Material Requirements and Cost (1)
Material Requirements and Cost (1)
Material Requirements and Cost (1)
Subtotal 12321
Contingency 10% 1464.525
TOTAL 1464.525
Actitivies Needed materials Quantity Unit Price(php)
Ocular survey Measuring tape 1m 45
Stick 4 piece 15
Tela/flaglets 2m 45
Notebook 1 piece 15
Ballpen 1 piece 10
String/nylon thread 1 roll 250
Landpreparation Bolo 1 piece 250
Sickle 1 piece 300
Herbicide 1L 1,300
Sprayer 1 piece 567
Amonium 2 kg 40
Gasoline 3L 56
grasscutter 2L 3500
Shovel 1 piece 350
Digging bar 1 piece 650
Pick mattock 1 piece 270
Grab hoe 1 piece 250
Plastic mulch 1 roll 1200
Production of planting materials Seedtray 10 piece 20
Vermicast 4 kg 15
Coconut husk kg 85
Seeds of Eggplant 2 pack 85
Seeds of Sweetpepper 2 pack 85
Seed of String beans grams
Seed of Squash 1 pack 85
Seed of Tomato 2 pack 85
Seeds of Sweetcorn grams
Seeed of Lady's finger 2 pack 85
Seed of Cucumber 2 pack 85
Seeds of Sponge gourd 1 pack 85
Seeds of Pechay 1 pack 85
Care and maintenance
Watering Sprinkler 1 piece 250
weeding
application of fertilizer Urea 50 kg 37
Complete 50 kg 40
Replanting
IPM Gold SC20 Insecticide 500 L 480
Cymbush 250 250
Trellissing Bamboo pole 60 piece 10
White twine 1 roll 100
Black twine 1 roll 250
M and E
Harvesting Prunning shear 5,300
Grafting Knife 280
Basket 355
Marketing Plastic celophane/ 63
Weighing scale 950
Total
Activities Quantity Unit Rate per day No. of days
Clearing 1 MD Contract 1 1200
Land Preparation 1 MD 800 1.25 1000
Planting 1 MD 300
Watering MD Contract 1 150
weeding 1 MD 450 1
application of fertilizer 2 MD 450 Contract
Spraying herbicide and Insecticide 1 MD 250 1
Replanting
IPM
Trellising 1 MD 450 1
M and E
Marketing