DETAILS OF OPENINGS

600
100
1 DOOR D 1000X2100
C1 C1 C1 C1 C1 2 WINDOW W 1200X1200
3 VENTILATOR V 1200X900

300
W1- 6950 W1-11550 W1- 11550 4 ROLLING SHUTTER RS 3000X2100

200
W1- 7600 300

W2- 7600

W2- 7600

W1- 7600
300 THK 300 THK 300 THK NOTES:
1. ALL DIMENSIONS ARE IN mm AND LEVEL ARE IN m. UNLESS
GRADE SLAB GRADE SLAB GRADE SLAB OTHERWISE SPECIFIED.
2. FIGURED DIMENSIONS ONLY SHALL BE FOLLOWED.
3. R.C.C. DESIGN MIX M-30 CONFORMING TO IS:456-2000 SHALL BE
USED FOR ALL RCC WORKS AND AS PER TECHNICAL
SPECIFICATIONS OF THE CONTRACT.
4. M-15 GRADE OF CONCRETE SHOULD BE USED FOR PCC WORKS
5. CLEAR COVER TO MAIN REINFORCEMENT SHALL BE AS FOLLOWS
* FOR FOOTING = 50mm * FOR BEAMS = 25mm
* FOR COULMN = 40mm * FOR SLAB = 25mm
6. THE SUMP IS DESIGNED FOR EARTHQUAKE LOADING CONFIRMING
TO IS:1893.
7. SAFE BEARING CAPACITY OF SOIL IS CONSIDERED 150kN/m 2 AS
W1- 6950 W1-11550 W1- 11550 PER REPORT FROM THE CONTRACTOR AND THE SAME SHALL BE
ENSURED AT SITE.
8. ALL REINFORCEMENT SHALL BE IN FORM OF HIGH STRENGTH
C1 C1 C1 C1 C1 COLD ROLLED DEFORMED STEEL BARS OF GRADE Fe 550
CONFIRMING TO IS:1786-2008
9. STANDARD 'L' HOOKS SHALL BE PROVIDED AT THE ENDS OF ALL

PLAN AT +0.450M BARS.


10. LAP LENGTH SHALL BE AS FOLLOWS: a. FOR WALL FOOTING AND
WALLS BELOW BASE SLAB - 50xD. b. ALL OTHER LOACATIONS -
49xD. WHERE 'D' IS DIA OF BARS.
11. LAPS SHALL BE STAGGERED AND AVOIDED AT THE SECTIONS OF
+4.650M +4.650M +4.650M
MAX. BENDING MOMENT.
200 200
12. REINFORCEMENT SHALL BE PROVIDED AS PER IS:456, SP:34 &
IS:13920.
200 13. REINFORCEMENT SHALL BE PROVIDED AS PER SP:34 IN THE
HOLES / OPENINGS / CUTOUTS.
14. ALL JUNCTIONS OF COLUMN / BEAM / WALL / SLAB SHALL BE
PROVIDED AS PER SP:34.
15. ALL JOINTS SHALL BE PROVIDED AS PER IS:3370
OPENING 16. FOR LOCATION / LEVELS OF PIPES REFER GAD DRAWINGS.
300X300 17. ALL ROLLED / STEEL SECTIONS SHALL BE TESTED BEFORE
+3.550M FSL +3.550M +3.550M CONSTRUCTION.
PUMP WATER WATER EARTH
18. ANY DISCREPANCY / ERROR IN STRUCTURAL AND OTHER
HOUSE SIDE SIDE SIDE DRAWINGS SHALL BE BROUGHT TO THE NOTICE BEFORE
CONSTRUCTION.
19. HORIZONTAL REINFORCEMENT IN SHAFT OR WALL SHALL HAVE

1200
LAP LENGTH 1.4 TIMES THE DEVELOPMENT LENGTH IN TENSION.
20. IN SHAFT OR WALL NOT MORE THAN ONE THIRD OF VERTICAL
12 @125c/c 12 @150c/c
BARS SHALL BE SPLICED AT ANY SECTION.
1200 21. MANHOLE SHALL BE PROVIDED WITH CAST IRON FITTINGS AT
TOP.
22. SITE TO DECIDE REBAR LAP LOCATIONS AVOIDING ANY LAPPING
IN NO LAPPING ZONE.
ALTERNATE BAR
23. LAPS SHALL BE STAGGERED WITH NOT MORE THAN 50% OF
CURTAILED
BARS LAPPED AT SAME LOCATION.
24. ALL LAPS SHALL BE 1.3 TIMES 'Ld' OF THE HIGHER DIAMETER

200
10 @150c/c 10 @75c/c BAR

12 @125c/c 12 @150c/c 12 @150c/c


2000

+12 @150c/c +12 @150c/c


HAUNCH HAUNCH HAUNCH
200X200 200X200 200X200
10 @150c/c 10 @150c/c 10 @150c/c
HAUNCH
200X200 10 @150c/c 10 @150c/c
12 @100c/c 16 @150c/c 16 @150c/c
12 @150c/c 10 @150c/c 12 @150c/c 10 @150c/c 12 @150c/c 10 @150c/c
+0.450M +0.450M +0.450M

300
300

300

+0.000M +0.000M +0.000M


300 600 300 600 300 600

WALL-W2 SECTION
WALL-W1 SECTION WALL-W1 SECTION WITH DELIVERY CHAMBER

SCHEDULE OF COLUMNS: Client :


SRIRAM PROMOTERS
COIMBATORE
COLUMN NO. OF COLUMN TAMILNADU
REINFORCEMENT DETAILS TIES / LINKS DETAILS
MARKED COLUMN TERMINATION
SECTION A-A LEVEL Name of Work:
SWARNA BHOOMI PHASE - 2ND LAYOUT IN
300 MATHIGIRI OF KRISHNAGIRI DISTRICT
1
2
Title : SWARNA BHOOMI PHASE-2 LAYOUT
X TIES (1- 1 )AS A SET
STRUCTURAL DETAILS OF PROPOSED SUMP
COLUMN TIES SPACING SHALL BE AS FOLLOWS Consultant
450

i) Y10 @ 90MM c/c IN Lo ZONE


2 #605, 2nd Floor, 62nd Cross, 5th Block,
Rajajinagar, Bangalore -560010
ii) Y10 @ 95MM c/c AT BAR SPLICE LOCATION E-mail : rcsepbng@gmail.com, Cell : 9844796550
1
iii) Y8 @ 175MM c/c IN REMAINING ZONE Scale Drawing no. Verified Drawn Date SHEET No.

NTS 01 OF 03