
4. Traceable: Link test cases to specific requirements or user stories to ensure coverage.
5. Maintainable: Write test cases in a way that they can be easily updated as the application
evolves.
6. Reusable: Structure test cases so they can be reused in different testing scenarios or for
regression testing.

Creating well-structured and detailed test cases helps ensure thorough testing of the application,
leading to higher quality software and a smoother user experience. If you have specific scenarios
or additional requirements, let me know, and I can provide more tailored examples!

A test plan is a detailed document that outlines the strategy, approach, resources, and schedule
for testing activities. It serves as a blueprint for conducting testing and ensures that all aspects of
the testing process are systematically covered. Here is a comprehensive guide to creating a test
plan, including its structure and components:

Structure of a Test Plan

1. Introduction
2. Test Objectives
3. Scope
4. Test Approach
5. Test Environment
6. Test Deliverables
7. Resources
8. Schedule
9. Risk Management
10. Entry and Exit Criteria
11. Test Metrics
12. Approval

Detailed Components of a Test Plan

1. Introduction

 Purpose: Describe the purpose of the test plan and its importance.
 Project Overview: Provide a brief overview of the project, including its goals and
objectives.

2. Test Objectives

 Objectives: Clearly define the goals of the testing process, such as validating
functionality, performance, security, and usability.

3. Scope

 In-Scope: Define the features, functionalities, and components that will be tested.
 Out-of-Scope: Define the features, functionalities, and components that will not be
tested.

4. Test Approach

 Testing Levels: Describe the different levels of testing (e.g., unit testing, integration
testing, system testing, acceptance testing).
 Testing Types: Specify the types of testing to be conducted (e.g., functional, non-
functional, regression, performance, security).
 Test Design: Outline the approach for designing test cases and test scripts.
 Automation: Discuss the extent of test automation and the tools to be used.

5. Test Environment

 Hardware Requirements: Specify the hardware needed for testing.


 Software Requirements: List the software, including operating systems, browsers, and
other applications required.
 Test Data: Describe the test data needed and how it will be prepared.

6. Test Deliverables

 Documents: List the documents to be delivered during and after the testing process (e.g.,
test plan, test cases, test scripts, test summary report).
 Reports: Specify the types of reports to be generated (e.g., defect reports, test execution
reports).

7. Resources
 Test Team: Identify the members of the test team and their roles and responsibilities.
 Training: Describe any training or skill development required for the test team.

8. Schedule

 Timeline: Provide a detailed timeline for testing activities, including start and end dates.
 Milestones: Identify key milestones and deliverables.

9. Risk Management

 Risks: Identify potential risks that could impact the testing process.
 Mitigation: Outline strategies for mitigating identified risks.

10. Entry and Exit Criteria

 Entry Criteria: Define the conditions that must be met before testing can begin.
 Exit Criteria: Define the conditions that must be met before testing can be concluded.

11. Test Metrics

 Metrics: Specify the metrics to be used for measuring test progress and effectiveness
(e.g., test case execution rate, defect density, defect discovery rate).

12. Approval

 Sign-off: Identify the stakeholders who need to approve the test plan.

Example Test Plan Outline

1. Introduction
Purpose: This test plan outlines the strategy and approach for testing the new customer
relationship management (CRM) system.
Project Overview: The CRM system aims to streamline customer interactions and improve sales
tracking.

2. Test Objectives
Objectives: Validate that the CRM system meets functional requirements, performs efficiently,
and is secure.

3. Scope
In-Scope:

 Contact management
 Lead tracking
 Sales reporting
Out-of-Scope:
 Integration with third-party applications

4. Test Approach
Testing Levels:

 Unit Testing
 Integration Testing
 System Testing
 User Acceptance Testing
Testing Types:
 Functional Testing
 Regression Testing
 Performance Testing
 Security Testing
Test Design: Test cases will be designed based on the functional requirements and use
cases.
Automation: Selenium will be used for automating regression tests.

5. Test Environment
Hardware Requirements:

 Windows Server
 8 GB RAM
Software Requirements:
 Windows 10
 Chrome, Firefox, Edge browsers
 CRM application build
Test Data: Synthetic test data representing various customer scenarios will be created.

6. Test Deliverables
Documents:

 Test Plan
 Test Cases
 Test Scripts
 Test Summary Report
Reports:
 Defect Reports
 Test Execution Reports

7. Resources
Test Team:

 John Doe, Test Manager


 Jane Smith, Senior QA Engineer
 Alice Johnson, QA Engineer
Training: Team training on the new CRM features and the Selenium tool.

8. Schedule
Timeline:

 Test Planning: July 1 - July 7


 Test Case Design: July 8 - July 14
 Test Execution: July 15 - July 31
 Test Closure: August 1 - August 3
Milestones:
 Test Plan Review: July 7
 Test Case Sign-off: July 14
 Test Execution Completion: July 31

9. Risk Management
Risks:

 Delays in test environment setup


 Incomplete test data preparation
Mitigation:
 Schedule buffer time for environment setup
 Allocate additional resources for test data preparation

10. Entry and Exit Criteria


Entry Criteria:

 Test environment is set up


 Test data is prepared
Exit Criteria:
 All planned tests executed
 No critical defects remain open

11. Test Metrics


Metrics:

 Test Case Execution Rate


 Defect Density
 Defect Discovery Rate

12. Approval
Sign-off:

 Project Manager: Mary Green


 Product Owner: Tom White
Creating a detailed test plan helps ensure that testing activities are well-organized, efficient, and
aligned with project objectives. It serves as a roadmap for the test team and provides clarity to all
stakeholders involved. If you need more specific details or examples for certain sections, feel
free to ask!

4o
est Case ID: A unique identifier for the test case.
1. Title/Description: A concise description of the purpose of the test case.
2. Test Objective: The specific goal or objective of the test.
3. Preconditions: Any necessary conditions that must be met before the test is executed.
4. Test Steps: A step-by-step sequence of actions to perform during the test.
5. Input Data: The data or parameters to be used as input for the test.
6. Expected Results: The anticipated outcomes or behaviors after executing the test
steps.
7. Actual Results: The actual outcomes observed when executing the test.
8. Test Environment: Details about the system, hardware, software, and configurations
used for testing.
9. Test Data Preparation: Instructions on how to set up the required test data.
10. Test Execution Date: The date and time when the test was executed.
11. Test Execution Status: The pass/fail status of the test case after execution.
12. Test Conclusion: A summary of the results and observations of the test.
13. Test Verdict: A judgment about the overall success of the test.
14. Bug Details (optional): If a defect is identified, details about the issue, its
severity, and steps to reproduce it. Generally teams will manage the bugs found in
another dashboard, but if you want to link the bug found to a specific test case, you can
totally include this field there
15. Attachments: Any relevant files, screenshots, or documentation associated with
the test.
16. Test Case Author: The person responsible for creating the test case.
17. Test Case Reviewer: The person who reviewed and approved the test case.
18. Test Case Version: The version or revision number of the test case.
19. Notes/Comments: Additional information, insights, or comments related to the
test case.

You might also like